Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  

Recommended Posts

Hi All,

As im clueless about reno stuffs, I've decided to post my floorplan here and seek some sound advise.

Welcome all ideas/tips and advise from all seniors here.

My reno will on start only from end 2009, and I know im alittle KS.. but isnt it always good to be prepared in advance? :D

This is my floor plan. Its actually a Jumbo corridor Unit of about 23 years.

(1st lovenest :P)

Floorplan.jpg

At the moment, im still trying to figure the placement of my furnitures.

We are intending do some reno as the house is in quite a shabby condition but we do have a budget constraints.

Another reason, we should be selling the house in the future, so didnt want to spend so much on reno.

Renovation To do List:

Overlay laminate on all bedrooms and hall

complete overhaul for two toilets and kitchen

Tv console (living room)

WIW

Feature wall for WIW (cover-up)

Change new door grills

re-wiring (whole unit)

installl windows grills (corridor rooms and halls)

Optional (depends on cost):

change windows (whole unit)

hmm, that is all i can think of at the moment.

Edited by charemme
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
welcome :)

Wow yr house is very very BIG !

Helo, thank you :)

cuz its a old house mah

you have just gotten your house too yea.

Btw, I have just draft a layout. Hope to see more comments coming in yea :P

Floorplan-placement.jpg

Edited by charemme
 

Share this post


Link to post
Share on other sites

The following quotation was based on my requirement and budget of $27K

Please help me to see if its reasonable.

There is no breakdown of charges thought as ID have already did customised for me.

I have view workmanship and space planning too.

Professional Services

1.Design Consultation

2.Space Planning & Furniture Layout

3. 3D Perspective Drawings

4. Material & colour proposal

5. Project Mgmt

6. Site Supervision

Demolition Works (Includes hacking kitchen cabinet/sink support/rubbish chute)

7.Demolish Existing flooring for Living & Dining -> Omitting

8.Demolish existing flooring for Store ->Omitting

9.Demolish existing kitchen flooring

10.Demolish existing kitchen wall tiles till ceiling height -> Omitting

11.Demolish existing 02 bathrooms flooring

12.Demolish existing 02 bathrooms wall tiles till ceiling height

13.Demolish skirting for whole unit

14.Dismantle sanitary ware & accessories for 02 Bathrooms

15. Haulage services & Debris disposal

Plumbling Works

16. Standard copper piping for whole unit

17.Connection of Inlet/outlet for kitchen sink

18.Supply & Install 02 sets of wc ->Omitting

19.Supply & Install 02 sets of basin -> Omitting

(Installation inclusive for 18 &19, but she omitted supply as the current model is not very nice. Unless i dont mind, she can add in)

20.Provide labour to install accessories for 02 Bathrooms

21. Provide labour to install 02 nos of instant heater

Masonry Works

22. Homo tiles c/w skirtings ****/Dining -> Omitting

23. Laminate floorings for All Bedrooms (3 bedrms)

( based on Supreme AC5 range from Msia, can be changed if i want )

24.Ceramic wall tiles till ceiling height ->Omitting

25. Non-slip Homo design flooring at Kitchen

($2.50 psf)

26.water proofing membrane at Kitchen

27. Ceramic wall till ceiling height for 02 Bathrooms

28. Homo non-slip flooring at 02 Bathrooms

29.Water proofing membrane for 02 Bathrooms

30. Cabinet base c/w tiles finish ->Omitting

31. Fridge base c/w tiles finish ->Omitting

32. Washing machine base c/w tiles finish ->Omitting

(Cabinet is suspended, add $280 only for base if i want cabinet to reach floor, no difference in price for cabinets thou)

Miscellaneous Works

33.Painting of whole Unit (wall & ceiling) w/ ICI emulsion paint

(5 colours/ 3 coatings)

34. Painting of all pipes, doorframes & gate with ICI gloss paint

35.Revanishing of existing main door -> Omitting

(revanishing applicable only for wooden colour door, my door is grey.. so omitted)

36. Cardboard protection for affected areas

37.Chemical washing & General cleaning upon completion

Carpentry Works

38.L20Ft custom-made top & bottom laminated kitchen cabinet c/w ABS trimmings

39.L10ft postform Kitchen worktop -> Omitting

(FOC solid top)

40.S/S 2-tier Dish rack

41.Imported Designer Handles

42.Cutlery Tray

43.Labour to install hood & hod

All omitting Items changed to :

1.Supply & install laminate flooring for Living/dining & 1 bedroom

2.To plaster over existing wall tiles at Kitchen

3. To seal up pipe using partition wall at Kitchen

4. Supply & install L-shape partition wall at Master Bedroom

5.Demolish new door-way at master bathroom

6.Seal up exisiting door way using hollow block at master bathroom

7. Supply & install 10mm tempered swing glass door at Kitchen

8. Supply & instal 10mm tempered swing glass door at Master bathroom

9.Supply & install L shape 10mm tempered glass shower screen at Master Bathroom

10.Supply & install Aluminium bi-fold door at common bathroom

11. Supply & install 8mm Tempered glass backing between top and kitchn cabinet

(aka backsplash)

Total Package for 5rm = $25,288

Additional Items:

12. Design & fabricate walk-in wardrobe in Laminated finish (L1800/6FT) -> $1080

13. Design & fabricate suspended TV console **** hall (L3000) -> $1100

Grand Total = $27,468

Less Discount= ($468)

Final Total = $27,000

FOC Items (while stks last)

10FT solid suface kitchen work top

Colour PVC for all Internal PVC and soft close for all cabinet doors

Hood Cuizino TS92 & Hob 8.3 VCGB(might be replaced if out of stks)

Thanks!

 

Share this post


Link to post
Share on other sites

Haulage & debris cleaning is quote as Item #15.

As for wiring charges for whole unit.. Im asking her to quote me too...

tentatively abt 2k+, but yet to confirm as ID has not see my hse physically.

 

Share this post


Link to post
Share on other sites
Hi All,

As im clueless about reno stuffs, I've decided to post my floorplan here and seek some sound advise.

Welcome all ideas/tips and advise from all seniors here.

My reno will on start only from end 2009, and I know im alittle KS.. but isnt it always good to be prepared in advance? :D

This is my floor plan. Its actually a Jumbo corridor Unit of about 23 years.

(1st lovenest :P)

Floorplan.jpg

At the moment, im still trying to figure the placement of my furnitures.

We are intending do some reno as the house is in quite a shabby condition but we do have a budget constraints.

Another reason, we should be selling the house in the future, so didnt want to spend so much on reno.

Renovation To do List:

Overlay laminate on all bedrooms and hall

complete overhaul for two toilets and kitchen

Tv console (living room)

WIW

Feature wall for WIW (cover-up)

Change new door grills

re-wiring (whole unit)

installl windows grills (corridor rooms and halls)

Optional (depends on cost):

change windows (whole unit)

hmm, that is all i can think of at the moment.

Congrats on your BIG house, who needs landed & condos these days, with your space and the correct planning I'm sure it will be your haven of sanctuary eventually.

I'm not so pro in RENO stuff but if you have any intention to incorporate any wooden kind of flooring to your design, maybe i can be of some help to you...

Good Luck in Planning.

 

Share this post


Link to post
Share on other sites

If possible, get a breakdown on the quotation.

With a breakdown, you can do more customization (take out things that are expensive, etc). I always insist my ID/contractors to do that.

But I think $27K for 5rm quite good leh, mine a lot more 40K+

 

Share this post


Link to post
Share on other sites

I didnt ask for a breakdown, as most of the items are within the $25,888 package for 5rm.

and already omitted alot of items to replace the major one i need.

Additional add-ons, she will indicated the price.

Aiyo, if I have budget of 40K.. I also want to do my house nicely

But i gather not worth to spend so much as we probably be selling the house in another 3 years.

I oso think can squeeze do so many things for 27K, already quite power eh...

So have you confirm your ID??

 

Share this post


Link to post
Share on other sites
Guest poetsdesign

Yeah..

It will be nice palace, your house very big

Why you don't make it become 2 floor?

:paint:

 

Share this post


Link to post
Share on other sites
2 floor? meaning what?

think its refering to 2 levels ba, correct me if i'm wrong....

or you can construct a platform???

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×