ylucy 0 Report post Posted November 6, 2008 Have been renoing for amost 3 full weeks, but progress seems little... Mine is 4A HDB, 90sqm. Reno starts on 20th Oct. First week: remove laminated flooring and hacking toilet & kitchen (wall & floor) 2nd week until now (almost 3 week): - Kitchen wall tiles finished. - Common toilet wall tiles 95% finished - Master toilet wall tile 80% finished. - Store room flooring layed. And that's all... Is it consider as normal? Share this post Link to post Share on other sites
de_Pierre 0 Report post Posted November 7, 2008 Is there work done everyday? U should consult ur contractor why izzit so slow... Got manpower issue? But B4 any conclusion, u should visit ur flat every night to see any work done on tad specific day... Then u'll know if its slow anot... ^^ If he knows u r particular abt work done everyday, i think he'll "on the ball"... Tis tips is useful for all layman who's renovating their hse... Share this post Link to post Share on other sites
ylucy 0 Report post Posted November 7, 2008 This is good idea. Everyday i went down... some little work is done... But i feel for 3 ppl to do so little work in a day is a bit slow... But I don't dare to push too much... later they hurry in work without paying much attention to quality... Share this post Link to post Share on other sites
hihihi 0 Report post Posted November 7, 2008 normal progress takes abt 4-6weeks. I prefer tiling to be done carefully and slowly. If you're not in a hurry, and things are moving, then don't have to worry too much. Share this post Link to post Share on other sites