ocheeeng

Our New Place

Recommended Posts

Guest toilet (Fengshui master said this area must have green color...hmmm..any suggestions?)

Guesttoilet.jpg

Masterbedroom toilet

(Note the full-height frosted window at the shower area...I think outside can see clear shadows at night)

(Need to do something about it...hmmm...maybe put up a shower curtain to block)

IMG_0091.jpg

Edited by ocheeeng
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Master bedroom

Strong afternoon sun (need solar film)

Will construct storage with resting area on bay window

Masterbedroom.jpg

Wardrobe

Just enough for my wife's stuff...mine will be in other rooms :P

Wardrobe1.jpg

Wardrobe2.jpg

Wardrobe3.jpg

 

Share this post


Link to post
Share on other sites

Wall color themes given by Fengshui master:

Foyer: green

Dining: green

Living: green

Guest toilet: green

Guest bedroom: blue

Master bedroom: blue or pink or purple or wood or red

Study room: blue

Utility room: green

Guess it will be a green green house...

 

Share this post


Link to post
Share on other sites

Thanks for the grats.

It is a new condo in Yew Tee.

I saw many units have already moved in or started renovation.

I signed my ID or contractor on 3 Mar 09 and now still discussing the designs :P

Edited by ocheeeng
 

Share this post


Link to post
Share on other sites
Wah seems like your colour is GREEN! heh

Which private place is this? With pool... :) nice!

Fengshui master said my element is strong GOLD and my wife's is strong WOOD.

Green will be good for us :P

 

Share this post


Link to post
Share on other sites

Contract with ID or rather contractor:

Master bedroom

a. Supply labour & material to install plaster board light pelmet with curtain groove line (90sqft)

b. Supply labour & material to fabricate window storage cabinet with solid ply wood,

veneer finish with lift top c/w heavy duty hydraulic piston lift suport c/w build in console player

(2950mm - cannot do after site visit because it will greatly reduce walking space :bangwall: )

(Likely will do a revised contract for this after finalising design)

c. Supply labour & material to install dresser cabinet with solid ply wood, high

pressure laminates, & strip mirror with extra fix door panel next to it

(cabinet: 600mm(W)x250mm(D)x2500mm(H))

Study room

a. Supply labour & material to install work station with set table in solid ply

wood, high pressure laminatess & ABS edging c/w top cabinet in solid ply wood,

high pressure laminate & glass door with aluminium frame

(3600mm - overquoted by double after site visit :bangwall: )

(Likely will do a revised contract for this after finalising design)

b. Supply labour & material to install window ledge in solid ply wood &

veneer finish c/w extension of ledge cum cabinet

(extension: 450mm, total ledge length:1600mm)

Living room

a. Supply labour & material to fabricate suspended shoes cabinet

at foyer area with solid ply wood, high pressure laminate & ABS trimming

(900mm(W) x 300mm(D) x 900mm(H)) x 2 set

(Likely will do a revised contract for this after finalising design)

b. Supply labour & material to fabricate TV wall feature **** room

1) 1500mm x 100mm laminate wall feature with stainless steel inlay

2) 600mm x 2700mm x 5mm wall paper

3) 1500mm x 300mm x 2500mm TV console in solid ply wood, high pressure

laminate & flip down glass door

(Likely will do a revised contract for this after finalising design)

(Depth of TV console seems too short to accommodate players)

c. Supply labour & material to install outdoor timber platform in chengai & varnish finish

at outdoor to level up planter area

d. Supply labour & material to install false ceiling **** room area with plaster board

& MS stel support finishing

e. Supply labour & material to install light pelmet at dining area with plaster board finish

(Likely will do a revised contract for this after finalising design)

Guest bedroom

a. Supply labour & material to install window ledge in solid ply wood & veneer finish

Mscellaneous

a. Supply labour & material to paint whole house wall & ceiling

(ICI: wash & wear, light & space, 3 in 1)

(Nippon: 9000 series or odorless)

b. Supply labour & material to install timber curtain at guest bedroom and studyroom in

solid ply wood & veneer finish

Edited by ocheeeng
 

Share this post


Link to post
Share on other sites

Some of the custom procedures that we have gone through:

Kai men (open door after collecting keys):

Mix rice (uncooked), salt and tea leaves.

Just throw the mixture at the main door and say some good words before opening.

Kai gong (to signify start of renovation):

Bring a hammer tied with red string and knock 3 times at the place suggested by the fengshui master.

Then the contractor can start any date/time after that.

Simple, short and sweet :)

Edited by ocheeeng
 

Share this post


Link to post
Share on other sites
Contract with ID or rather contractor:

Master bedroom

a. Supply labour & material to install plaster board light pelmet with curtain groove line (90sqft)

b. Supply labour & material to fabricate window storage cabinet with solid ply wood,

veneer finish with lift top c/w heavy duty hydraulic piston lift suport c/w build in console player

(2950mm - cannot do after site visit because it will greatly reduce walking space :bangwall: )

(Likely will do a revised contract for this after finalising design)

c. Supply labour & material to install dresser cabinet with solid ply wood, high

pressure laminates, & strip mirror with extra fix door panel next to it

(cabinet: 600mm(W)x250mm(D)x2500mm(H))

Study room

a. Supply labour & material to install work station with set table in solid ply

wood, high pressure laminatess & ABS edging c/w top cabinet in solid ply wood,

high pressure laminate & glass door with aluminium frame

(3600mm - overquoted by double after site visit :bangwall: )

(Likely will do a revised contract for this after finalising design)

b. Supply labour & material to install window ledge in solid ply wood &

veneer finish c/w extension of ledge cum cabinet

(extension: 450mm, total ledge length:1600mm)

Living room

a. Supply labour & material to fabricate suspended shoes cabinet

at foyer area with solid ply wood, high pressure laminate & ABS trimming

(900mm(W) x 300mm(D) x 900mm(H)) x 2 set

(Likely will do a revised contract for this after finalising design)

b. Supply labour & material to fabricate TV wall feature **** room

1) 1500mm x 100mm laminate wall feature with stainless steel inlay

2) 600mm x 2700mm x 5mm wall paper

3) 1500mm x 300mm x 2500mm TV console in solid ply wood, high pressure

laminate & flip down glass door

(Likely will do a revised contract for this after finalising design)

c. Supply labour & material to install outdoor timber platform in chengai & varnish finish

at outdoor to level up planter area

d. Supply labour & material to install false ceiling **** room area with plaster board

& MS stel support finishing

e. Supply labour & material to install light pelmet at dining area with plaster board finish

(Likely will do a revised contract for this after finalising design)

Guest bedroom

a. Supply labour & material to install window ledge in solid ply wood & veneer finish

Mscellaneous

a. Supply labour & material to paint whole house wall & ceiling

(ICI: wash & wear, light & space, 3 in 1)

(Nippon: 9000 series or odorless)

b. Supply labour & material to install timber curtain at guest bedroom and studyroom in

solid ply wood & veneer finish

Wow .. Nice House !!!

 

Share this post


Link to post
Share on other sites

Hi Ocheeeng,

your condo very nice! May I know how much you did for the above listed items? Also, specifically, may i also know the breakdown of cost of doing up the baywindows in each individual room?

 

Share this post


Link to post
Share on other sites
Congrates on ur new place! I stayed in Yew Tee for a while before. It's a nice place. Lots of people jog. hehehe

Angel81,

The surrounding areas of Yew Tee MRT have changed quite a bit.

Now got YewTee Point. YewTee Shopping Centre has also expanded (got a new cafe and also McCafe).

The MRT station itself have 2 foodcourts.

 

Share this post


Link to post
Share on other sites

Some proposed designs given:

Dining area (green...green :))

dining.jpg

Don't know the display cabinet flies so high... :P

Living room (wall is in apple white...cannot really tell it is green right?)

livingroom.jpg

Masterbedroom storage on bay window

masterbedroom_storage.jpg

 

Share this post


Link to post
Share on other sites
Fengshui master said my element is strong GOLD and my wife's is strong WOOD.

Green will be good for us :P

totally same as us!! Hubby strong Gold, me strong Wood (BIG tree in fact!!)

our FS master say Red and Green are good for us. so we r concentrating on more red :)

very nice hse u got there! ;)

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×