forkie 0 Report post Posted June 21, 2009 Day 2 Another day of hacking. Seems like they progressed pretty well. Have to I supposed since only 3 days of Hacking are approved anyway. Balcony Quite a mess down here. Everywhere is rubble ! Beam They tried hacking bits of the so call "beam" "column" wadever it is. Exact name should be "stiffener" Kitchen The kitchen is in the mess too. Share this post Link to post Share on other sites
forkie 0 Report post Posted June 21, 2009 MBR View From MBR Toilet Toilet loks more or less completed. More or less, quite a lot hacking are done. Left the Stiffener and kitchen area and should be all done. Share this post Link to post Share on other sites
forkie 0 Report post Posted June 21, 2009 (edited) Day 3 Woah ! I must admit I am pretty happy on Day3 when i went up. Hacking was indeed completed and left with some rubbles to clear. After that should be screeding and then tiling will commence i supposed. Balcony Woot ! No more Wall !! And looks very very spacious indeed ! Bedroom3 The storeroom was gone as well ! Edited June 21, 2009 by forkie Share this post Link to post Share on other sites
forkie 0 Report post Posted June 21, 2009 (edited) Kitchen Kitchen is bare as well. Living Sand and tiles are ready ! Was told that they will take another day to clear up all the rubble and next will be ready for screed and tiling. Edited June 21, 2009 by forkie Share this post Link to post Share on other sites
forkie 0 Report post Posted June 21, 2009 (edited) Day 4 I have to go up to check as see if they have delivered what they promised. Indeed the place is pretty much clean up and ready for next stage. Balcony Just love the big area it is now. Beam Bye bye Beam ! Or should I say Stiffener Bedroom2 The sand are ready at Bedroom 2 Edited June 21, 2009 by forkie Share this post Link to post Share on other sites
forkie 0 Report post Posted June 21, 2009 Bedroom3 I can imagine the room is gona be bigger since storeroom is gone. Toilet The Toilet is cleaned up. Dining Yup everything looks ready ! Share this post Link to post Share on other sites
forkie 0 Report post Posted June 21, 2009 Kitchen Kitchen is ready too Living Living room MBR MBR, Will be changing the position of the Door. Share this post Link to post Share on other sites
p3nguins 0 Report post Posted June 23, 2009 ...... wow can't imagine how i'll react when they are carrying out the hacking for my place.. i'll be breaking out in cold sweat hehe Very nice & square though, expected end july? that's pretty fast man.. do we get to visit? Share this post Link to post Share on other sites
skymars 0 Report post Posted June 23, 2009 hi..juz surfing ard...mind if i ask how much is reno cost? Share this post Link to post Share on other sites
forkie 0 Report post Posted June 24, 2009 ...... wow can't imagine how i'll react when they are carrying out the hacking for my place.. i'll be breaking out in cold sweat hehe Very nice & square though, expected end july? that's pretty fast man.. do we get to visit? Sure ! ahaha ! But you like to see reno progress or wait until everything done ah ? Hope everything turn out well **crossed fingers** hi..juz surfing ard...mind if i ask how much is reno cost? eh..... not cheap =/ ID costing is way different from contractors..... The total revamp of my flat is everything go.... Doors, windows, wadever all changed, also fixing the balcony cost me easily 6k..... (P.E endorsement 3k+ for Awning and hacking balcony wall ) -______- Expecting total damage > 50k Share this post Link to post Share on other sites
forkie 0 Report post Posted June 24, 2009 Day 1 Tiling 1st Day of tiling. As read from folks here in Reno that best to keep the tilers happy so early in the morning I bought 8 big bottles of various drink for them. All of my tilers from Malaysia apparently cuz of their deep canto chinese accent. Pretty happy with that as I quite worried if I might get China/Bangala tilers ahaha ! Have quite a healthy discussion with Master Tiler, ID and myself on some tiling preference for toilets. A good learning experience on how to try catch the lining of the tiles to align with shower screen and other stuffs. Hoping to achieve the best alignment to have a clean cut look without any weird variations. End of the day the results looks pretty ok. Progress wise not sure is fast or slow but good quite ok to me Balcony The color of tiles looks pretty good to me. I was still worried if my Lady taste on such color for i prefer something abit more greyish. Balcony close up Close up view. Tiles are dirty since have to step here n there. Lean a trick on that as we need to step in the middle and avoid stepping on the side as the tiles are still not set in. BEST is not to step at all la but if need to... better step in the middle. Grouting still not done yet. But already knew homo tiles are not really even. The best tiler can do is to match the lines but in the middle might will have leg cutting tiles later on. Solution is either grind the tiles abit or try use grouting to smooth out the unevenness... Share this post Link to post Share on other sites
forkie 0 Report post Posted June 24, 2009 Kitchen Wall Kitchen white wall tiles. Have a lines horizontally to have a 3d linear effect. Overall looks pretty all right so far. Common Toilet Wall Hmm hmm hmmm this is supposed to have a mix of light grey and dark grey tiles throughout the common toilet from wall to floor. Turn out they tiled the wall light grey and planned the floor dark grey instead. Since I will have 2 strips of Mosaic tiles running vertically down where shower set is in the middle, the mixing of 2 color tiles throughout the toilet with mosaic might be too complicated and messy. So currently they are tiling Wall light grey and floor dark grey.... Hmmmm should have tell me earlier of the change but nvm lets see how it turn out later. Common Toilet Wall 2 Another side of the wall. Hmmmm duno issit too dark ? Share this post Link to post Share on other sites
forkie 0 Report post Posted June 26, 2009 Day 2 Tiling, Graffiti on the wall ! Yes this is the only time we will vandalize our walls with drawings 1 Wall was not enough to draw so we drew another wall lol Was discussing with ID, Carpenter on how the TV feature will be done. I like it in this manner then leave it to ID solely to finalize everything. I get to understand how they gona construct, the restrictions in reality on carpentry then the drawing in picture. We have to wreck our brains to rectify the design, where in actual there will be a few flaws. Even tiling layout we have to draw and see if it fits the actual dimension of the toliet Share this post Link to post Share on other sites
forkie 0 Report post Posted June 26, 2009 Day 2 3 4 Tiling MBR Toilet Front view of MBR Toilet. The side walls are greyish wall tiles like Common toilet actually. Common Toilet Walls and floors tiles are up. A Simple greyish toilet for this 1. Should be adding 2 mosaic tiles vertically on the shower area later on. Kitchen Kitchen floor tiles are up as well. Still grey :X Maybe we loveed grey too much.... Coz cant use black if not too dark.... so our next option is to use greyish color. =/ Share this post Link to post Share on other sites
forkie 0 Report post Posted June 26, 2009 nice! how much does it cost? my mum is using the 1st light in the pict. Very affordable actually. $57 The 1st light is Room lights ? I find it simple and practical ^_^ Share this post Link to post Share on other sites