Elston Phua 0 Report post Posted November 13, 2008 went down on wed to discuss with Roy what to do with all the reno... below are the things that we discuss n agree to do... Balcony..the door will be on the balcony floor instead of on the living room floor.. Kitchen entrance..after hacking the center to be the new entrance.. Kitchen layout...L-shape cabinet and black tiles in between cabinets and all the way to the washing M/C area... Common Toilet...the wall tiles of the common bathroom..layout of the basin still pending duno where to placed it.. Master bathroom...tiles no stock so got to go down n select 1 more time... will box up the pipe for the vanity top... went down and choose a red strip tiles for the common bathroom..to be laid in between the horizontal and vertical tiles...from the wall all the way till the bottom...it will create a pathway image...Roy think its nice also..so when ahead n bought it... Share this post Link to post Share on other sites
Elston Phua 0 Report post Posted November 28, 2008 Went to S & C furniture shop to get dining table, chairs and coffee table..overall a nice shopping trip..lady boss n boss ws there to tok to us abt their design n price... they have a lot of design bt u got to c from the brochure itself as they do import biz.. u will notice they have all the big designer coy furniture as well and the price is 2 or 3 times lower than them. finally choose the dining tables but the chairs are not the "chosen".. Coffee table.. Share this post Link to post Share on other sites
Elston Phua 0 Report post Posted November 28, 2008 (edited) 2nd week of reno...done last week..no time to post so now post everyting done in 2nd week... kitchen wall tiles were all up...din regret choosing the black n white tiles..looks gd.. common toliet wall&floor tiles..wah...wonderful job n color combine..tink the common toilet is better than the master toilet...tats wat i told Roy...haha.. closer look at the common toilet tiles..got curvy lines on them..3D effect.. master toilet..look at the bathing area(between the box up and the white wall tiles....so small but no choice..wat to do..tink will rather bath in the common toilet instead...haha... after viewing the reno...next stop went to genova to survey for WC prices n model... after looking ard was tinking of getting the promo items..whole set oni $388 tink its a gd buy 4 us.. but did not went ahead to buy, coz wana bring Roy to take a look 1st.. ok..tats all..will go down today n take a look...been toking to Roy to say that the reno is too slow..hahaha...tink cant move in b4 Xmas liao..hai... lets c today movement 1st..hopefully master toilet n kitchen floor tiles all done up..FingerX.. Edited November 28, 2008 by sanji37 Share this post Link to post Share on other sites
Yenming 0 Report post Posted November 28, 2008 wow. ur 2nd 3D drawing is very nice. i like the living room design. Share this post Link to post Share on other sites
luckable 0 Report post Posted November 28, 2008 (edited) hi sanji37, Nice tiles for toilet.. How's ur reno?? Floor tiles lay liao mah??? Next week our hse will start plastering.. When is ur handover date??? Edited November 28, 2008 by luckable Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted November 28, 2008 wah the S&C can only choose from brochure? did you pay deposit? did they say when can deliver? Seems nice... how much was the stuff? Share this post Link to post Share on other sites
Elston Phua 0 Report post Posted November 29, 2008 hi sanji37, Nice tiles for toilet.. How's ur reno?? Floor tiles lay liao mah??? Next week our hse will start plastering.. When is ur handover date??? ya...floor tiles lay liao..but skirting nt done..think wun b so fast as urs.. tok to Roy coz mi in-law went to c the date to move in..22dec but Roy say wun b reali by then. so i guess mayb next yr ba.. wah the S&C can only choose from brochure? did you pay deposit? did they say when can deliver? Seems nice... how much was the stuff? ya from brochure..but u can go showroom n c..they have most of the design there...u can go c from Morris. tink they carry most of their product there..or rather mayb Morris take from china oso..hahaha... i paid everyting liao the good will come in dec but sad thing is mi hse wun b ready by dec...hai... Share this post Link to post Share on other sites
Elston Phua 0 Report post Posted November 29, 2008 Update on Week 3...when up today n found that almost the floor tiles is up.. so happy finally see a lot of improvement... Master bathroom..wall tiles abt 80% all up.. Empty wall is for the full ht mirror Master bedroom..floor tiles all laid but skirting nt done yet.. kitchen L-partition block is up.. Wall tiles for the W/M area is up also... Cabinet raise floor and floor tiles are all up..but floor tiles are not cover with cardboard..will mi floor be full of scratches? or will the tiles b damaged? any1 any idea? Balcony floor is doing waterproofing and will lay tiles on friday.. The dining area..Uncle doing the floor tiles then the whole living n dining floor tiles will b all up.. view from e balcony and living room... View from the master room window Drawing from mi...comparing a 47" LG LCD TV and a 40" Samsung LCD TV..Finali decide to go for the 47" LG coz of mi big feature wall...if not the TV will look so small on a big feature wall... (See all the drawings left behind by the previous owner on all the walls in e hse......nt even a area is spared from the drawing...hai..) tats all for the 3rd week highlight..will update next week for the full month reno...haha... Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted November 29, 2008 ya from brochure..but u can go showroom n c..they have most of the design there...u can go c from Morris. tink they carry most of their product there..or rather mayb Morris take from china oso..hahaha... i paid everyting liao the good will come in dec but sad thing is mi hse wun b ready by dec...hai... Wah thanks thanks. Will go down on Tuesday to see see. so exciting le. How much is your dining set ah? Share this post Link to post Share on other sites
Elston Phua 0 Report post Posted November 30, 2008 Wah thanks thanks. Will go down on Tuesday to see see. so exciting le. How much is your dining set ah? dining set is about 850..they r quite stiff on the price..but their goods can match those designer shop.. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted November 30, 2008 mm ok ok ok that's an ok price ba if the quality is ok. Looks nice ma. I'll check them out on Tue. Thanks!! Share this post Link to post Share on other sites
Elston Phua 0 Report post Posted December 6, 2008 went today to take a look..still plastering... next week will meet mi aircon man n ID to lay aircon pipe and electrical works... any1 any suggestion where to buy lighting? really need ideas n gd budget...recession liao...haha... Share this post Link to post Share on other sites
luckable 0 Report post Posted December 6, 2008 hahaha.. mon roy bring us go buy lights.. i check it out for u... Share this post Link to post Share on other sites
Elston Phua 0 Report post Posted December 6, 2008 ic...he called mi last week say wana mit on monday to discuss about the electrical works..but i told him i gt to wk so change to next wed...gd gd..remember to take pic n post n the quote..haha... tink he will bring u to chelsea near his shop i tink... so ur hse all ok? chemical wash done? Share this post Link to post Share on other sites
luckable 0 Report post Posted December 6, 2008 me haven go see yet..i only noe last fri start doing electrical works, den next tues do aircon & delivery of sanitary wares.. u buy all ur toilet stuff oready ?? This morning we went to summer hardware, spend $2500 there.. POK KAI liao !!! Share this post Link to post Share on other sites