gaku70 0 Report post Posted May 22, 2009 Gaku, I think you have no choice but to ask Jason who will be doing the carpentry for you! my preogress speeds up suddenly. keeping my fingers crossed on the whole thing. Cheer up ok? It's friday. bear with it for a while more and it will soon be over! I am prepared to go lay the floors with Hubby on Sunday if it is still not done. booy and smartie did that. Ask them to give you a schedule, elect works and plumbing can go on concurrently. If you are doing false ceilings, ask if they can also be done together. this will minimise lotsa time wastage. Uncle has limited good workers and they are over stretched. I can tell uncle to stop mine for a few days if need be, provided if we are using the came batch of workers. familyof4: I will ask him who is the carpenter tonight. I hope to cheer up but find it difficult. I will try. I am not able to lay the mat due to the rubbish and tiles but if your rubbish is cleared, I think you should be able to do it yourself. Guess it is not too difficult. Remember to ask them to clear the rubbish today. Uncle brother is at my place now. Do you want to call uncle to get his brother to clear your place since he is here. Frankly I don't believe in the schedule that was given. I just check my notebook and this is why uncle told me and I wrote it down. Week 1 : Hacking 3 days and tiling 5 days. End of week 1: Must meet Jason on carpentry. Week 2: Piping, Electrical and carpentry. Week 3: Painting That is why based on the reno work, uncle initially told me he needed only 3 weeks but abit tight. So I gave him another week buffer since my current flat handover is on 1st June. Now I am into the end of Week 3. I saw the false ceiling boards on the floor but L-box was up on tuesday. After that no more progress. Not sure if Jason understand the drawing I gave him. This few evenings I could not check because there is no light. Probably will check tomorrow morning. Please do not ask uncle to stop your reno. I will feel very bad if you do. I have made the decision to use uncle's service and should accept the consequences. I can understand if the workers are overstretched and I can accept schedule to be push back a few days. But I could not take empty promises that I received almost everyday like this week. preciousjam: ok noted, will talk to the carpenter before work starts. Share this post Link to post Share on other sites
familyof4 0 Report post Posted May 22, 2009 *sayang* I know it is not easy for you. Do feel free to call uncle if you really need clarifications and need to chase him. Share this post Link to post Share on other sites
ocheeeng 0 Report post Posted May 22, 2009 Frankly I don't believe in the schedule that was given. I just check my notebook and this is why uncle told me and I wrote it down. Week 1 : Hacking 3 days and tiling 5 days. End of week 1: Must meet Jason on carpentry. Week 2: Piping, Electrical and carpentry. Week 3: Painting Hi gaku70, Shouldn't painting be before carpentry? Share this post Link to post Share on other sites
blue_diamond 0 Report post Posted May 22, 2009 familyof4: I will ask him who is the carpenter tonight. I hope to cheer up but find it difficult. I will try. I am not able to lay the mat due to the rubbish and tiles but if your rubbish is cleared, I think you should be able to do it yourself. Guess it is not too difficult. Remember to ask them to clear the rubbish today. Uncle brother is at my place now. Do you want to call uncle to get his brother to clear your place since he is here. Frankly I don't believe in the schedule that was given. I just check my notebook and this is why uncle told me and I wrote it down. Week 1 : Hacking 3 days and tiling 5 days. End of week 1: Must meet Jason on carpentry. Week 2: Piping, Electrical and carpentry. Week 3: Painting That is why based on the reno work, uncle initially told me he needed only 3 weeks but abit tight. So I gave him another week buffer since my current flat handover is on 1st June. Now I am into the end of Week 3. I saw the false ceiling boards on the floor but L-box was up on tuesday. After that no more progress. Not sure if Jason understand the drawing I gave him. This few evenings I could not check because there is no light. Probably will check tomorrow morning. Please do not ask uncle to stop your reno. I will feel very bad if you do. I have made the decision to use uncle's service and should accept the consequences. I can understand if the workers are overstretched and I can accept schedule to be push back a few days. But I could not take empty promises that I received almost everyday like this week. preciousjam: ok noted, will talk to the carpenter before work starts. Hi Gaku... soory to hear what u going through....cheer up. So how long u intend to rent the new place for?where do u stay? If u dun mind...i can let u have my house to stay for free...provided u dun mind the conidition lor...since it empty also.. Sure PD wont really mind too... Share this post Link to post Share on other sites
gaku70 0 Report post Posted May 22, 2009 Hi gaku70, Shouldn't painting be before carpentry? Carpentry fabricaton completion. The assembly will be only one day or two. That is after painting. Share this post Link to post Share on other sites
ashes02 0 Report post Posted May 22, 2009 hi gaku, my hse still got a room empty, if u dun mind and trust us, u can store some of ur things here till ur reno complete. since we r living quite near to each other, will it be more convenient for u? let me know ya? we wont be shifting in so soon also Share this post Link to post Share on other sites
ocheeeng 0 Report post Posted May 22, 2009 Carpentry fabricaton completion. The assembly will be only one day or two. That is after painting. I see. I initially thought by the word "carpentry" in your schedule, you meant putting up the carpentry Share this post Link to post Share on other sites
gaku70 0 Report post Posted May 22, 2009 Hi Gaku... soory to hear what u going through....cheer up. So how long u intend to rent the new place for?where do u stay? If u dun mind...i can let u have my house to stay for free...provided u dun mind the conidition lor...since it empty also.. Sure PD wont really mind too... I am planning to rent the place for a week in the same block in amk. As the rental place is in the same block and is currently empty, I would negotiate to shift in my stuff bit by bit everyday as I don't have to hire movers. Thanks for the offer. I cannot do that but I am grateful that you are offering help. familyof4: I am feeling better already. Uncle called me twice just now about the aircon location. Think either he forgot or lost my floorplan again. He called me the second time because 2 out of 3 locations have to be changed. Confirmed with him on the piping and he told me the guys just came. Uncle brother is also clearing the rubbish in the background. Have you call him on the rubbish? Next time must call uncle to get things moving. Share this post Link to post Share on other sites
familyof4 0 Report post Posted May 22, 2009 it's the debris With uncle at ur place and getting the works to be done, I am sure u will feel better ya blue, I am quite touched by your offer! Share this post Link to post Share on other sites
gaku70 0 Report post Posted May 22, 2009 hi gaku, my hse still got a room empty, if u dun mind and trust us, u can store some of ur things here till ur reno complete. since we r living quite near to each other, will it be more convenient for u? let me know ya? we wont be shifting in so soon also Thanks for the offer. I am grateful many of the folks here are very helpful. For storage it is not too big a problem. Uncle has told me that 3 bedrooms will be ready except carpentry. So I can store those not important stuff there. Thanks again. Share this post Link to post Share on other sites
gaku70 0 Report post Posted May 22, 2009 it's the debris With uncle at ur place and getting the works to be done, I am sure u will feel better ya blue, I am quite touched by your offer! Yes I feel better after knowing that Uncle is at my place. It is not common to find him there. Sat must buy 4D and Toto. Share this post Link to post Share on other sites
ashes02 0 Report post Posted May 22, 2009 no prob! Uncle is at ur hse now? i feel like going over and pull him over to do my last rectification! Share this post Link to post Share on other sites
gaku70 0 Report post Posted May 22, 2009 no prob! Uncle is at ur hse now? i feel like going over and pull him over to do my last rectification! Yes he is. But you got to be fast because I think he was just there to instruct the aircon guy on the trunking. Don't think he will be there for long. Share this post Link to post Share on other sites
blue_diamond 0 Report post Posted May 22, 2009 I am planning to rent the place for a week in the same block in amk. As the rental place is in the same block and is currently empty, I would negotiate to shift in my stuff bit by bit everyday as I don't have to hire movers. Thanks for the offer. I cannot do that but I am grateful that you are offering help. familyof4: I am feeling better already. Uncle called me twice just now about the aircon location. Think either he forgot or lost my floorplan again. He called me the second time because 2 out of 3 locations have to be changed. Confirmed with him on the piping and he told me the guys just came. Uncle brother is also clearing the rubbish in the background. Have you call him on the rubbish? Next time must call uncle to get things moving. No worries....anytime u need the place before 05/06/09...just PM me... I am just trying to see what i can help in... Share this post Link to post Share on other sites
blue_diamond 0 Report post Posted May 22, 2009 it's the debris With uncle at ur place and getting the works to be done, I am sure u will feel better ya blue, I am quite touched by your offer! Dont say that la...will pai sey de. I mean if i can afford to help...y not? I always believe what comes around goes around....who know i may need help 1 day...i will also wish other will offer..so....no big deal la. Anyway my house just collecting dust to start reno...Gaku need a plc(to save cost also)...y not? Share this post Link to post Share on other sites