preciousjam 0 Report post Posted July 13, 2009 ah hui already complain about my air con guys ruined one of his tile in MBR....think his heart pain.... if the plumber can't be communicate, just ask Yeak change the tile and redo.....no way gonna accept 2 extra holes there.... Share this post Link to post Share on other sites
sixer 0 Report post Posted July 13, 2009 (edited) glad that i am not the only one complaining about the plumber.. hope that yeak can change his plumbers soon. future yeakers who are reading this, please take note of the plumbers. take leave and monitor them if you can. Edited July 13, 2009 by sixer Share this post Link to post Share on other sites
preciousjam 0 Report post Posted July 13, 2009 glad that i am not the only one complaining about the tiler.. hope that yeak can change his plumbers soon. future yeakers who are reading this, please take note of the plumbers. take leave and monitor them if you can. huh complain about the tiler? Share this post Link to post Share on other sites
tulips 0 Report post Posted July 13, 2009 i tink sixer meant plumber lah coz i tink both of us kenna lousy workmanship frm the plumber. sixer>>> how is ur rectifying work for the tiles??? Share this post Link to post Share on other sites
skyblue 0 Report post Posted July 13, 2009 Wah, that is indeed very frustrating on the problems you mentioned... Hopefully, if can change the tile, then most of the issue(s) should be settled. But I know in your heart, it would be better to change away the plumber, haha... Share this post Link to post Share on other sites
Angel81 1 Report post Posted July 13, 2009 ah hui already complain about my air con guys ruined one of his tile in MBR....think his heart pain.... if the plumber can't be communicate, just ask Yeak change the tile and redo.....no way gonna accept 2 extra holes there.... hee, I also tink should just change the tile. Ask Yeak abt it bah. Hmm, the last time I didn't have any pblms with the plumber leh. Wonder if tat one quit liao or wat. Share this post Link to post Share on other sites
sixer 0 Report post Posted July 13, 2009 huh complain about the tiler? plumber i mean.. paiseh paiseh.. how can i complain about his tilers. Share this post Link to post Share on other sites
preciousjam 0 Report post Posted July 14, 2009 plumber i mean.. paiseh paiseh.. how can i complain about his tilers. ah hui will be heart broken.... Share this post Link to post Share on other sites
tulips 0 Report post Posted July 14, 2009 my hb have spoken to yeak yesterday liao, yeak said that he will change the tiles for us i tink yeak now also should be having a big headache of this plumber le bah... he complained to my mom that he 晚上睡也睡不好... poor yeak... Share this post Link to post Share on other sites
preciousjam 0 Report post Posted July 14, 2009 my hb have spoken to yeak yesterday liao, yeak said that he will change the tiles for us i tink yeak now also should be having a big headache of this plumber le bah... he complained to my mom that he 晚上睡也睡不好... poor yeak... think he'll have that each time he send his plumbers to any jobsite.... Share this post Link to post Share on other sites
kthc 0 Report post Posted July 14, 2009 Last saw Yeak before the PPP, he already looked very tired then. He told us not enough sleep... Share this post Link to post Share on other sites
Angel81 1 Report post Posted July 14, 2009 my hb have spoken to yeak yesterday liao, yeak said that he will change the tiles for us i tink yeak now also should be having a big headache of this plumber le bah... he complained to my mom that he 晚上睡也睡不好... poor yeak... At least they will change for u. Good good. I saw him on Sunday, cuz he came to my place to check my roof (think there's some leaking/moisture seeping). He did look rather tired woh. And after my place still got appts with others. Poor ting.. Share this post Link to post Share on other sites
ivy 0 Report post Posted July 14, 2009 cheer up. most impt is mr yeak agree to change it for you. it is all these silly sub cons that affect the overall job of the main con... but you are not alone lah. it happens in alot of other reno project as well, including mine. what's impt is at least our main con willing to honour their work and get whatever is not satisfactory rectified lor. *pat pat* Share this post Link to post Share on other sites
sixer 0 Report post Posted July 14, 2009 Last saw Yeak before the PPP, he already looked very tired then. He told us not enough sleep... At least they will change for u. Good good. I saw him on Sunday, cuz he came to my place to check my roof (think there's some leaking/moisture seeping). He did look rather tired woh. And after my place still got appts with others. Poor ting.. that was partially my fault cause we discussed our carpentry works till 12am the night before.. Share this post Link to post Share on other sites
kthc 0 Report post Posted July 14, 2009 Haha, I knw, the week before also till nearly 2am right;) We met him on both Saturday mornings, that's why we know Share this post Link to post Share on other sites