pinkpetter 0 Report post Posted December 16, 2008 Yeah.. initially wanted to do solid surface top, but want to save money so we keep the tiled top.. My hubby likes to collect starwars lego.. so those visible areas will be for him.. ya.. it looks ok what. save save. Wah starwars lego!!! I used to oogle at them in the shop at PS... hahaha but I dun collect. Like to see only. Look forward to seeing his collection up!! Share this post Link to post Share on other sites
Qoo4life 0 Report post Posted December 17, 2008 ya.. it looks ok what. save save. Wah starwars lego!!! I used to oogle at them in the shop at PS... hahaha but I dun collect. Like to see only. Look forward to seeing his collection up!! Haha.. now he only got the small small items.. think with this display cabinet, his collection will grow.. Share this post Link to post Share on other sites
Qoo4life 0 Report post Posted December 17, 2008 New updates!! The ceiling fan is installed on Monday. Initially, we have ordered a black colour ceiling fan but change our mind last week to the silver one.. Closer look of the ceiling fan The wrought iron gate is back from spray paint and change of new lock New lock for the main door On the same day, we have also requested the locksmith to change the lock for the letter box.. My hubby has also sms to the agent to inform him that we are changing lock and get him to inform the ex-owner to redirect their mails.. but till date.. no response from the agent.. Share this post Link to post Share on other sites
Qoo4life 0 Report post Posted December 17, 2008 (edited) The kitchen hob is installed yesterday Closer look of kitchen hob Master bathroom new vanity cabinet and glass basin installed Rain shower @ master bathroom, the side is the towel shelf which can be folded if not in used I find that the rain shower is too high, but ID and hubby say it is ok.. Common toilet Wc, basin, mirror and shower set installed with missing tap due to short of 1 rubber insert.. Does anyone of you tried not to pay the ID the final payment? She came over yesterday and told us that the drawers will only be coming in during Jan and the date is not confirmed yet.. We do not want to pay the final 10% of the renovation fees since the drawers are not installed and as well as another 4 storage drawers at the kitchen cabinet.. Edited December 17, 2008 by Qoo4life Share this post Link to post Share on other sites
mmycheng 0 Report post Posted December 17, 2008 The kitchen hob is installed yesterday Closer look of kitchen hob Master bathroom new vanity cabinet and glass basin installed Rain shower @ master bathroom, the side is the towel shelf which can be folded if not in used I find that the rain shower is too high, but ID and hubby say it is ok.. Common toilet Wc, basin, mirror and shower set installed with missing tap due to short of 1 rubber insert.. Does anyone of you tried not to pay the ID the final payment? She came over yesterday and told us that the drawers will only be coming in during Jan and the date is not confirmed yet.. We do not want to pay the final 10% of the renovation fees since the drawers are not installed and as well as another 4 storage drawers at the kitchen cabinet.. Hi, I personally think you should not pay your ID in full until you are satisfied with everything. I did not pay my ID the last payment until after all the reno works are done and the major rectifications sorted (and that was after I have moved in for 1 1/2 weeks). You can discuss this with him/her and work out a compromise of sorts. Share this post Link to post Share on other sites
asianms 0 Report post Posted December 17, 2008 sori, back track a litle... how did you change door lock? Do you go buy a lockset then ask locksmith to change? Do locks come in sizes? Share this post Link to post Share on other sites
Ami 0 Report post Posted December 17, 2008 I think our rainshower the same leh! Your MBR one. Share this post Link to post Share on other sites
Qoo4life 0 Report post Posted December 18, 2008 sori, back track a litle... how did you change door lock? Do you go buy a lockset then ask locksmith to change? Do locks come in sizes? The locksmith change for us which is arranged by the ID. I was not there so I didnt witnessed the change.. But for the letterbox, my hubby told me got a lot of different types of lock and hardware shop is selling too.. I think our rainshower the same leh! Your MBR one. Is it.. hahaha... we bought it from Genova @ Bendemeer road.. Share this post Link to post Share on other sites
Qoo4life 0 Report post Posted December 18, 2008 Here is the photo of the kitchen tap. We have done price comparison from 3 shops (Genova, Heritage & neighbourhood shop in bedok) and all shown us with the same kitchen tap.. and we got ours from Heritage and is lower than $150 The handover date is yesterday and we have not even see the ID yet as the cleaning is not done properly and the ID managed to get her contractor to reclean the house again today. Feedback from my hubby is that now the cleaning is more presentable.. Tomorrow we will be getting our sofa, bedframe and dining table.. However, Lorenzo told us that the dining chairs are out of stock and the next shipment will reach in Jan'2009 only So they will be giving us temp chairs.. Wondering if this is always the norm for furniture shop as my friend also told me that his L shaped sofa only managed to have half of it delivered and the other half took 2 - 3 months to reach him. His dining table is only delivered with 2 chairs when he ordered 4 and the deliveryman claimed that he know nothing.. Aiyo.. Hopefully nothing goes wrong tomorrow.. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted December 18, 2008 Here is the photo of the kitchen tap. We have done price comparison from 3 shops (Genova, Heritage & neighbourhood shop in bedok) and all shown us with the same kitchen tap.. and we got ours from Heritage and is lower than $150 The handover date is yesterday and we have not even see the ID yet as the cleaning is not done properly and the ID managed to get her contractor to reclean the house again today. Feedback from my hubby is that now the cleaning is more presentable.. Tomorrow we will be getting our sofa, bedframe and dining table.. However, Lorenzo told us that the dining chairs are out of stock and the next shipment will reach in Jan'2009 only So they will be giving us temp chairs.. Wondering if this is always the norm for furniture shop as my friend also told me that his L shaped sofa only managed to have half of it delivered and the other half took 2 - 3 months to reach him. His dining table is only delivered with 2 chairs when he ordered 4 and the deliveryman claimed that he know nothing.. Aiyo.. Hopefully nothing goes wrong tomorrow.. MmM I guess sometimes they run low on stock and it happens. but I do hope all goes well for you tomorrow. So you holding back the last payment? Share this post Link to post Share on other sites
Qoo4life 0 Report post Posted December 18, 2008 MmM I guess sometimes they run low on stock and it happens. but I do hope all goes well for you tomorrow. So you holding back the last payment? Ya, holding the last payment.. all the blum system in the kitchen cabinet is not installed.. initially the carpenters are supposed to install the anti-slam hinges to all the kitchen cabinet doors yesterday but the carpenters told us that the ID ordered the wrong one and cannot be installed.. So now still short of 3 drawers, 4 pull out tray (2 big & 2 small) & the anti-slam hinges.. Don't even know whether can make it for Chinese New Year cos the ID still do not have a firmed ship date from Blum. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted December 19, 2008 Ya, holding the last payment.. all the blum system in the kitchen cabinet is not installed.. initially the carpenters are supposed to install the anti-slam hinges to all the kitchen cabinet doors yesterday but the carpenters told us that the ID ordered the wrong one and cannot be installed.. So now still short of 3 drawers, 4 pull out tray (2 big & 2 small) & the anti-slam hinges.. Don't even know whether can make it for Chinese New Year cos the ID still do not have a firmed ship date from Blum. Yup Good call to hold payment. I guess when you hold the last payment the ID will really try his best to hurry everything along. So it's the only way for you to hurry things along. Hope you get your things before CNY! Share this post Link to post Share on other sites