hamdy 0 Report post Posted December 22, 2008 Mine is a 5 room HDB - 122 sq m Really appreciate all help to see if this quotation is ok. because i have a fren who did a 3rm, hacking plus cabinets, tilings etc only at 15k. 1 To re-polish existing marble flooring @ living room & 3 bedroom.(998 Sqft) $1,297.00 2 To re-polish existing parquet platform @ master bedroom. $300.00 3 To-remove pop up ceiling @ kitchen. $ 180.00 4 To plaster smooth kitchen ceiling. $ 450.00 5 To paints whole unit wall & ceiling using ICI All-in 1 paints including door, door frame, pipe. $1,350.00 6 To paints kitchen ceiling with sealer finish for plastering work. $150.00 7 Remove & Installation of 2 sets toilet bowl for labour charges only. $ 200.00 8 Remove & Installation of 2 sets toilet basin & tap for labour charges only. $ 160.00 9 Supply & construct shower kerb @ common toilet $ 150.00 10 To remove existing tempered glass swing door & fixed panel @ kitchen entrance. $ 150.00 11 To make good deffect area after dismantle glass door. $ 180.00 12 Supply & install 1 fixed & 1 sliding 10mm tempered glass door @ kitchen entrance.(60 Sqft) $ 1,440.00 13 Chemical wash for whole house. (Twice) $ 250.00 Total Amount Quoted: $ 6,257.00 Share this post Link to post Share on other sites
johnnyong 0 Report post Posted December 22, 2008 8 Remove & Installation of 2 sets toilet basin & tap for labour charges only. $ 160.00 - maybe $100 9 Supply & construct shower kerb @ common toilet $ 150.00 - maybe $80 13 Chemical wash for whole house. (Twice) $ 250.00 - Ask for FOC lah Share this post Link to post Share on other sites
alan26 2 Report post Posted December 22, 2008 You've got new mail Share this post Link to post Share on other sites
hamdy 0 Report post Posted December 22, 2008 wow chemical wash can FOC..maybe he added that one, to make it more then 6k.. haha Share this post Link to post Share on other sites
tommy78 0 Report post Posted December 24, 2008 wow chemical wash can FOC..maybe he added that one, to make it more then 6k.. haha ur price is slightly higher.... most probably becos you only doing very few items.. Labour wont be cheap esp you doing few items only... Share this post Link to post Share on other sites
alan26 2 Report post Posted December 24, 2008 Mine is a 5 room HDB - 122 sq m Really appreciate all help to see if this quotation is ok. because i have a fren who did a 3rm, hacking plus cabinets, tilings etc only at 15k. 1 To re-polish existing marble flooring @ living room & 3 bedroom.(998 Sqft) $1,297.00 2 To re-polish existing parquet platform @ master bedroom. $300.00 3 To-remove pop up ceiling @ kitchen. $ 180.00 4 To plaster smooth kitchen ceiling. $ 450.00 5 To paints whole unit wall & ceiling using ICI All-in 1 paints including door, door frame, pipe. $1,350.00 How many color to choose from? 6 To paints kitchen ceiling with sealer finish for plastering work. $150.00 Toilet is also wet area, depend on the current condition whether sealant is needed 7 Remove & Installation of 2 sets toilet bowl for labour charges only. $ 200.00 8 Remove & Installation of 2 sets toilet basin & tap for labour charges only. $ 160.00 9 Supply & construct shower kerb @ common toilet $ 150.00 for your kerb is with tiles or without tiles, if u wanna do tiling for that kerb it would incur other cost 10 To remove existing tempered glass swing door & fixed panel @ kitchen entrance. $ 150.00 11 To make good defect area after dismantle glass door. $ 180.00 12 Supply & install 1 fixed & 1 sliding 10mm tempered glass door @ kitchen entrance.(60 Sqft) $ 1,440.00 13 Chemical wash for whole house. (Twice) $ 250.00 Any Debris Fee Haulage fee if any any Permit fee Total Amount Quoted: $ 6,257.00 Still not very transparent leh. Share this post Link to post Share on other sites
hamdy 0 Report post Posted December 24, 2008 Still not very transparent leh. So do you think i should just ask a few more contractors for quotations with just listing this items? because I haven't gotten my keys..so it's pretty inconvenient to ask contractors to go up as n when to see my flat Share this post Link to post Share on other sites
alan26 2 Report post Posted December 25, 2008 So do you think i should just ask a few more contractors for quotations with just listing this items? because I haven't gotten my keys..so it's pretty inconvenient to ask contractors to go up as n when to see my flat As long as you got your Floor Plan with you, you could ask for quotation from contractor or ID. Share this post Link to post Share on other sites