Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
stormcontrol

At Long Last, A Place To Call Our Own

Recommended Posts

Looking for good contractors? Click here for your request

Wah, so many replies =). Thanks for all the nice congratulatory msges and well wishes. =)

So I'm a sooner now huh? Well i guess in fast paced singapore, sooner is always better than later =p

Quick updates:

Nothing done to my house today though =(. Although i understand uncle is going through a rough patch with so many manpower changes (especially after reading gaku70's tblog), I still feel a little disappointed.

Called Uncle to find out how things are going to go and he said he wanted to finish up a house in the area today before shifting the entire team from that house to mine. Hopefully tommorrow can start work. So which sooner is having their place finishing up today/tommorrow in the greater TPY/Bishan area? Want to find out about the team that's coming to my place =p

Oh yeah pics to share:

Living room/hallway tile:

DSC00177.jpg

Bedroom tiles:

DSC00178.jpg

Anyone have suggestions on what colour grouting to go with the bedroom tiles? Both my FIL (who was a tiler) and Uncle is suggesting white. FIL because he thinks it looks neater, Uncle because alignment and future changes can be more easily carried out. Any suggestions from you guys? Thanks! =)

Edited by stormcontrol
 

Share this post


Link to post
Share on other sites

75 f***ing sqm.... and I thought mine was small at 85sqm... but nice and cosy for 2 persons and can clean very easily.

Congratulations, Toa Payoh Central, worth it:)

 

Share this post


Link to post
Share on other sites
Called Uncle to find out how things are going to go and he said he wanted to finish up a house in the area today before shifting the entire team from that house to mine. Hopefully tommorrow can start work. So which sooner is having their place finishing up today/tommorrow in the greater TPY/Bishan area? Want to find out about the team that's coming to my place =p

I think he meant my place.. Now, we are still going through the rectification, not sure whether tomorrow can be completed.

Just went there earlier, surprised to see 1 broken tile on the foyer area :bangwall: but they have plastered the uneven walls, changed the hollow tiles, fixed the electrical problems, fix the toilet accessories .. There're still a couple of things undone: final painting and touch-up, replace the broken tiles (don't know who did it) and now still waiting for the tiles to come tomorrow, and just found that there's new scratch on my living room tv console (don't know who did it as well) quite a big scratch so need to ask uncle to replace it as well, polish the solid surface as there're a few white patches, patch up the hole in my storeroom, fix the big mirror in my master bathroom, polish the homo tiles, acid wash for both toilets and eventually the general cleaning...

seems quite a lot of things need to be done, but uncle told me should be completed by tomorrow otherwise they will continue it on Saturday.. I personally think that it's quite impossible to finish by tomorrow.. :(

 

Share this post


Link to post
Share on other sites
I think he meant my place.. Now, we are still going through the rectification, not sure whether tomorrow can be completed.

Just went there earlier, surprised to see 1 broken tile on the foyer area :bangwall: but they have plastered the uneven walls, changed the hollow tiles, fixed the electrical problems, fix the toilet accessories .. There're still a couple of things undone: final painting and touch-up, replace the broken tiles (don't know who did it) and now still waiting for the tiles to come tomorrow, and just found that there's new scratch on my living room tv console (don't know who did it as well) quite a big scratch so need to ask uncle to replace it as well, polish the solid surface as there're a few white patches, patch up the hole in my storeroom, fix the big mirror in my master bathroom, polish the homo tiles, acid wash for both toilets and eventually the general cleaning...

seems quite a lot of things need to be done, but uncle told me should be completed by tomorrow otherwise they will continue it on Saturday.. I personally think that it's quite impossible to finish by tomorrow.. :(

Aargh... Guess he won't start until next week then. Die, later wife will nag at me to chase him one =p

75 f***ing sqm.... and I thought mine was small at 85sqm... but nice and cosy for 2 persons and can clean very easily.

Congratulations, Toa Payoh Central, worth it:)

I'm not looking forward to when kids start coming in though... >_<"

Edited by stormcontrol
 

Share this post


Link to post
Share on other sites
i prefer white tiles actually. looks bright and neat :)

agreed. and reflect light and make house look bigger and brighter! But not too many lah. I don't want to magiclean until die =p

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×