Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
aubrey

First Time Home Reno

Recommended Posts

hey there shogen,

i may be a newbie at this but i will only sign on the dotted line once they are able to give me a final quote where both myself and the contractor is happy, i have viewed some of the flats where he has done before and also to give me at least 1 3d drawing of the proposed look.

i wont want to accept anything lesser than that from an ID cos that is his job. i will not xpect so much out of a contractor given that he does not have formal education/training in ID.

i believe that if they want me to sign before 3d drawings etc etc, i wont buy that. how can i sign if you cant even give me a simple 3d drawing? doesnt even have to be 3d just a drawing will do. imagine how things will be like if you indeed did sign? i would expect him to not deliver other things as well.

reno is not some $50 purchase and to some, it is their living savings. i believe we reserve our right to at least be fussy over these things. shld your ID or contractor disagree, i think you shld drop them. :)

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

whew!! thanks a lot aubrey...u r right...looks like i got to start scouting for a new ID...as this current one is wasting my time by dragging for 3weeks!!!

hey there shogen,

i may be a newbie at this but i will only sign on the dotted line once they are able to give me a final quote where both myself and the contractor is happy, i have viewed some of the flats where he has done before and also to give me at least 1 3d drawing of the proposed look.

i wont want to accept anything lesser than that from an ID cos that is his job. i will not xpect so much out of a contractor given that he does not have formal education/training in ID.

i believe that if they want me to sign before 3d drawings etc etc, i wont buy that. how can i sign if you cant even give me a simple 3d drawing? doesnt even have to be 3d just a drawing will do. imagine how things will be like if you indeed did sign? i would expect him to not deliver other things as well.

reno is not some $50 purchase and to some, it is their living savings. i believe we reserve our right to at least be fussy over these things. shld your ID or contractor disagree, i think you shld drop them. :)

 

Share this post


Link to post
Share on other sites

aubrey I totally agree with you. Which is why I think it's important to get someone who is willing to rectify things until you're happy.

shogen I think it's important to talk to the person and have a feel of whether you think you can communicate with this person. if there is poor communication then there's really no point.

 

Share this post


Link to post
Share on other sites

well this current ID not only try to rush thru all the quotation, all the while is we who is trying to contact him instead the other way.

one time we told him to arrange one of the weekends to view his current project..there is no respond from him till saturday evening & its when my fiancee initiate to call him then onli he told us to meet up the next day morning ...

we were so pissed..as we also have plans on weekends too. & becos of him we cancelled our activitives.

aubrey I totally agree with you. Which is why I think it's important to get someone who is willing to rectify things until you're happy.

shogen I think it's important to talk to the person and have a feel of whether you think you can communicate with this person. if there is poor communication then there's really no point.

 

Share this post


Link to post
Share on other sites

Then Shogen... the solution is simple.. DUMP HIM! If you have your own ideas... why not try a contractor? PM me if you need a contact? :)

 

Share this post


Link to post
Share on other sites
Then Shogen... the solution is simple.. DUMP HIM! If you have your own ideas... why not try a contractor? PM me if you need a contact? :)

"DUMP HIM" LMAO .... like dumping a bf, you will hurt him you know.

Easier method is to just write the review for everyone to see, hurt his business only.

 

Share this post


Link to post
Share on other sites
"DUMP HIM" LMAO .... like dumping a bf, you will hurt him you know.

Easier method is to just write the review for everyone to see, hurt his business only.

haha good to hurt them once in a while.. esp the bad ones :P

Hey Rendell I just clicked on the links on your signature... very nice mosaic tiles leh! I love them... where to get those mosaic??

 

Share this post


Link to post
Share on other sites
haha good to hurt them once in a while.. esp the bad ones :P

Hey Rendell I just clicked on the links on your signature... very nice mosaic tiles leh! I love them... where to get those mosaic??

I collected all these images purely reference, you can probably get your contractor to find or produce similar designs. :D

I still have many mosaic tiles that you guys might like, I will try to put it up tonight.

Edited by rendell
 

Share this post


Link to post
Share on other sites

Hi Aubrey and Shogen,

I have been sourcing form ID and Contractor since last month, received 6 quotes range from 5k to 18k for the same kind of work to be done. Amazing right, the gap is huge. So, better review carefully the kind of material and price that different ID firm will give. I have decided my ID cause he gave me a very reasonable price for the same kind of work other ID firm would gave. For example, a set of tempered shower screen I am getting now is $330 while the other ID firm gave me a quotation of $720.

Do tell them your budget and they will give you the best quote. Because I tell them my budget is very small and I know it could somehow difficult to meet, they will still do their very best to meet it. Although it is a bit out of my original budget, but I think it worth it. If your want to know my ID contact, please PM me.

Thanks.

 

Share this post


Link to post
Share on other sites

shogen, my advice is to dump him too. why do you chase him? just makes me feel like he is not sincere in doing business with you AT ALL. that is the frustration i face from some contractors but hey, im the one with the cash and choice. so i dumped those that did not deliver.

dont let yourself accept something that you dont deserve. its just wrong. and i can just picture how things will be when he takes on your business. promise u 1 month HO but drag for maybe 2 months? tskk.

ya rendell i like those tiles and stuff! will be starting a t-blog soon. :D

 

Share this post


Link to post
Share on other sites
Hi Aubrey and Shogen,

I have been sourcing form ID and Contractor since last month, received 6 quotes range from 5k to 18k for the same kind of work to be done. Amazing right, the gap is huge. So, better review carefully the kind of material and price that different ID firm will give. I have decided my ID cause he gave me a very reasonable price for the same kind of work other ID firm would gave. For example, a set of tempered shower screen I am getting now is $330 while the other ID firm gave me a quotation of $720.

Do tell them your budget and they will give you the best quote. Because I tell them my budget is very small and I know it could somehow difficult to meet, they will still do their very best to meet it. Although it is a bit out of my original budget, but I think it worth it. If your want to know my ID contact, please PM me.

Thanks.

Hi FLY, have told all the contractors my budget is 14k thereabouts but so far all quoted 20k but its understood cos i asked them to throw in some options for considerable.

do you mind sharing your ID here or must PM only?? :)

 

Share this post


Link to post
Share on other sites
I collected all these images purely reference, you can probably get your contractor to find or produce similar designs. :D

I still have many mosaic tiles that you guys might like, I will try to put it up tonight.

YAY ok ok I love the stainless steel ones most!!! hahahaha

shogen, my advice is to dump him too. why do you chase him? just makes me feel like he is not sincere in doing business with you AT ALL. that is the frustration i face from some contractors but hey, im the one with the cash and choice. so i dumped those that did not deliver.

dont let yourself accept something that you dont deserve. its just wrong. and i can just picture how things will be when he takes on your business. promise u 1 month HO but drag for maybe 2 months? tskk.

ya rendell i like those tiles and stuff! will be starting a t-blog soon. :D

Looking forward to your Tblog

 

Share this post


Link to post
Share on other sites
Hi FLY, have told all the contractors my budget is 14k thereabouts but so far all quoted 20k but its understood cos i asked them to throw in some options for considerable.

do you mind sharing your ID here or must PM only?? :)

Sure, of course I won mind. It is Ideal Design Studio. All of their designer received good comment in this forum. PM you my ID number liao. I told them my reno is small and they won mind at all. My ID even tell me watt to do to save cost. We will finalise everything this week.

Wish you can get a good quote too. Just tell them your budget and your requirement and they will meet it.

Cheers..

 

Share this post


Link to post
Share on other sites

thanks so much! urgh must check my schedule to fit in all the viewings and stuff.. but its a pretty fun process. how much is your reno? major?

does he do the design before u finalise?

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×