lushbelle 0 Report post Posted September 24, 2008 (edited) Hi guys, please help me see if this quote is expensive or not. HDB 4rm abt 106sqm I have supply of tiles so all is based on labour only. And the ID never breakdown the individual prices they just give me the lump sum. 1Hack & dispose off existing floor tiles at :- - 3 bedrooms- living- Kitchen- Master toilet- Common toilet 2Hack & dispose off existing wall tiles at - Kitchen- Master Toilet- Common Toilet 3Dismantle all unwanted cabinets & fixtures 4Dismantle existing L box 5Dismantle existing toilet bowls & basins 6Hack a portion of wall at between living & kitchen and plaster smooth B1Floor tiles 1SUPPLY LABOUR ONLY to lay floor tiles **** & store- includes skirting 2Supply labour & materials to lay cement screeding for 3 bedrooms 3Supply labour & materials to lay short-strip parquet for 3 bedrooms- includes skirting - Burmese parquet 4Supply labour to lay floor tiles at kitchen- includes water-proofing 5Supply labour to lay floor tiles at master toilet- including water-proofing 6Supply labour & materials to lay floor tiles at common toilet- including water-proofing B2Wall tiles 1Supply labour to lay tiles at kitchen- to full ceiling height 2Supply labour to lay tiles at master toilet- to full ceiling height 3Supply labour to lay wall tiles at common toilet- to full ceiling height C1To construct 50mm height kitchen cabinet base 2To construct 50mm height fridge base with tiles surface 3To construct 50mm height w/machine base with tiles surface 4Construct 50mm height shower kerb at master toilet PLUMBING & SANITARY 1To replace whole house s/steel pipings ( cold ) 2To extend sink & w/machine in/outlet 3To connect sink & w/machine in/outlet 4To install 2 x toilet bowls & basins ( Labour only ) 5Supply labour to install bathroom accessories & heater Whole house painting WHOLE HOUSE LAYING OF CARDBOARD ACID-WASHING ECARPENTRY WORK 1To design, construct & install shoe cabinets using laminates finish 4Ft 2To design, construct & install built-in wardrobes using laminates 7Ft 3To design, construct & install built-in kitchen cabinets using laminates 20Ft -supply & install s/steel dish-drainer -supply & install 1 no. of cultery tray -supply & install 1 set of drawers ( BLUM System ) -supply & install solid surface top ( 10 ft ) To install sink, cooker hood & hob ( Labour only ) TOTAL $28k Edited September 24, 2008 by lushbelle Share this post Link to post Share on other sites
ahjane 2 Report post Posted September 24, 2008 no breakdown?...why even bother to look at the quote or engage him....fire! Share this post Link to post Share on other sites
lushbelle 0 Report post Posted September 24, 2008 Hi all, The previous quote the ID never list down all the breakdown so i really dont know if it's of a reasonable quote. What about this quote from another ID? What other items have I miss out? Can advise me please. Thanks HACKING 1. Old tiles for the entire house. (living/3rooms/kitchen/kitchen walls/2 bathroomwalls) $2,600 2. Hacking a wall from the kitchen to living room (around 4ft) $300 3. Hacking away the L-box ceiling $160 per foot run (u didnt state is for living only or whole unit) 4. Remove the kitchen cabinent $250 FLOORING 5. Laying tiles for living/kitchen/2bathrooms (labour charge only) $1280 6. Laying Lacquer Parquet Wood Flooring (3 bedrooms) $3,000 7. Cement screeding before doing parquet flooring $1,050 - 3rooms 8. Relay toilet tiles (labour only) -2 toilets $1,100 ( 9. labour for WALL tiles of 2 bathrooms $1100 10.Water proofing grout for kitchen & 2 bathrooms) $700 ELECTRICAL 11. Rewiring the whole house powerpoint and SCV point estimated abt $3,200 MASONRY WORKS 12. Construct kitchen/fridge/washing machine base $300 13. Build a showerscreen kerb 2 Bathroom $300 CARPENTRY WORKS 14.20ft top & bottom cabinets with anti-slam hinges, 1no dish drainer & stainless steel backing at hob area ONLY $2780 15. Shoe Cabinent (aprox 3.5ft x 6.5ft) $780 16. Walk in Wardrobe (full height x 6.5ft) $1,780 (normal sliding door wardrobe with laminate finish) PAINTING 17. painting for walls $1,300 18. painting for 5doors $150 Share this post Link to post Share on other sites
JCase 0 Report post Posted September 25, 2008 They shld list down the breakdown. If they don't then move on. For kitchen, not sure 20ft enough. usually 20 ft cannot make it. So you will need to factor additional costs per foot run, usually $110. If you require tall cabinets (floor to ceiling), it's a different cost. If you require lots of carpentry in the kitchen then maybe you shld do away with wall tiles. Save $$ and not really necessary. Plaster and paint is enough. For the cooking area you can always install lacobel glass backing at price is around $30/pfr. For carpentry (wardrobe, shoe cabinet), general price is $240 pfr. So if cabinet is 7ft the cost is $1680. For wardrobes etc, pls note that it's the length of the cabinet. So, 7ft all the way up to ceiling is still $240/pfr. Solid surface (normal not the super ex brands) is arnd $90pfr. Post form is arnd $40-$50 pfr. Good luck. I may be wrong but cement screeding for bedrooms is FOC by HDB. At least it was for mine as it was a new unit. Share this post Link to post Share on other sites
PriscillaToh 0 Report post Posted October 16, 2008 hi JCase, noticed that u haf engaged *****.. hw is their pricing and service? haf u started the reno works aldy? i am looking for a reasonable pricing company to assist with my renovation. Any recommendation on ur current ID or renvation company? pls email me... priscillatoh@hotmail.com Share this post Link to post Share on other sites