vvargis 0 Report post Posted April 15, 2009 Hi Does anyone here know how long it will take to get approval from HDB to demolish a wall in between the kitchen and service balcony. I was told by a contractor that it can take up to 3 weeks. I feel that it is a bit too long. Share this post Link to post Share on other sites
alan26 2 Report post Posted April 15, 2009 Depends, whether it needs a PE to approve. In case where it needs, u need to queue up and the PE have to do their homework check whether would it affects the infrastructure of the building and come down to see, check here and there ba. So it would take longer time la . Share this post Link to post Share on other sites
vvargis 0 Report post Posted April 15, 2009 Depends, whether it needs a PE to approve. In case where it needs, u need to queue up and the PE have to do their homework check whether would it affects the infrastructure of the building and come down to see, check here and there ba. So it would take longer time la . There is no beam here. Its a wall to seperate the service balcony from the kitchen. Share this post Link to post Share on other sites
poseidon_gal 0 Report post Posted April 19, 2009 MY ID told me it will take ard 2 wks to get approval. Share this post Link to post Share on other sites
vvargis 0 Report post Posted May 18, 2009 MY ID told me it will take ard 2 wks to get approval. Yap got the approval after 5 working days to hack the wall down. Share this post Link to post Share on other sites