preciousjam 0 Report post Posted May 20, 2009 wow...so funny to see the exchange bet them...but i'm glad the officer didn't make things difficult for you.... saw that you've bought alot of stuff...good to be well prepared...you never know when they need the stuff... Share this post Link to post Share on other sites
familyof4 0 Report post Posted May 20, 2009 Ivy, this is so funny! I can imagine uncle in the dialogue! FOr the PD door, i have decided to change it to glass door to save me from any possible problems. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted May 20, 2009 :rofl: :rofl: :rofl: WHAHHAHAHAHAHAHAHHAHAH So Funny!!! Why Uncle LIDDAT?! lol Mr. Ultra Famous Share this post Link to post Share on other sites
Pinklady 0 Report post Posted May 20, 2009 (edited) yeah superstar uncle is so funny. but i have noticed that xvirusga76, you bought furniture from winter? have heard a lot of bad reviews rgd them leh! i tink when your furniture is going to deliver to your home, you better check that many times. Edited May 20, 2009 by Pinklady Share this post Link to post Share on other sites
xvirusga76 0 Report post Posted May 21, 2009 yeah superstar uncle is so funny. but i have noticed that xvirusga76, you bought furniture from winter? have heard a lot of bad reviews rgd them leh! i tink when your furniture is going to deliver to your home, you better check that many times. thanks PinkLady. i am rather worried too.. no choice, only read up abt them after an impulse buy.. going to cross my fingers and toes... hopefully ngt goes wrong when they deliver next month end... quite worried as we went back 2x to alter the size of the custom made sofa... Share this post Link to post Share on other sites
xvirusga76 0 Report post Posted May 21, 2009 Day 2 & 3 Walls come tumbling down initially, i was a little sketical about having to knock so many walls down, as i was told we will have to rebuild them in future when we do sell the flat, hence the hesistant. After this panel of wall came down, i am more than glad to have it totally remove. before after the entrance of the kitchen shall be pushed back by 1m with 4 full height clear glass panels to widen the room. Some minor decisions have been made today, we were given the official quotation, and FH realised that quote only includes changes of switches and points and not rewiring the whole place. Seek Uncle's expertise and he told us no need to, but we decided against it anyways as this unit is a mature unit and rewiring is much advisable. Expected in Day 4 1) delivery of tiles 2) plastering of walls 3) rewiring I wonder if we are in time for the installation of aircon on Monday? Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted May 21, 2009 ... rewiring will cost a lot more isn't it? what is the diff like? Share this post Link to post Share on other sites
growler 0 Report post Posted May 21, 2009 Seems like they've hauled away all the debris Tiling can start tomorrow ! Share this post Link to post Share on other sites
Pinklady 0 Report post Posted May 24, 2009 the room seems to be very spacious after the wall has been taken away. Nice! Share this post Link to post Share on other sites
xvirusga76 0 Report post Posted May 28, 2009 wow, i totally apologize for M.I.A for the past 7 days, much has happened and i am still trying to groupe with the fact that i lost a good friend/ sis in law last friday. May you rest in peace, Ivy. Being absent from my reno process, i was awed to see so many changes. First, my white kitchen is finally taking shape, with the kitchen walls and floors done. However, we soon realised that there was a major mistake and miscommunication between the tilers and Alan, and our fully flushed kitchen floor did not take place. Uncle Soon had to re-order the tiles they have finished tiling and also add on stryofoams on the floor to level up the height of the kitchen floor to the same as the living room. Good job to Uncle Soon and Alan for rectifying the mistake done quickly. we also have a brand new shiny PURPLE chute up as well! (i was hoping for the PINK) My white kitchen - with the wrong tiling for flooring My purple chute Unflushed Kitchen floor, look at the drop down! We were afraid the kids will trip over the kerb and thats why we insisted on a Flush flooring. Stryofoams added to raise the height of kitchen floor Share this post Link to post Share on other sites
xvirusga76 0 Report post Posted May 28, 2009 (edited) strange, i had to break my post up into two as it simply cant upload , error message "too many fotos??" Apart from this, the wall for my mini W-I-W in my MBR is done up, tiling for both MBR and Common toilet done up complete with grout lines. Think its a nice job done, maybe because we skipped the mosaics and its easier to tile. You guys should see how TINY the MBR toilet is!!! i have to slim down more! Both toilets windows were replaced with nice WHITE nato ones, yummy! they look GOOD! New door way for the MBR is also constructed! our brand new WHITE nato windows for toilets new doorway for MBR toilet Progress looks good, aircon trunking up, thou we need the fujitsu guys to come and ractify the living room unit, otherwise, i believe tiling should be completed this week! yippee! electrical & capentry should be due soon!! Edited May 28, 2009 by xvirusga76 Share this post Link to post Share on other sites
MoreOrLess007 0 Report post Posted May 28, 2009 thanks PinkLady. i am rather worried too.. no choice, only read up abt them after an impulse buy.. going to cross my fingers and toes... hopefully ngt goes wrong when they deliver next month end... quite worried as we went back 2x to alter the size of the custom made sofa... Hi, maybe to ease your mind a little, I've bought some furniture Winter International sometime in Feb 09, and I've changed the delivery dates for about 3 times. Final confirmed delivery date was on 15/05/09, and all the furniture were delivered on time and without any errors. Hope you'll have the same experience as mine Share this post Link to post Share on other sites
xvirusga76 0 Report post Posted May 28, 2009 Hi, maybe to ease your mind a little, I've bought some furniture Winter International sometime in Feb 09, and I've changed the delivery dates for about 3 times. Final confirmed delivery date was on 15/05/09, and all the furniture were delivered on time and without any errors. Hope you'll have the same experience as mine wow! thanks wakzool!!! its really a sweet of you! care to share your buy with me i certainly hope they will be fine next month end Share this post Link to post Share on other sites
familyof4 0 Report post Posted May 28, 2009 U are back with updates! Hope you are feeling better about your loss...Was thinking how come never update leh It's good to know uncle and Alan rectify fast fast for u the progress seems really on track leh! Share this post Link to post Share on other sites
mrspiglet 2 Report post Posted May 28, 2009 My condolences for ur loss. hope everyone else affected by the loss is fine. Gd that the reno is moving smoothly. Share this post Link to post Share on other sites