ivy 0 Report post Posted July 22, 2009 he said next wed, will call me again.. the door lock very exp lehz.. 500 bucks right? where did u get it from? can pm me again.. hehe.. uhmm don't wait for him to call. call him next on friday to remind him u are waiting for quote. call him again next monday to remind him again Share this post Link to post Share on other sites
chip&dale 0 Report post Posted July 22, 2009 hehe.. ok.. thanks for all advice.. haha.. should be renovating in Nov or dec.. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted July 22, 2009 ahhh so when I called him he was with you! haha or just spokent o you... Congrats. I hope he gives you a good quote. and yes... do give him a call to remind him. Share this post Link to post Share on other sites
chip&dale 0 Report post Posted July 22, 2009 haha.. he was with me ard 11am.. hehe.. i only tried to call him ard 9-10am today.. he said meet me ard 1130am.. but reached earlier.. wahaha... lucky never fly me planes... will call him on friday to remind him on the quotation.. Share this post Link to post Share on other sites
chip&dale 0 Report post Posted July 30, 2009 yeah.. I finally got my quotation from Uncle Soon.. hmm.. within our budget.. but now need the english version one.. Share this post Link to post Share on other sites
familyof4 0 Report post Posted July 30, 2009 yeah.. I finally got my quotation from Uncle Soon.. hmm.. within our budget.. but now need the english version one.. Lucky u.... sob sob for my case Share this post Link to post Share on other sites
chip&dale 0 Report post Posted July 30, 2009 what happened? Share this post Link to post Share on other sites
blue_diamond 0 Report post Posted July 30, 2009 what happened? she just trying to be drama la...ignore her. Share this post Link to post Share on other sites
chip&dale 0 Report post Posted July 30, 2009 Chip a bit blur* sotong* but now i feel like i'm a stalker to Uncle Soon.. wahahahaa.... Share this post Link to post Share on other sites
blue_diamond 0 Report post Posted July 30, 2009 Chip a bit blur* sotong* but now i feel like i'm a stalker to Uncle Soon.. wahahahaa.... dont worry...u are doing a good job in stalking him...must be persistent. Share this post Link to post Share on other sites
merryman 0 Report post Posted July 30, 2009 (edited) Chip a bit blur* sotong* but now i feel like i'm a stalker to Uncle Soon.. wahahahaa.... Ignore BD lar, F4 never gotten a *written quotation from him, that's why... it's all verbal Edited July 30, 2009 by merryman Share this post Link to post Share on other sites
chip&dale 0 Report post Posted July 30, 2009 can someone be nice and help me see whether the quotation is ok? Professional services $ 1. Apply HDB permit fee FOC Hacking 1 to 11 - 2,100.00 1. Hack off existing 2 toliets floor and wall tiles 2. Hack off existing kitchen floor and wall tiles 3. Hack off existing living, dining and store room floor tiles and skirting 4. Hack off existing 3 bedrooms skirting 5. Discard existing kitchen and toliets sanitary fitting 6. Discard existing kitchen cabinet and clear off site 7. Supply sand and haulage material to door step 8. Clear debris off site 9. Acid washing 2 times for whole unit 10. Provide floor protection using corrugated paper 11. Build a wall to divide the dining area and the kitchen Tiling 1. Supply and lay 2 toliets ceramic/homogeneous floor tiles 2,600.00 2. Apply 2 toliets flooring 3 layer waterproofing treatment FOC 3. Supply and lay ceramic/homogeneous wall tiles at both toilets up to ceiling height 800.00 4. Construct shower kerb for 1 bathrooms FOC 5. Supply and lay ceramic wall tiles at kitchen up to ceiling height 2,900.00 6. Supply and lay kitchen ceramic/homogeneous floor tiles 1,200.00 7. Apply kitchen flooring 3 layer waterproofing treatment FOC 8. Supply and lay homogeneous floor tiles 600mm x 600mm c/w skirting **** & dining & storeroom 3,500.00 9. Supply and lay laminate flooring c/w matching skirting 2,300.00 10. Construct 2" height concrete base c/w tiles for kitchen cabinet , refrigerator and washing machine 380.00 8. Connection of inlet / outlet piping work for new sink FOC 9. Connection of inlet / outlet piping work for washing machine FOC 11. Replacement of old copper piping to stainless steel piping for the whole house (cold water & hot water) 1,100.00 12. Supply ICI Wash & Wear 4+1 colour paints and painting for whole house including bedroom doors, frame, gate and piping 1,200.00 13. Supply and install windows for all and toliets adjustable wire glass lovures windows 2,400.00 14. Supply and install windows grilles for all 1,040.00 15. Supply and install the wrought iron main gate 400.00 16. Supply and install main door (if fire-resistant - add $150) 480.00 17. Supply and install 4 veneer doors and door frames 800.00 18. Install 2 set of sitting Wc bowl 180.00 19. Install 2 set of wash basin and 1 washing sink 150.00 20. Install 1 storage heater 60.00 21. Supply and install 2 set top track alum toliets bi-fold doors 400.00 22. Install 2 set of spray tap FOC 23. Install 2 set of toliets accessories FOC 24. Design and supply vanity top for MBR toliet 800.00 25. Change the door position for the common toliet 200.00 26. Supply and install stainless steel refuse chute 180.00 27. Supply and install tempered glass shower screen with door 450.00 28. Design & fabricate laminated 22ft. top and 22ft. bottom kitchen cabinet c/w ABS trimming, handles, drawer and stainless steel dish tray 4,180.00 29. Flip-up frosted glass door c/w alumix frame for kitchen cabinet (02) pcs 30. Supply and install (01) pc 900mm x750mm stainless steel panel at stove area 31. Install kitchen accessories 32. Design & fabricate laminated 11ft. top and 11ft. bottom master bed room wardrode c/w ABS trimming, handles, drawers 2,200.00 33. Design & fabricate laminated 4ft. Full height shoe cabinet 800.00 34. Supply and install store room shelves 150.00 35. Design & fabricate laminated master bed room bedside tables 400.00 36. Supply and install kitchen sliding door 600.00 37. Supply & install 22ft granite kitchen work top 880.00 38. Mount dryer on top of washing machine FOC 39. Construct cornices for 2 bedrooms FOC Still pending for quotation 1. Construct dining room firbe board false L box lighting pelmet 2. Construct foyer,store and bedrooms entrance firbe board false ceiling 3. Construct living room firbe board false L box lighting pelmet 4. Construct firbe board false curtain pelmet for all except kitchen windows 5. Construct master bedroom firbe board false L box lighting pelmet Share this post Link to post Share on other sites
blue_diamond 0 Report post Posted July 30, 2009 can someone be nice and help me see whether the quotation is ok? Professional services $ 1. Apply HDB permit fee FOC Hacking 1 to 11 - 2,100.00 1. Hack off existing 2 toliets floor and wall tiles 2. Hack off existing kitchen floor and wall tiles 3. Hack off existing living, dining and store room floor tiles and skirting 4. Hack off existing 3 bedrooms skirting 5. Discard existing kitchen and toliets sanitary fitting 6. Discard existing kitchen cabinet and clear off site 7. Supply sand and haulage material to door step 8. Clear debris off site 9. Acid washing 2 times for whole unit 10. Provide floor protection using corrugated paper 11. Build a wall to divide the dining area and the kitchen Tiling 1. Supply and lay 2 toliets ceramic/homogeneous floor tiles 2,600.00 2. Apply 2 toliets flooring 3 layer waterproofing treatment FOC 3. Supply and lay ceramic/homogeneous wall tiles at both toilets up to ceiling height 800.00 4. Construct shower kerb for 1 bathrooms FOC 5. Supply and lay ceramic wall tiles at kitchen up to ceiling height 2,900.00 6. Supply and lay kitchen ceramic/homogeneous floor tiles 1,200.00 7. Apply kitchen flooring 3 layer waterproofing treatment FOC 8. Supply and lay homogeneous floor tiles 600mm x 600mm c/w skirting **** & dining & storeroom 3,500.00 9. Supply and lay laminate flooring c/w matching skirting 2,300.00 10. Construct 2" height concrete base c/w tiles for kitchen cabinet , refrigerator and washing machine 380.00 8. Connection of inlet / outlet piping work for new sink FOC 9. Connection of inlet / outlet piping work for washing machine FOC 11. Replacement of old copper piping to stainless steel piping for the whole house (cold water & hot water) 1,100.00 12. Supply ICI Wash & Wear 4+1 colour paints and painting for whole house including bedroom doors, frame, gate and piping 1,200.00 13. Supply and install windows for all and toliets adjustable wire glass lovures windows 2,400.00 14. Supply and install windows grilles for all 1,040.00 15. Supply and install the wrought iron main gate 400.00 16. Supply and install main door (if fire-resistant - add $150) 480.00 17. Supply and install 4 veneer doors and door frames 800.00 18. Install 2 set of sitting Wc bowl 180.00 19. Install 2 set of wash basin and 1 washing sink 150.00 20. Install 1 storage heater 60.00 21. Supply and install 2 set top track alum toliets bi-fold doors 400.00 22. Install 2 set of spray tap FOC 23. Install 2 set of toliets accessories FOC 24. Design and supply vanity top for MBR toliet 800.00 25. Change the door position for the common toliet 200.00 26. Supply and install stainless steel refuse chute 180.00 27. Supply and install tempered glass shower screen with door 450.00 28. Design & fabricate laminated 22ft. top and 22ft. bottom kitchen cabinet c/w ABS trimming, handles, drawer and stainless steel dish tray 4,180.00 29. Flip-up frosted glass door c/w alumix frame for kitchen cabinet (02) pcs 30. Supply and install (01) pc 900mm x750mm stainless steel panel at stove area 31. Install kitchen accessories 32. Design & fabricate laminated 11ft. top and 11ft. bottom master bed room wardrode c/w ABS trimming, handles, drawers 2,200.00 33. Design & fabricate laminated 4ft. Full height shoe cabinet 800.00 34. Supply and install store room shelves 150.00 35. Design & fabricate laminated master bed room bedside tables 400.00 36. Supply and install kitchen sliding door 600.00 37. Supply & install 22ft granite kitchen work top 880.00 38. Mount dryer on top of washing machine FOC 39. Construct cornices for 2 bedrooms FOC Still pending for quotation 1. Construct dining room firbe board false L box lighting pelmet 2. Construct foyer,store and bedrooms entrance firbe board false ceiling 3. Construct living room firbe board false L box lighting pelmet 4. Construct firbe board false curtain pelmet for all except kitchen windows 5. Construct master bedroom firbe board false L box lighting pelmet what the total damage? Share this post Link to post Share on other sites
chip&dale 0 Report post Posted July 30, 2009 haven't yet.. 34,830 without discount yet.. plus the electrial stuffs haven't add up.. Share this post Link to post Share on other sites
familyof4 0 Report post Posted July 30, 2009 I suggest u wait for the FINAL FINAL discounted pricing...like that better to make comaprison Share this post Link to post Share on other sites