saj 0 Report post Posted June 5, 2009 (edited) Hi guys, as it's our first time dealing with renovation... we need some advice on some portions of the quotations.. - to supply labor & material to construct high pressure laminated wood with door for dustbin area with solid cabinet top - $450 - to supply labor & material to install adjustable toilet window for common & master toilet ventilator window (purchase own ventilator) - $550 - to supply labor & material to box-up 1 sewage pipe for lighting use at master toilet with light holder. (top area only) - $150.00 - to supply labor & material to box-up 2 sewage pipe for lighting use at common toilet with waterproofing board c/w tiles finishes. (full length) - $500 - to supply labor & material to install 3 lever door lock & stopper. - $135.00 Appreciate some advice. TIA! Edited June 5, 2009 by saj Share this post Link to post Share on other sites