jesperbg 0 Report post Posted February 19, 2009 see that your contractor punch holes in your kitchen walls before they plaster over...mine didnt and now they are going to do that as the plaster peels.... Share this post Link to post Share on other sites
Lucky Guy 0 Report post Posted February 20, 2009 (edited) see that your contractor punch holes in your kitchen walls before they plaster over...mine didnt and now they are going to do that as the plaster peels.... What! after plastering is done then punch hole? Is the peeling very serious. Manage to find from the archive. Here's some pics to share with you. =) No hole punched. Hole punched. Will leave the explanation to my wifey. Edited February 20, 2009 by Lucky Guy Share this post Link to post Share on other sites
ponytail 0 Report post Posted February 20, 2009 (edited) Hi Jesperbg, The first photo was taken after the bunga worker left. A while later, my contractor came up. Immediately, he called someone & start scolding him, first time see him so fierce, me in the hall also can hear. Around 1 hour later, the bunga worker came up again & start to punch the hole, that time I also never think so much. The 2nd photo was taken on the following day. Must give credit to my contractor , lucky never short cut, else next time peel off then big big problem. Your contractor really must Btw, have you shifted in already? Edited February 20, 2009 by ponytail Share this post Link to post Share on other sites
Pinklady 0 Report post Posted February 20, 2009 Hi Pinklady, You mean the black laminate got white patches? Not really that serious, something like whitish patch only. Share this post Link to post Share on other sites
mrspiglet 2 Report post Posted February 20, 2009 Hi Jesperbg, The first photo was taken after the bunga worker left. A while later, my contractor came up. Immediately, he called someone & start scolding him, first time see him so fierce, me in the hall also can hear. Around 1 hour later, the bunga worker came up again & start to punch the hole, that time I also never think so much. The 2nd photo was taken on the following day. Must give credit to my contractor , lucky never short cut, else next time peel off then big big problem. Your contractor really must Btw, have you shifted in already? Sorry ah.. a bit mountain turtle. Y must punch hole? Share this post Link to post Share on other sites
lubbi 0 Report post Posted February 20, 2009 Hi Lubbi & Rondy, Like lizard are? Your comment make me largi want to change colour. When yesterday I saw the 3d drawing, my heart sank. My contractor ever told us before that we can have a maximum of 3 drawings. Now I've already used up all. Hi Angel, The drawing is put up by my contractor but I shift it to the hall, scared wait the worker damage it. Hi Pinklady, You mean the black laminate got white patches? Hi mrspiglet, Thanks, will take note of that. Hi intel, I've only engage one contractor only, don't quite understand what you meant, can be more specific? Hi Ponytail, Sorry, i don't mean to be a sport spoiler but i really feel that those black design look like hundreds of lizards sticking on the top cabinet. Like the picture that rondy posted, if you were to colour those lizard in black, it feels like the same effect as your top cabinet laminate to me. Just to share, I bought a resale and they have some wall tiles which resemble a stick of 'mei hua' (like pink flower) near to the sink area. From afar, I also think they seems like lizard sticking there. Luckily, there is only like 3-4 of such tiles. So I was pretty shocked to see that top cabinet laminate on your drawing. Share this post Link to post Share on other sites
Lucky Guy 0 Report post Posted February 20, 2009 Day 4 Wall plastered Modified base Right side will be pebble wash Share this post Link to post Share on other sites
Bluetooth 0 Report post Posted February 21, 2009 What is pebble wash? Is it those we saw at playground where you can walk over barefooted to massage our feet? Share this post Link to post Share on other sites
ponytail 0 Report post Posted February 21, 2009 (edited) Sorry ah.. a bit mountain turtle. Y must punch hole? Me also Next time when meet contractor will ask him & let you know. Hi Ponytail, Sorry, i don't mean to be a sport spoiler but i really feel that those black design look like hundreds of lizards sticking on the top cabinet. Like the picture that rondy posted, if you were to colour those lizard in black, it feels like the same effect as your top cabinet laminate to me. Just to share, I bought a resale and they have some wall tiles which resemble a stick of 'mei hua' (like pink flower) near to the sink area. From afar, I also think they seems like lizard sticking there. Luckily, there is only like 3-4 of such tiles. So I was pretty shocked to see that top cabinet laminate on your drawing. Ha ha, ok ok, got so many negative feedback, will try to change to one so the 'lizard' not so obvious, thanks all for your wonderful & truthful feedback. What is pebble wash? Is it those we saw at playground where you can walk over barefooted to massage our feet? Those playground one the stone too big, mine the stone quite fine, will try to post pics to show you. Edited February 21, 2009 by ponytail Share this post Link to post Share on other sites
ponytail 0 Report post Posted February 21, 2009 Hi Pinklady, Thanks for sharing. In that case, I will use light colour for my top cabinet then. Share this post Link to post Share on other sites
Lucky Guy 0 Report post Posted February 22, 2009 For those who don't know what is pebble wash, here you are. Happen to be around when the Shifu was doing. A process more complicated than laying tiles. Step 1. After pouring in the pebble ( a mixture of pebble and cement and water ) the Shifu had to use a tool to tap & flatten the surface. Step 2. Use a painting roller to make the surface more uniform and smoother. Step 3. Use a sponge to dry the excess wet cement. Step 4. Leave to dry. Finallly you got the nice pebble wash. Another angle. Share this post Link to post Share on other sites
Nike44 0 Report post Posted February 22, 2009 Interesting. Never knew that pebble wash is done this way. Thanks for sharing. Share this post Link to post Share on other sites
jesperbg 0 Report post Posted February 22, 2009 Hi Jesperbg, The first photo was taken after the bunga worker left. A while later, my contractor came up. Immediately, he called someone & start scolding him, first time see him so fierce, me in the hall also can hear. Around 1 hour later, the bunga worker came up again & start to punch the hole, that time I also never think so much. The 2nd photo was taken on the following day. Must give credit to my contractor , lucky never short cut, else next time peel off then big big problem. Your contractor really must Btw, have you shifted in already? no we havnt shifted in yet...luckily the wall peeled jus a few days after they plastered...i tink mayb the contractor oso duno his kia nvr punched holes ba...yesterdae they jus punched n replastered again..dis time shld b no problem liao ba... Share this post Link to post Share on other sites
Lucky Guy 0 Report post Posted February 23, 2009 Hi all, this may sounds silly but its becoming a reality. Me & wifey decided that we're going to change the sewerage now & not wait till the upgrading. This pipe will be replace to pvc type. We've also decided to replace this concrete support. Meeting contractor today to finalise our latest changes. Share this post Link to post Share on other sites
Bluetooth 0 Report post Posted February 23, 2009 Half way through then want to change pipe and hack support? Your contractor must be Share this post Link to post Share on other sites