Reno looking good eh Rasp... *pat back*

hmmm illegal..???.. if it is, my answer is NO, of cos im "not" putting it up.... :P

'cos we don't wanna risk having molds in the toilet, & pretty much to cool the room etc... just the MBR only though...

Hehe.. I see i see. So far, we didn't face problem with molds during our previous stay there. Hence, didn't cross our mind to install one. But this time, our wiw just beside the master bathrm. Not sure it may pose a issue. Will monitor after the reno. Hee.. thanks for bringing up to share with me. :yeah:

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Updates:

These are some of the pics which I took on the first day of plastering.

Hee.. this wall got selected and had the honour to be the 1st smoothy wall.

Before the white paste, the plaster guy was sweeping some liquid on the wall before the plastering. Being curious, I asked him why does he need to brush those liquid. His reason was quite cute. Because the wall was too dry and thirsty, so he must brush these so that the wall won't suck off the liquid from the plaster paste later. :huh: Hee..

Work-in-progress..... the wall after the brushing of the white liquid...

P1020742.jpg

1st wall to be smoothen out.... :D

P1020748.jpg

 

Share this post


Link to post
Share on other sites
Hehe.. I see i see. So far, we didn't face problem with molds during our previous stay there. Hence, didn't cross our mind to install one. But this time, our wiw just beside the master bathrm. Not sure it may pose a issue. Will monitor after the reno. Hee.. thanks for bringing up to share with me. :yeah:

Haha no probz..also with it, supposedly it will help reduce the temperature of the room, keeping it wee bit cooler (theoretically la hee)

Updates:

These are some of the pics which I took on the first day of plastering.

Hee.. this wall got selected and had the honour to be the 1st smoothy wall.

Before the white paste, the plaster guy was sweeping some liquid on the wall before the plastering. Being curious, I asked him why does he need to brush those liquid. His reason was quite cute. Because the wall was too dry and thirsty, so he must brush these so that the wall won't suck off the liquid from the plaster paste later. :huh: Hee..

Work-in-progress..... the wall after the brushing of the white liquid...

P1020742.jpg

1st wall to be smoothen out.... :D

P1020748.jpg

Sweet~

 

Share this post


Link to post
Share on other sites

Updates on plastering:

Hee.. there's alot of corners and beams in my house. So they used alot of the material which is used to 'sharpen' the corners. Previously, I think the material is made of metal. Its only yesterday that I learnt that its actually rubber. The plastering uncle said rubber is lighter and won't rust, so its a better material to be use for the plaster. Learnt something again. :D

This is the rubber thingy used to 'sharpen' the corners.

P1020726.jpg

Here's the rest of the plastered walls.

Taken from near entrance:

P1020874.jpg

Taken from living area:

P1020895.jpg

Taken from the new door:

P1020819.jpg

Taken from the bedrm window:

P1020848.jpg

Edited by Rasp
 

Share this post


Link to post
Share on other sites
Ok rasp,

Now i confirm you are my neighbour after seeing your pics on your balcony view.. ;)

Hey Adeline!

How's your reno plan? Confirm your ID already?

By the way, we noticed that your balcony lights are on last wed and thurs. :D

 

Share this post


Link to post
Share on other sites

Opps really? I hope its not that we forgot to switch it off..

We haven confirm any IDs or contractors yet.. Though have some shortlisted ones already..

Have been spending time to finalize our layout.. Keep having changes after meeting some IDs..

We are intending to start after lunar 7th month.. After yours completed will be ours le.. :D

I think i should start a reno blog too.. :P

 

Share this post


Link to post
Share on other sites
Opps really? I hope its not that we forgot to switch it off..

We haven confirm any IDs or contractors yet.. Though have some shortlisted ones already..

Have been spending time to finalize our layout.. Keep having changes after meeting some IDs..

We are intending to start after lunar 7th month.. After yours completed will be ours le.. :D

I think i should start a reno blog too.. :P

hee.. yes yes.. start a blog!! I also want to see your place. :D

My reno progress is quite ok, plumbling 70% done yesterday, starting electrical works on Monday. Hee.. cant wait to shift back....

So your layout still not finalised? Need help?

Umm.. 7th month just started.. 1 more month before your reno start.. Hee.. by the way, will you be hacking alot of walls? Just to share, the technical officer of our block quite nice man. He approves things quite fast and trust the owner quite abit.. :lol:

 

Share this post


Link to post
Share on other sites
hee.. yes yes.. start a blog!! I also want to see your place. :D

My reno progress is quite ok, plumbling 70% done yesterday, starting electrical works on Monday. Hee.. cant wait to shift back....

So your layout still not finalised? Need help?

Umm.. 7th month just started.. 1 more month before your reno start.. Hee.. by the way, will you be hacking alot of walls? Just to share, the technical officer of our block quite nice man. He approves things quite fast and trust the owner quite abit.. :lol:

Haha ok.. i tried to register a nick but cant seem to get the validation email..

My layout for master bedroom has somehow finalized.. Have been debating this for weeks..

We will be hacking quite a number of walls.. The quotes from the IDs and contractors seems very high..

You have seen my house before mah.. We will be doing major overhaul..

I shall start a blog and get inputs from the friendly ppl in renotalk.. :D

Edited by wonderbeezz
 

Share this post


Link to post
Share on other sites
Haha ok.. i tried to register a nick but cant seem to get the validation email..

My layout for master bedroom has somehow finalized.. Have been debating this for weeks..

We will be hacking quite a number of walls.. The quotes from the IDs and contractors seems very high..

You have seen my house before mah.. We will be doing major overhaul..

I shall start a blog and get inputs from the friendly ppl in renotalk.. :D

Good Morning!

Wow.. we only hack 2 wall. How many walls are you hacking.. then your layout will be different from mine also. hee.. so excited.. can see another version of the layout.

By the way, there are several RT blog with house layout similar to ours. I will pm you their links. You can check them out. Thou our layouts are similar, all the kitchen layout came out differently. Very interesting. :P

I think you can post those items which you think is quote very high and check with the RT folks. They are quite good with it. :)

 

Share this post


Link to post
Share on other sites

Updates:

The electricity meter box was shifted out last Thursday. Still have abit of loose ends to tie. The electrician will continue tomorrow and yes, the rewiring of the whole house also starting tomorrow. :D

Here's the pics:

P1020861.jpg

P1020865.jpg

 

Share this post


Link to post
Share on other sites

hi, hope this pics can help.. :yamseng:

Each panel got one of this rollers on the side..

3852924608_fae1582f57.jpg

Each panel on the top got two of this to hold it and slide in or out..

3852923122_f686feaf43.jpg

3852920750_5c19426770.jpg

Just a thin layer of black mirror stick outside the panel..

3852135801_312800bd37.jpg

 

Share this post


Link to post
Share on other sites

Hi Luckable,

THANKS!!! THANKS!!! THANKS!!! Really appreciate your pictures.

Your 'roll-in' mechanism is very neat and its good as the doors can be kept away when the doors are open.

We cant go for this mechanism as the internal height cant fit our electronic gadget. So we are still doing flap-down for the doors. Hence, we got to stick to the original design due to the hinges. :(

And for the glass part, hb is worried that if the remote controller cant go through the black mirror, we would have to keep the doors flapped down each time we used. This might pose a danger around that area. Hence, we got to stick back to glass.

We hope the design turn out well. We are crossing all our fingers for it. ;)

 

Share this post


Link to post
Share on other sites

Updates:

These are the new floor protection at the living area.

P1020932.jpg

The main door have been removed earlier to protect the marble flooring at the entrance. The main door frame will be removed after the new one is built at the recess area.

P1020934.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×