limck007 0 Report post Posted June 18, 2009 At the current stage, i have appointed I-bridge to design. If drawings and quotation is satisfactory.. then i will confirm them n I-bridge will settle the contractor for me... I shouldnt be going after 2 party if engage a id i agreee with u toooo Share this post Link to post Share on other sites
charemme 0 Report post Posted June 18, 2009 good luck in your search Share this post Link to post Share on other sites
limck007 0 Report post Posted June 25, 2009 i am a bit late...but i complied quite a few pointers in my blog. u can check it out. ) thks a lot .. will read through Share this post Link to post Share on other sites