bubbli 0 Report post Posted April 16, 2009 (edited) Tile Selected: Common Toilet Wall Tiles Common Toilet Floor Tiles Living Room Tiles Edited April 16, 2009 by bubbli Share this post Link to post Share on other sites
bubbli 0 Report post Posted April 16, 2009 (edited) Dining & Kitchen Floor Tiles Master Room Toilet Wall Tiles Master Room Toilet Part Wall & Flooring Tiles Edited April 16, 2009 by bubbli Share this post Link to post Share on other sites
bubbli 0 Report post Posted April 16, 2009 (edited) Hacking of floor tiles had been completed so far...The wall between the living and the kitchen had been hacked too..For both bedrooms we have decided to overlay laminate flooring (save $$$)..At the moment the flooring tiles is still being laid and yet to complete.. This pic is taken on 3rd day of reno: Will upload others soon...Life has been ver busy so far...with the current reno and Sis wedding is up next mth too at the same time when reno complete...Wat a rush... Edited April 16, 2009 by bubbli Share this post Link to post Share on other sites
ashes02 0 Report post Posted April 16, 2009 looks like it's a major overhaul! Congrats! Share this post Link to post Share on other sites
bubbli 0 Report post Posted April 16, 2009 looks like it's a major overhaul! Congrats! Thank you...yes whole house is overhaul...we r just hoping everything will be smooth flowing without any hiccups...our ID has been a great help...so everything is k...so now waiting for the reno to complete... Share this post Link to post Share on other sites
bubbli 0 Report post Posted April 21, 2009 Toilet Overhaul & Tiling has been completed as at 19.4.09...very hepi with the outcome...the only thing is both toilets doesn't have the same style of tiling work...but we still love it... Toilet Overhaul Master Room Toilet (Completed) Common Toilet (Completed) New Window Louvre for both toilets Share this post Link to post Share on other sites
bubbli 0 Report post Posted April 21, 2009 (edited) Kitchen overhaul is also completed...all tiling is done...we have opted out to do the wall tiling cos the $$...kitchen, washing base is also done..except for the fridge base...which will be done later...Windows for the kitchen will be change to the sliding one..We also got the new chute... Kitchen overhaul (Complete) Cabinet Base in Kitchen New windows for the master room As for now...all tiling work has been completed...plastering should be done by these 2 days...will be going down to our new abode soon...to see the work done so far...now waiting anxiously for the whole process to complete...New home here we come... Edited April 21, 2009 by bubbli Share this post Link to post Share on other sites
hibernate 0 Report post Posted April 21, 2009 yay more pics to look forward to! Share this post Link to post Share on other sites
bubbli 0 Report post Posted April 28, 2009 Reno update as at 27.04.09: All tiling works is completed except for the laminate flooring in the rooms....Pipings all done up as well..Met up with ID to mark the power point for the electrical works...Also bought all lights for the whole house...Ceiling fan & the instant heater...$$$...Now waiting for the painting to commence this week...The progress of work is smooth flowing and on schedule... Plastering work completion for Living, Dining & Kitchen Area Plastering work completion for Common Room Plastering work completion for Master Room Tiling Work for Steps - Completed Share this post Link to post Share on other sites
bubbli 0 Report post Posted May 6, 2009 Up to date...painting is 100% completed except for the access area...Love the colours...pastel colours...Lights & Fan r up too..except for the L-box lites and the access area lite...Electrical Switches all done up as well... Access area tiles r also done up...Like the design...(Initially wanted the pebble wash more...but decided against it as it will wear off with frequent wash..)..But still the end result is good.. Internal Doors are changed...Didn't take any pic until the touch up work r done.. On Sunday..went to Poh Joo to buy the toilet bowls...washing basins...sink..toiletries stuff (mirrors....the towel racks...n etc..etc..) Spent $$$ but still within our budget... Overall we are satisfied with the work...so now waiting for more finishes to be up... Living, Dining & Kitchen Common Room Master Room Master Room Toilet Common Room Toilet Share this post Link to post Share on other sites
bubbli 0 Report post Posted May 6, 2009 Access Area Tiling Ceiling Fan Switches Share this post Link to post Share on other sites
fastads 0 Report post Posted May 6, 2009 Knocking down the kitchen wall makes the whole place so spacious. Share this post Link to post Share on other sites
bubbli 0 Report post Posted May 6, 2009 Knocking down the kitchen wall makes the whole place so spacious. Yup it did...we had made the rite decision when hacking the wall...now waiting for the whole place to be done up soon... Share this post Link to post Share on other sites