mwerkz 0 Report post Posted November 16, 2008 keke... I am watching your blog too.. waiting for your end results as well.. :-) Carpentry and wallpaper end of this month... Beds, fish tanks, fridge, Washing Machine etc on 1st week of Dec... Cleaning and moving on 2nd week guess can only move in on 3rd week of Dec.. 4th week of Dec... wedding.. keke. my still very in progress. wun be finishin so soon Share this post Link to post Share on other sites
Deepwhite 0 Report post Posted November 17, 2008 Progress of the carpentry works... Completed shoe cabinet Completed alter table Kitchen Cabinet plus partial Island table w/o solid surface Close up of kitchen top cabinet.. TV console done... not very good design but can still live with it. Share this post Link to post Share on other sites
va|er1e 0 Report post Posted November 19, 2008 Wow i only read your reply now... i hope they will have another 20% discount when i go there, haha Your alter table is very nicely done... i like it that it is so blend in with the other parts... Is your slanted TV area covering part of the window? Care to share which fengshui master u engage and how much? Share this post Link to post Share on other sites
Deepwhite 0 Report post Posted November 20, 2008 Solid surfacing is done on Wednesday and we are very excited that it is completed... currently cover up by paper except MBR toilet.. Snapshot of Master Toilet Solid Surfacing Snapshot of the Boat Sink and Tap Kitchen Sink is installed today... left most is filter water, middle is soap dispenser and center is Sink Tap Piece of Art done by the plumber Water Filter brand.. quiet good in service and teach me how to do maintenance too... Common Toilet WC finally installed... delay due to the opening size cannot be fixed and we need to change another WC brand Common Toilet Snapshot near entrance Common Toilet Snapshot near WC Heater at Common Toilet Crystal light hang at Island Table Broader snapshot of crystal light w/ island table and common toilet Share this post Link to post Share on other sites
Deepwhite 0 Report post Posted November 20, 2008 Wow i only read your reply now... i hope they will have another 20% discount when i go there, haha Your alter table is very nicely done... i like it that it is so blend in with the other parts... Is your slanted TV area covering part of the window? Care to share which fengshui master u engage and how much? The shoe cabinet and alter table is using the same colour scheme because the focus point is the black floor tile at entrance which cannot be capture nicely in photo. Yes.. The TV is slanted as advice by the Feng shui master and it does cover part of the window hence we need to shorten the curtain length. Master Chen Yin Chieh at Toa Payoh 63526577 charge $688 for a Executive Apartment. Share this post Link to post Share on other sites
Deepwhite 0 Report post Posted November 21, 2008 (edited) We had change the design of the TV console as feel quiet uncomfortable on the colouring scheme... Before.. After... (taken out the top cabinet and ledge) Edited November 24, 2008 by Deepwhite Share this post Link to post Share on other sites
Deepwhite 0 Report post Posted November 21, 2008 Finally, the gate is here... this vendor seems to attend any home decor fair.. Ho Ho engineering.. Before gate... After gate.. Share this post Link to post Share on other sites
77suns 0 Report post Posted November 22, 2008 Nice to know your contractor are so understanding to re-touch on the living area. Like the way you put a darker strip of tile on the shower head area, neat. Share this post Link to post Share on other sites
Deepwhite 0 Report post Posted November 23, 2008 Nice to know your contractor are so understanding to re-touch on the living area. Like the way you put a darker strip of tile on the shower head area, neat. The contractor relaminate the whole console so some cost damage is done... Share this post Link to post Share on other sites
Deepwhite 0 Report post Posted November 23, 2008 Clearing of debris and pending for closet, fish tanks, wallpaper, furnture and curtain to come in within last 2 weeks... Before entrance area.. After entrance area.. Before TV Console After TV Console Before kitchen and island table area After kitchen and island table area Share this post Link to post Share on other sites
Angel81 1 Report post Posted November 24, 2008 Wah.. Ur place coming along very nicely. Think ur tv console is very nice after rectification. Share this post Link to post Share on other sites
simpleguy80 0 Report post Posted November 24, 2008 Some of the sanitary wares that we purchase here.. Feng Shui Master mentioned no black and no red in kitchen but we like tempered glass hob. Finally found a white version below Master toilet sink tap on the left and kitchen sink tap on the right are selected Finding the master toilet sink takes us some weeks, finally settle for a unique shape.. does it look like a WC? How much u bought ur master toilet sink tap? Share this post Link to post Share on other sites
Deepwhite 0 Report post Posted November 24, 2008 Wah.. Ur place coming along very nicely. Think ur tv console is very nice after rectification. Thanks... at first quiet reluctant to change the design due to additional cost incurred but now seems worth it. Share this post Link to post Share on other sites
Cloudy 0 Report post Posted November 24, 2008 How much u bought ur master toilet sink tap? that tap might be from Royal Fanco? I oso got that one but I am using it for my Kitchen Sink and not MBR Toilet. Seems like RF is showing everyone the same items Means we going to have the same fittings I got mine for $85. Share this post Link to post Share on other sites
Angel81 1 Report post Posted November 24, 2008 Thanks... at first quiet reluctant to change the design due to additional cost incurred but now seems worth it. Hehehe.. Very worth it. Must be happy with ur renos, cuz will be looking at it for quite some time. Share this post Link to post Share on other sites