Maverick_liew 0 Report post Posted January 17, 2009 (edited) Hi.. Still awaiting HDB to send me my floor plan.. But we think its not too early to 'chope' space here.. Edited January 17, 2009 by Maverick_liew Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted January 17, 2009 WELCOME!!! Looking forward to seeing your floor plan!!! Share this post Link to post Share on other sites
Angel81 1 Report post Posted January 17, 2009 Kwhehehe... Nope it's never too early! Spam chop and welcome! Share this post Link to post Share on other sites
tankee 0 Report post Posted January 17, 2009 Hi Welcome!! Share this post Link to post Share on other sites
Maverick_liew 0 Report post Posted January 17, 2009 (edited) I'm looking forward to my own floor plan!. Most importantly, we'll most probably be able to start our basic renovations & stuff by the middle of next month(Pending First Appt Date) as the owner has already moved out, and is willing to give us the keys quickly. My C.O and I have arrived at a conclusion. I will not get my black walls/black ceilings/black kitchen/black toilets. I will not get my 52" TV/ We will most probably combine one common room with the MBR. We will most probably get a WIW We might extend our toilet into the bigger MBR space We will most probably re-do both toilets(Hotel Style) We will most probably have very little furniture. (Due to our doggies) We will most probably be having roller blinds for all windows(Black) We will be having 'mirror film tinting' on ALL our windows The rest, depends on my 'negotiation' skills.. both with my contractor and my C.O Edited January 17, 2009 by Maverick_liew Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted January 17, 2009 I'm looking forward to my own floor plan!. Most importantly, we'll most probably be able to start our basic renovations & stuff by the middle of next month(Pending First Appt Date) as the owner has already moved out, and is willing to give us the keys quickly. My C.O and I have arrived at a conclusion. I will not get my black walls/black ceilings/black kitchen/black toilets. I will not get my 52" TV/ We will most probably combine one common room with the MBR. We will most probably get a WIW We might extend our toilet into the bigger MBR space We will most probably re-do both toilets(Hotel Style) We will most probably have very little furniture. (Due to our doggies) We will most probably be having roller blinds for all windows(Black) We will be having 'mirror film tinting' on ALL our windows The rest, depends on my 'negotiation' skills.. both with my contractor and my C.O Wahh so will sign indemnity form all that? Got a contractor already?? cool! You seem to want a lot of BLACK stuff.. well at least the blinds are black... Share this post Link to post Share on other sites
Maverick_liew 0 Report post Posted January 17, 2009 Wahh so will sign indemnity form all that? Got a contractor already?? cool! You seem to want a lot of BLACK stuff.. well at least the blinds are black... Contractor.. Most probably using my uncle.. He did up our previous place.. I wanted the whole house black and purple ONLY. Indemnity forms not done yet. But I'll get it done within next week. My contractor coming down for a first lookseelooksee next Tuesday night. Hopefully things are within my budget. Taking reno loan.. but I want everything to be done within my max 20K budget.. As.. we're not really doing much.. Share this post Link to post Share on other sites
Starscream 0 Report post Posted January 17, 2009 Yeah yeah.. enjoy the process Share this post Link to post Share on other sites
Maverick_liew 0 Report post Posted January 17, 2009 Yeah yeah.. enjoy the process From what I've been reading.. It seems like it might not be a enjoyable process.. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted January 17, 2009 wah ok ok that's GOOD! Since you've worked with him before and everything went ok I'm sure things will go smoothly! And get "own people price"!! mm how big is your place? not doing much 20k.. should be ok ba Share this post Link to post Share on other sites
Maverick_liew 0 Report post Posted January 17, 2009 wah ok ok that's GOOD! Since you've worked with him before and everything went ok I'm sure things will go smoothly! And get "own people price"!! mm how big is your place? not doing much 20k.. should be ok ba Hopefully the 'own people price' is really a good price.. Planning to ask for free main gate/locksets.. Any other things I can squeeze him for.. ? I want my black on black on black theme.. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted January 17, 2009 squeeze?? haha my parents squeezed my contractor for... covering up the tiny windows in the MBR and bedroom 1 levelling the panel used to cover air con box tiling their window ledge installing all the bathroom accessories (bowl and sink need to pay) store room door main door locksets assembling my other furniture (from ikea) plastering the balcony area mirrors in both bathrooms italian tiles on the foyer which cost $10.50/psf boxing up the pipes in the balcony cleaning all the windows and polishing the frames (we used the previous ones) servicing the two air con units Hollow block above the toilet door mmm and a load of other stuff la. hard to rem. Share this post Link to post Share on other sites
ilmare612 0 Report post Posted January 17, 2009 Hi fellow Segar neighbour. Welcome to the neighbourhood. We are also planning to move in after CNY. Our place is 90% done for reno. All the best and enjoy the process Share this post Link to post Share on other sites
Maverick_liew 0 Report post Posted January 17, 2009 squeeze?? haha my parents squeezed my contractor for... covering up the tiny windows in the MBR and bedroom 1 levelling the panel used to cover air con box tiling their window ledge installing all the bathroom accessories (bowl and sink need to pay) store room door main door locksets assembling my other furniture (from ikea) plastering the balcony area mirrors in both bathrooms italian tiles on the foyer which cost $10.50/psf boxing up the pipes in the balcony cleaning all the windows and polishing the frames (we used the previous ones) servicing the two air con units Hollow block above the toilet door mmm and a load of other stuff la. hard to rem. Yes.. Thats alot.. but.. how much was ur overall reno costs? Cant be around 20K too? If not.. that's ALOT OF things that were given FOC wor.. Later today.. we're going SSC to take a looksee. but definitely not buying from there. Just use their prices as an estimate. Then we'll know.. that's the MAX it would costs.. Hi fellow Segar neighbour. Welcome to the neighbourhood. We are also planning to move in after CNY. Our place is 90% done for reno. All the best and enjoy the process Which block are you? Share this post Link to post Share on other sites
ilmare612 0 Report post Posted January 17, 2009 482...nearby right? Share this post Link to post Share on other sites