Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
farmer

My Home

Recommended Posts

Hey, hey.. I like that!!!

Farmer, hope to see pics soon k? who did you choose for your ID? Any feedbacks?

pics on the way definitely. i did not choose any ID but i get a main con. i think he is ok. main concern is feedback from you guys haha :dancingqueen:

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

1. To supply labour and material to hack & dismantle $2,200.00

- 2 nos of toilet wall tiles, floor tiles & sanitary ware

- Kitchen wall & floor tiles & existing Kitchen cabinet

- existing wardrobe & partition wall

- 7 nos of wall at Kitchen, store, common toilet, Living, Bedroom 2 & Master Bedroom

- include haulage fee & permit fees

2. To supply labour and material to overlay kronotex - (mammut @$8.80/sqft) laminate $9,680.00

flooring (1100sqft) for whole house

3. To supply labour and material to lay selected tiles & pebbles stone at Foyer area $600.00

3. To supply labour and material to lay selected tiles @$3/sqft for $1,400.00

Common toilet wall tiles

4. To supply labour and material to lay selected tiles @$3/sqft for $700.00

Common toilet floor tiles

- include water proofing

5. To supply labour and material to lay selected tiles @$3.50/sqft for $1,600.00

Master toilet wall tiles

6. To supply labour and material to lay selected tiles @$3/sqft for $750.00

Master toilet floor tiles

- include water proofing

7. To supply labour and material to lay selected tiles @$3sqft for $2,200.00

Kitchen wall tiles (370sqft)

8. To supply labour and material to lay selected tiles @$4.50/sqft for $1,270.00

Kitchen floor tiles (150sqft)

- (include water proofing)

7. To supply labour and material to lay selected tiles @$3/sqft for $980.00

Service balcony wall tiles (160sqft)

9. To supply labour and material to lay selected tiles @$4.50/sqft for $550.00

Service balcony floor tiles (55sqft)

- include water proofing

10. To supply labour and material to construct hollow block wall c/w plaster $800.00

smooth (make good) to make up a store room **** area

11. To supply labour and material to construct low height hollow block wall $350.00

c/w plaster smooth (make good) at Kitchen entrance area

12. To supply labour and material to construct hollow block wall $250.00

to seal up existing common toilet door entrance

13. To supply labour and material to construct hollow block wall $600.00

c/w plaster smooth (make good) at Bedroom 2

14. To supply labour and material to construct hollow block wall $500.00

c/w plaster smooth (make good) between Master Bedroom & Bedroom 3

15. To supply labour and material to fabricate designed full height shoe $1,350.00

cabinet (4.5ft) in veneer finishing at Foyer area c/w 3 nos of black spray glass

17. To supply labour and material to fabricate designed plasma feature wall $1,200.00

(9ft) in veneer finishing **** area

18. To supply labour and material to fabricate designed open cabinet (3ft) $750.00

in veneer/laminate finishing c/w 1 no of designed door in effect wall finishing

19. To supply labour and material to fabricate designed full height storage cabinet $620.00

(2.5ft) in veneer finishing **** area

20. To supply labour and material to do selected effect wall (130sqft) **** $1,000.00

area

21. To supply labour and material to install designed alumix wardrobe c/w drawers $1,700.00

at Master Bedroom

28. To supply labour and material to fabricate 1 no of tall unit (2ft) in laminate $550.00

finishing at Kitchen

29. To supply labour and material to fabricate designed top & bottom Kitchen $3,180.00

cabinet (26.5ft) c/w 4 side aluminium trimming in laminate finishing at Kitchen

- include 1 no of cutlery tray, I no of stainless steel disk rack & aluminium handler

30. To supply labour and material to install selected solid surface (16ft) for $1,280.00

Kitchen worktop

31. To supply blum system & non-slam mechanisim for Kitchen cabinet & other $2,500.00

carpentry items

31. To supply labour and material to construct fridge base c/w tiles finishing $100.00

32. To supply labour and material to construct washing machine base c/w $100.00

tiles finishing

33. To supply labour and material to construct Kitchen cabinet base c/w $250.00

tiles finishing on the side

34. To supply labour and material to construct 2 nos of shower kerb for $250.00

common & Master Bedroom

36. To supply labour and material to install 4 nos of designer's door for all $1,200.00

Bedrooms

37. To supply labour and material to install 1 no of aluminium bi-fold cum $320.00

sliding door at Common toilet

38. To supply labour and material to install 1 no of aluminium bi-fold cum $380.00

sliding door at Master Bedroom toilet (different frame c/w frosted glass)

39. To supply labour and material to install 10mm tempered glass fixed panel $550.00

at Kitchen entrance area

40. To supply labour and material to install 10mm tempered clear glass swing $700.00

at Kitchen entrance

43. To supply labour and material to do plastering smooth for whole house $2,200.00

ceiling & wall

45. To supply labour and material to install 1 no of selected wrought-iron $580.00

gate at main entrance

46. To supply labour and material to construct flat false ceiling, L-box, designed $1,200.00

cove light & curtain pelmet for Living & Dining area

47. To supply labour and material to construct designed false ceiling (130sqft) $600.00

for Kitchen area

47. To supply labour and material to install 1 no of aluminium louver window for $220.00

common toilet area

48. To supply labour and material to paint whole house using ICI/Nippon $1,800.00

emulsion paint (apply sealant for whole house wall & ceiling due to plastering)

49. To supply labour and material to run stainless steel piping for whole $1,450.00

house - (include installation of sanitary ware) (hot & cold piping)

50. To supply labour and material to do general/acid wash for whole house

51. To supply labour and material to lay floor covering protection for whole house

total: 50k

this is the final version. my contractor give. any advise on the price???? :dancingqueen:

Edited by farmer
 

Share this post


Link to post
Share on other sites

yo yo yo...which part of bukit panjang are u located at? Me also new kid on the block...Segar Road. You? Now doing renovation. Should be completed by year end :) You bought resale?

 

Share this post


Link to post
Share on other sites

can't sleep. so paste the before photos to let you guys see. cheers

this is the wall on the right of the main door. so many lines on the wall. :jawdrop:

IMG_0025.jpg

another view. the previous owner partition another room in the living room.

IMG_0026.jpg

another view to mbr(left)bdrm 1(bottom right)partition room(right)

IMG_0027.jpg

the kitchen

IMG_0028.jpg

this wall will go

IMG_0038.jpg

right side

IMG_0030.jpg

left side

IMG_0031.jpg

the entrance to bdrm2(right side) kitchen entrance(centre) Storeroom(left)

IMG_0032.jpg

mbr view

IMG_0033.jpg

IMG_0034.jpg

bdrm 1

IMG_0035.jpg

IMG_0036.jpg

living room

IMG_0037.jpg

yo yo yo...which part of bukit panjang are u located at? Me also new kid on the block...Segar Road. You? Now doing renovation. Should be completed by year end :) You bought resale?

yup resale i at jelapang side. nice to meet you

yo yo yo...which part of bukit panjang are u located at? Me also new kid on the block...Segar Road. You? Now doing renovation. Should be completed by year end :) You bought resale?

yup resale i at jelapang side. nice to meet you..

it should be bdrm3 instead of bdrm1. 8|

 

Share this post


Link to post
Share on other sites
Wah say your kitchen is very wide. the cabinets line both side you still can have many people standing inbetween...

KITCHEN ISLAND!!! heh heh :P

haha i would also want an island but sigh........ but i get the entire kitchen in blum though. :notti:

spam chop :dancingqueen:

your mbr toilet is quite big :good:

it's a corner unit? coz the br1 window cannot see corridor :wub: :wub:

yup apple its corner. only a 4 rm and me(5i) in that stretch of corrider. i find it nice and quiet

 

Share this post


Link to post
Share on other sites

hacking done. clearing debris done.

kitchen . left the service balcony wall and toilet done will seal up and move to the other side. :notti:

IMG_0073.jpg

bedroom 2 4panel windows and down of the wall

IMG_0076.jpg

living rm with oversee into bdrm3. i hack the wall because i have something special on later you will know :dancingqueen:

IMG_0078.jpg

mbr. nothing much done after i hack down the wall between bdrm3

IMG_0075.jpg

maindoor front. i hack away. wanted to place some tiles in front of the shoe cabinet at a later stage

IMG_0079.jpg

 

Share this post


Link to post
Share on other sites
haha i would also want an island but sigh........ but i get the entire kitchen in blum though. :notti:

yup apple its corner. only a 4 rm and me(5i) in that stretch of corrider. i find it nice and quiet

Same as me... want one but wun have one. heh heh nvm. NEXT HOUSE! ;)

Looking forward to your progress!!

 

Share this post


Link to post
Share on other sites
Spam chop! :P

Wah... all kitchen cupboards with blum? *envy* Very x leh.. I now tinking if should have soft closing for mine. :deal:

you should have the soft closing.. is it for the door?. door pricing is quite ok

 

Share this post


Link to post
Share on other sites
you should have the soft closing.. is it for the door?. door pricing is quite ok

Kitchen doors and drawers loh. Hehehe.. okok, tink it's good too. Wun kiap fingers :P.

 

Share this post


Link to post
Share on other sites
Happy Reno! :)

thanks starscream. went to look at your blog. it's the hiccups in reno. at the end of the day, you will still get a home you will love. cheers

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×