Hi ppl,

l would like to know how long does contractor/Id people takes to have actual measurement upon viewing the house??? l have given them the floorplan but they insists on viewing to see if they able to do it n take actual measure on the house n watsoever n will finalise the actual price due to what we wanted. 1hr will that be enough for them? Cause l have narrow down to 5 firm-and l dont want them to bump to one another, how can that be avoided? We have from 12pm-5pm to let the contractor to view with owner permission. Will they get mad if we dont take up their offer on the spot, will they charge us for their time???

Any advice?

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Your shortlisted 5 ids/contractors, IMO that's a lot. Usually it is like not more than 3.

They do need to take sites measurements, that will give u a more accurate quotation. For experience ones, the revised quote after measurements should not differ too much. If there is a huge variance, something must be wrong, either they does it deliberately so as to be shortlisted by u or ??. Another thing, to see if there is any additional/alteration/modification required due to the structure.

Most will take 30 mins to an hour. 12 to 5 pm just nice for u to arrange one hour/contractor.

Good luck ya.

 

Share this post


Link to post
Share on other sites

the floorplan given by HDB is drawn to scale. meaning that u can measure the floorplan and find out quite accurately how the actual measurement will be. Therefore your real cost should not differ from the quoted cost too much.

e.g window grills whereby it is charged by area, is still required to be measured on site coz a little difference can mean quite alot to them.

 

Share this post


Link to post
Share on other sites

l would like to know how long does contractor/Id people takes to have actual measurement upon viewing the house???

Max 1 hour, fast and experience one 15-20min

l have given them the floorplan but they insists on viewing to see if they able to do it n take actual measure on the house n watsoever n will finalise the actual price due to what we wanted.

Make sure you are not bluffing them and you really got a house to renovate.

1hr will that be enough for them?

Enough, but the owner will be quite irritated with the number of people coming :P

Cause l have narrow down to 5 firm-and l dont want them to bump to one another, how can that be avoided?

1. Ask each of them to wait for you at different carparks or different nearby coffee shop.

2. Tell them to wait for you and go up view house together

3. When the previous ID left, just call them to come up straight away with some buffer time.

Will they get mad if we dont take up their offer on the spot,

Of course they will be mad if you reject out right.

Tell them you will call them once you confirm later on because you have 1 more ID quotation.

will they charge us for their time??

Unlikely, just buy them some drinks if you feel bad

 

Share this post


Link to post
Share on other sites

Tks ppl for the reply ... now, l know how to arrange timing

:yamseng:

l would like to know how long does contractor/Id people takes to have actual measurement upon viewing the house???

Max 1 hour, fast and experience one 15-20min

l have given them the floorplan but they insists on viewing to see if they able to do it n take actual measure on the house n watsoever n will finalise the actual price due to what we wanted.

Make sure you are not bluffing them and you really got a house to renovate.

1hr will that be enough for them?

Enough, but the owner will be quite irritated with the number of people coming :P

Cause l have narrow down to 5 firm-and l dont want them to bump to one another, how can that be avoided?

1. Ask each of them to wait for you at different carparks or different nearby coffee shop.

2. Tell them to wait for you and go up view house together

3. When the previous ID left, just call them to come up straight away with some buffer time.

Will they get mad if we dont take up their offer on the spot,

Of course they will be mad if you reject out right.

Tell them you will call them once you confirm later on because you have 1 more ID quotation.

will they charge us for their time??

Unlikely, just buy them some drinks if you feel bad

 

Share this post


Link to post
Share on other sites
Tks ppl for the reply ... now, l know how to arrange timing

:yamseng:

Hope you will post your experience and quotation here for reference :)

 

Share this post


Link to post
Share on other sites

Oh defianately ... and like chronograph said - OMG!!! its quite alot but we are in a tight budget so will see which gonna drop price slightly or throw more freebies l guess. And from there, we will narrow down to 2 quotations.

The things that made it expensive is - The Toilet PIPIng. My hubby does not like the piping to be seen in both toilets and would wanna to cover it up n in the kitchen-it usually will cover it with cabinets right but what about in the toilets??? Most of id/contractor suggested seal with concrete wall/simen n fill it with tiles but we do not want it-the reason why we think for future what if there's leaking n hdb wanna inspect-we will have to hack it off n that cost $$$ and The second was cover with wood cabinet like in the kitchen but that also-we dont want. Third cover with Acrylic or solid glass that could be open n that is expensive n are searching for a cheaper solution to that and are searching in this forum for some answers or solution. All this came to our attention at my in-law neighbour house 2mths ago as hdb suspect leaking and was told to hack off so they could do inspection n not able to claim it frm HDB and they said Hdb piping are not suppose to be seal for any reason but ppl this days are sealing it up coz of sore eyes seeing the pipe n blabla .....

l'm not sure if anyone of u out there done it b4 - covering up ur toilet piping, maybe could give us some suggestions ....

Yeah, l will post the quotation here for advise later hehe ... Wish me Good Luck for a reasonable price this weekend :dunno:

Thank You!!!

Hope you will post your experience and quotation here for reference :)
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×