Day 2

Another day of hacking.

Seems like they progressed pretty well. Have to I supposed since only 3 days of Hacking are approved anyway.

Balcony

3646524713_6514b227b7.jpg

Quite a mess down here. Everywhere is rubble !

Beam

3647332396_664937a0b1.jpg

They tried hacking bits of the so call "beam" "column" wadever it is. Exact name should be "stiffener"

Kitchen

3646523865_b5c513e064.jpg

The kitchen is in the mess too.

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

MBR

3646518869_db12b1a455.jpg

View From MBR

Toilet

3647331508_f6b04fbf14.jpg

Toilet loks more or less completed.

More or less, quite a lot hacking are done.

Left the Stiffener and kitchen area and should be all done.

 

Share this post


Link to post
Share on other sites

Day 3

Woah ! I must admit I am pretty happy on Day3 when i went up.

Hacking was indeed completed and left with some rubbles to clear.

After that should be screeding and then tiling will commence i supposed.

Balcony

3646519483_d9a46b7090.jpg

Woot ! No more Wall !!

And looks very very spacious indeed ! :D

Bedroom3

3641208611_0e663fc4f2.jpg

The storeroom was gone as well !

Edited by forkie
 

Share this post


Link to post
Share on other sites

Kitchen

3646521049_60e4225fd8.jpg

Kitchen is bare as well.

Living

3647327718_65f328ac39.jpg

Sand and tiles are ready !

Was told that they will take another day to clear up all the rubble and next will be ready for screed and tiling.

Edited by forkie
 

Share this post


Link to post
Share on other sites

Day 4

I have to go up to check as see if they have delivered what they promised.

Indeed the place is pretty much clean up and ready for next stage.

Balcony

3646529363_5bb74848eb.jpg

Just love the big area it is now.

Beam

3647329002_031abb791f.jpg

Bye bye Beam ! Or should I say Stiffener :)

Bedroom2

3646529977_695f6f1314.jpg

The sand are ready at Bedroom 2

Edited by forkie
 

Share this post


Link to post
Share on other sites

Bedroom3

3647336586_a9652bf619.jpg

I can imagine the room is gona be bigger since storeroom is gone.

Toilet

3646527013_c24d3dbef4.jpg

The Toilet is cleaned up.

Dining

3646528339_928eac025d.jpg

Yup everything looks ready !

 

Share this post


Link to post
Share on other sites

Kitchen

3646527785_3781ee8ff3.jpg

Kitchen is ready too

Living

3647335042_5b30d24938.jpg

Living room

MBR

3646531051_95baf74bb7.jpg

MBR, Will be changing the position of the Door.

 

Share this post


Link to post
Share on other sites

...... wow

can't imagine how i'll react when they are carrying out the hacking for my place.. i'll be breaking out in cold sweat hehe :P

Very nice & square though, expected end july? that's pretty fast man.. do we get to visit? :D

 

Share this post


Link to post
Share on other sites
...... wow

can't imagine how i'll react when they are carrying out the hacking for my place.. i'll be breaking out in cold sweat hehe :P

Very nice & square though, expected end july? that's pretty fast man.. do we get to visit? :D

Sure ! ahaha ! But you like to see reno progress or wait until everything done ah ? :P

Hope everything turn out well **crossed fingers**

hi..juz surfing ard...mind if i ask how much is reno cost? :)

eh..... not cheap =/

ID costing is way different from contractors.....

The total revamp of my flat is everything go.... Doors, windows, wadever all changed, also fixing the balcony cost me easily 6k..... (P.E endorsement 3k+ for Awning and hacking balcony wall ) -______-

Expecting total damage > 50k

 

Share this post


Link to post
Share on other sites

Day 1 Tiling

1st Day of tiling.

As read from folks here in Reno that best to keep the tilers happy so early in the morning I bought 8 big bottles of various drink for them.

All of my tilers from Malaysia apparently cuz of their deep canto chinese accent. Pretty happy with that as I quite worried if I might get China/Bangala tilers ahaha !

Have quite a healthy discussion with Master Tiler, ID and myself on some tiling preference for toilets.

A good learning experience on how to try catch the lining of the tiles to align with shower screen and other stuffs.

Hoping to achieve the best alignment to have a clean cut look without any weird variations.

End of the day the results looks pretty ok. Progress wise not sure is fast or slow but good quite ok to me

Balcony

3656230726_a0dcfb527d.jpg

The color of tiles looks pretty good to me. I was still worried if my Lady taste on such color for i prefer something abit more greyish.

Balcony close up

3656231076_d8d7e7871e.jpg

Close up view. Tiles are dirty since have to step here n there. Lean a trick on that as we need to step in the middle and avoid stepping on the side as the tiles are still not set in. BEST is not to step at all la but if need to... better step in the middle.

Grouting still not done yet. But already knew homo tiles are not really even. The best tiler can do is to match the lines but in the middle might will have leg cutting tiles later on. Solution is either grind the tiles abit or try use grouting to smooth out the unevenness...

 

Share this post


Link to post
Share on other sites

Kitchen Wall

3655434883_110213be67.jpg

Kitchen white wall tiles.

Have a lines horizontally to have a 3d linear effect. Overall looks pretty all right so far.

Common Toilet Wall

3655433295_8a016ee03f.jpg

Hmm hmm hmmm this is supposed to have a mix of light grey and dark grey tiles throughout the common toilet from wall to floor.

Turn out they tiled the wall light grey and planned the floor dark grey instead.

Since I will have 2 strips of Mosaic tiles running vertically down where shower set is in the middle, the mixing of 2 color tiles throughout the toilet with mosaic might be too complicated and messy.

So currently they are tiling Wall light grey and floor dark grey.... Hmmmm should have tell me earlier of the change but nvm lets see how it turn out later.

Common Toilet Wall 2

3655433699_849cbdbd9c.jpg

Another side of the wall.

Hmmmm duno issit too dark ?

 

Share this post


Link to post
Share on other sites

Day 2 Tiling, Graffiti on the wall !

3659511612_a96bab7b43.jpg

Yes this is the only time we will vandalize our walls with drawings :P

3658715173_7917f8c3d9.jpg

1 Wall was not enough to draw so we drew another wall lol

Was discussing with ID, Carpenter on how the TV feature will be done.

I like it in this manner then leave it to ID solely to finalize everything.

I get to understand how they gona construct, the restrictions in reality on carpentry then the drawing in picture.

We have to wreck our brains to rectify the design, where in actual there will be a few flaws.

Even tiling layout we have to draw and see if it fits the actual dimension of the toliet :P

 

Share this post


Link to post
Share on other sites

Day 2 3 4 Tiling

MBR Toilet

3658715583_bf45cbf6bb.jpg

Front view of MBR Toilet.

The side walls are greyish wall tiles like Common toilet actually.

Common Toilet

3661949958_fde7e9d587.jpg

Walls and floors tiles are up.

A Simple greyish toilet for this 1. Should be adding 2 mosaic tiles vertically on the shower area later on.

Kitchen

3661149155_b7fcb8af52.jpg

Kitchen floor tiles are up as well.

Still grey :X

Maybe we loveed grey too much.... Coz cant use black if not too dark.... so our next option is to use greyish color. =/

 

Share this post


Link to post
Share on other sites
nice! how much does it cost? my mum is using the 1st light in the pict. :)

Very affordable actually. $57 :)

The 1st light is Room lights ?

I find it simple and practical ^_^

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×