sianz 0 Report post Posted October 26, 2008 Hmmm.. Finally starting a reno blog already.. ^.^ Hope our first house would turn out fine.. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted October 26, 2008 good luck for your reno!!! Any floorplan? Share this post Link to post Share on other sites
sianz 0 Report post Posted October 26, 2008 Hehehe.. Wow.. Nice to see you PinkPetter.. You are fast.. Anyway, The floor plan is up.. But is abit lousy cos i took it with a mobile phone.. Let me try and see if it is right.. Look abit funny.. And Blur.. Hahaha.. But anyway it is A type B 5 room jurong west ST 64 Blk 678D Anyway, a quick summary of what happening.. I got my Keys on 01 Sep.. HDB is starting their rectifications since first week of Oct.. Til now i would only say one thing, nothing much been done.. I even have to call the higher technical officer to look at my home.. What i can only hope for is the problems would be solved soon.. Then my reno can start on time on 01 Nov.. Later will upload some of the defects.. Share this post Link to post Share on other sites
applefreak 1 Report post Posted October 26, 2008 spam chop hdb rectifications can be considered the major hurdle in renovation once you survived that, the actual renovation can be considered a breeze Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted October 26, 2008 YAA I see other people pulling their hair out over the HDB rectifications.. apparently these is more of a hassle than normal reno... Good luck with them. Hassle them more ok? Share this post Link to post Share on other sites
mmycheng 0 Report post Posted October 26, 2008 Welcome and congrats! It will be an exciting journey, don't stress over it too much, must enjoy the process ok? All the best for your reno! Share this post Link to post Share on other sites
junxian 0 Report post Posted October 26, 2008 hihi ! we got the same layout =D and collected keys on the same day ! haha. my rectification only lasted 2 weeks.... from mid oct to end oct... lucky my parquet was not so bad.. if not wait to to re-lay will .. unless really major defects... some of the stuff like grouting .. just closed 1 eye .. >.> Share this post Link to post Share on other sites
KPE 0 Report post Posted October 26, 2008 spam chop hmmm... can the higher technical officer solve the problem? Share this post Link to post Share on other sites
jleo207 0 Report post Posted October 26, 2008 Hmmm.. Finally starting a reno blog already.. ^.^ Hope our first house would turn out fine.. hey...we r stayin ay 678D too...5th floor...u? Share this post Link to post Share on other sites
sianz 0 Report post Posted October 27, 2008 spam chop hdb rectifications can be considered the major hurdle in renovation once you survived that, the actual renovation can be considered a breeze Thanks applefreak.. I thought so too.. HDB guys are the toughest hurdle.. I am having a tough time dealing with them YAA I see other people pulling their hair out over the HDB rectifications.. apparently these is more of a hassle than normal reno... Good luck with them. Hassle them more ok? I will pinkpetter.. ^.^ I will try to make life easy for me.. By disturbing them more.. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted October 27, 2008 whahaha But like one of the other forummers was mentioning.. it wasn't the HDB people who were terrible it was the contractor they hired and he was the only one who could do the thing. That's really crap man. He kept trying to collect money from the owners. *haiz* Don't you just hate being at the mercy of such people?! Share this post Link to post Share on other sites
sianz 0 Report post Posted October 27, 2008 Welcome and congrats! It will be an exciting journey, don't stress over it too much, must enjoy the process ok? All the best for your reno! Thanks mmycheng.. I will try my best to enjoy.. ^.^ Thanks for the advice.. Nice to see you.. hihi ! we got the same layout =D and collected keys on the same day ! haha. my rectification only lasted 2 weeks.... from mid oct to end oct... lucky my parquet was not so bad.. if not wait to to re-lay will .. unless really major defects... some of the stuff like grouting .. just closed 1 eye .. >.> Hi junxian. Happy to hear that.. Hehehe.. Nice to see one that collect the keys the same day as me.. Are you in jurong west st 64? Same block? As for me, the defects i guess HDB will not get away so easily.. I am a complain King.. The first time i complain, the list was very long.. spam chop hmmm... can the higher technical officer solve the problem? Hi KPE, Nice to meet you. When you have HDB contractors like "AH ONG".. I would dare say you would be very furious.. I have not choice but to bring the matter one level up.. At least, he promise me that everything will be done til i am happy.. For those forumers who stay in the same area with me would know how this "AH ONG" does his job.. Thinking of it make me angry, some more dare to scold my wife.. hey...we r stayin ay 678D too...5th floor...u? Hi jleo207.. Nice to meet you. I am on the 9th storey.. Your reno finish already?? If you dun mind, one day can i take a look at your reno? whahaha But like one of the other forummers was mentioning.. it wasn't the HDB people who were terrible it was the contractor they hired and he was the only one who could do the thing. That's really crap man. He kept trying to collect money from the owners. *haiz* Don't you just hate being at the mercy of such people?! Yeah pinkpetter, we should bring the matter up to HDB themselves. Let them solve the problem for us.. Share this post Link to post Share on other sites
sianz 0 Report post Posted October 27, 2008 Hehehe.. Well a quick update on the house progress.. Firstly all the defects.. My living floor.. There is some unresolvable stains on the tiles of my living room.. Besides these, thanks to those contractors who walk into my house with their shoes and trolleys.. I have seen these and make the complain accordingly.. So far complaining to "AH ONG", the only thing he say is we should clean the house more.. Some more scold my wife.. That is then i started to make the complain to the higher management.. Share this post Link to post Share on other sites
sianz 0 Report post Posted October 27, 2008 Now coming to the 3 bed rooms.. There is a big scratch on the floor, most likely is cause by the door.. Complain about it since day 1. Til now is the same. Besides this, there is also stains. I will be seeing the officer again on tuesday. Share this post Link to post Share on other sites
junxian 0 Report post Posted October 27, 2008 hee same JW st64 but I m from 677C. my reno already reaching carpentry phase le... next week start mounting. Share this post Link to post Share on other sites