familyof4 0 Report post Posted May 8, 2009 how is your reno, Gaku. I am popping by pasir ris to meet Jason, the plumber and electrician tmr... Share this post Link to post Share on other sites
ivy 0 Report post Posted May 8, 2009 how is your reno, Gaku. I am popping by pasir ris to meet Jason, the plumber and electrician tmr... i hope uncle remember to pass the floor laminate to jason... but i think chances quite low... Share this post Link to post Share on other sites
familyof4 0 Report post Posted May 8, 2009 i hope uncle remember to pass the floor laminate to jason... but i think chances quite low... Ivy, suggest u call Jason instead...i trust him to remember. Share this post Link to post Share on other sites
ivy 0 Report post Posted May 8, 2009 Ivy, suggest u call Jason instead...i trust him to remember. late liao.. shy to call.. Share this post Link to post Share on other sites
apples 0 Report post Posted May 8, 2009 (edited) Ivy, you can sms jason also Edited May 8, 2009 by apples Share this post Link to post Share on other sites
growler 0 Report post Posted May 8, 2009 familyof4: Don't think they will go over my side. hacking progress is abit slow. Some windows and wall not hack yet. Don't know why stop work. Uncle brother did said floor hacking must complete first, the rest can do slowly. Don't know how long the hacking will take. Thought within 2 days. Mine today is already third day. ivy, pet: Yes you are right, I think his clients are all the patient lot. My colleague who got the house earlier is less patient and dropped him after two aeroplanes. Gaku: My hacking takes 2 days (including removal of debris, with my help) even though it was only 1 kitchen and 1 MBR toilet. So if you're doing a full unit and takes 3 days, sounds reasonable. There could be snags such as ceramic adhesive which could be hard to hack, especially if it's on the wall. The breaker / hacking equipment is also rather heavy and hot after long usage. I think a combination of these could contribute to the delay. Share this post Link to post Share on other sites
ivy 0 Report post Posted May 8, 2009 Ivy, you can sms jason also ohh jason can read english ah? Share this post Link to post Share on other sites
apples 0 Report post Posted May 8, 2009 ohh jason can read english ah? simple ones can .. use the codes, i think that was what i did Share this post Link to post Share on other sites
gaku70 0 Report post Posted May 9, 2009 how is your reno, Gaku. I am popping by pasir ris to meet Jason, the plumber and electrician tmr... Sorry for the late reply. Just came back from North. Didn't check on the house. Suppose to meet Uncle today to verify tiles. Called him in the afternoon to confirm the meeting tonight. Told me he cannot make it and ask me to check the tiles myself. I did check with him why hacking take so long and was told one of my wall not approved but HDB didn't say why. Guess got to live with it. Now got problem because my sink is too big if the wall cannot hack. Don't can change or not since I already paid fully for it. growler: My hacking took slightly longer, four days. Got to check if everything hack cos the last check, still have outstanding. Share this post Link to post Share on other sites
familyof4 0 Report post Posted May 9, 2009 Sorry for the late reply. Just came back from North. Didn't check on the house. Suppose to meet Uncle today to verify tiles. Called him in the afternoon to confirm the meeting tonight. Told me he cannot make it and ask me to check the tiles myself. I did check with him why hacking take so long and was told one of my wall not approved but HDB didn't say why. Guess got to live with it. Now got problem because my sink is too big if the wall cannot hack. Don't can change or not since I already paid fully for it. growler: My hacking took slightly longer, four days. Got to check if everything hack cos the last check, still have outstanding. Jason very concern when I mentioned that some not happy with Alan's quote...he says scared uncle over worked and has depression...cos he is super stressed by the workload these days. Anything can call Jason. I guess many a times uncle gives us assurance and we felt better...but there are also times when we need to keep a close watch and keep uncle in the loop too. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted May 9, 2009 MmMm Maybe this is the right time to say this... even since you all mentioned about Uncle and Jason being sick and overloaded I've toned down on the recommendations.. I started doing it less since 2-3 weeks ago. I would talk to the person more before I recommend.. I shall talk more about this in my own blog ba Share this post Link to post Share on other sites
gaku70 0 Report post Posted May 11, 2009 Checked on Sunday, lots of sand around and the tiles are delivery. Hurray! Uncle told me on Saturday cementing started but cement bag haven't open yet leh. Anyway back to the hacking. Still outstanding. Called up Uncle brother why haven't finished hacking, cannot be taking 5 days right. He mentioned already finished and so I asked why the wall still there. He told me Uncle never say. Called up Uncle in the today morning and noon. He say haven't go check. Looking at the progress not very optimistic I can move in end of the month. Share this post Link to post Share on other sites
familyof4 0 Report post Posted May 11, 2009 are they waiting for any approval? If yes, that might be the delay? Share this post Link to post Share on other sites
gaku70 0 Report post Posted May 11, 2009 are they waiting for any approval? If yes, that might be the delay? Don't know what is happening as well. Only know kitchen wall half done as uncle told me HDB not approved. But toilet wall didn't mentioned. Uncle brother only mentioned Uncle didnt say must hack. Checked with Uncle adn he told me he will check around noon and called me. So I called him again to ask and he told me havent check yet. I only worry the tiler start to tile the wall which has to be hacked. Share this post Link to post Share on other sites
familyof4 0 Report post Posted May 11, 2009 Don't know what is happening as well. Only know kitchen wall half done as uncle told me HDB not approved. But toilet wall didn't mentioned. Uncle brother only mentioned Uncle didnt say must hack. Checked with Uncle adn he told me he will check around noon and called me. So I called him again to ask and he told me havent check yet. I only worry the tiler start to tile the wall which has to be hacked. sigh...think uncle has to pop by to check already...hopefully nothing goes wrong. Share this post Link to post Share on other sites