Guest our-home Report post Posted September 11, 2008 (edited) Hi to everyone! We've gotten so much info/advice from others in this forum - thanks to you all. Now, we'd like to share our reno experience. We'll be doing the necessary only, very basic. If there's anything left in our budget, maybe we'll add on a little. Our third home is a 8-year old resale 2+1 apartment (91sqm) and we're renovating the kitchen and 2 bathrooms. Kitchen: Before Common bathroom: Before Edited September 23, 2008 by our-home Share this post Link to post Share on other sites
applefreak 1 Report post Posted September 11, 2008 spam chop i love the cement screed look :wub: Share this post Link to post Share on other sites
Nano 0 Report post Posted September 11, 2008 Spam Spam Chop. kitchen floor tiles overlaty or hacked ? Share this post Link to post Share on other sites
Angel81 1 Report post Posted September 11, 2008 Congrates on ur new home and enjoy ur renos. Looking forward to more pics! Share this post Link to post Share on other sites
sunset 0 Report post Posted September 11, 2008 Chop Chop got 3d drawing to show? Share this post Link to post Share on other sites
CutePinkElephant 0 Report post Posted September 11, 2008 spam spam chop chop....more pix.... Share this post Link to post Share on other sites
Jessie 0 Report post Posted September 12, 2008 congrats!!!! how much you spent on the reno? Share this post Link to post Share on other sites
Prettibride 0 Report post Posted September 12, 2008 we got the same toilet wall tiles~ nice!! Share this post Link to post Share on other sites
tpjack 0 Report post Posted September 12, 2008 spam chop. when kitchen cabinet coming? Share this post Link to post Share on other sites
SmartFool 0 Report post Posted September 12, 2008 wow ur toilet looks alot like some of my friends homes marble look! when reno finishing? ur kitchen and all still in good condition man Share this post Link to post Share on other sites
Guest our-home Report post Posted September 12, 2008 (edited) Common bathroom: 4 Sept Cement screeding and wall tiles overlay halfway done Kitchen: 6 Sept Kitchen floor tiles completed Master bathroom: 6 Sept Lower marble wall tiles hacked, cement screeding over existing ceramic wall tiles done Thank you, thank you all for the warm welcome! Yes, we'll post more pix as the reno progresses. My hubby is the official photographer. Nano, Kitchen floor tiles also overlaid. Jessie, We estimate between $30-35K will be spent on reno. Prettibride, Yep, my hubby liked the clean look and help make our tiny bathrooms look a little bigger. tpjack, Not sure, cos electrician coming this Wed, there's still aircon and painting. Carpentry maybe the week after. Will need to check with contractor. Smartfool, My hubby liked the marble-like look, that's why he chose it. Hopefully, reno finishes 1st week or latest middle October. Kitchen flooring looked worn out and we didn't like the wall tiles/cabinets. Same with common bathroom. Master bathroom definitely in bad condition. The previous owner rented this apartment out to different people during the entire 8 years. So did a lot of thinking - and decided to "standardize" the tiles. Tiling is messy, so get that done first and can change other stuff later on if need to. Drawing of proposed kitchen: Edited September 23, 2008 by our-home Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted September 12, 2008 hehe Spam chop! mm Yours is basic reno wor? but you hacked wall tiles. The before Kitchen looked ok ba but your new kitchen looks fantastic! more pix more pix! Share this post Link to post Share on other sites
sunset 0 Report post Posted September 13, 2008 clean cut kitchen. any 3d for bathroom? Share this post Link to post Share on other sites
SmartFool 0 Report post Posted September 15, 2008 Thank you, thank you all for the warm welcome! Yes, we'll post more pix as the reno progresses. My hubby is the official photographer. Nano, Kitchen floor tiles also overlaid. Jessie, We estimate between $30-35K will be spent on reno. Prettibride, Yep, my hubby liked the clean look and help make our tiny bathrooms look a little bigger. tpjack, Not sure, cos electrician coming this Wed, there's still aircon and painting. Carpentry maybe the week after. Will need to check with contractor. Smartfool, My hubby liked the marble-like look, that's why he chose it. Hopefully, reno finishes 1st week or latest middle October. Kitchen flooring looked worn out and we didn't like the wall tiles/cabinets. Same with common bathroom. Master bathroom definitely in bad condition. The previous owner rented this apartment out to different people during the entire 8 years. So did a lot of thinking - and decided to "standardize" the tiles. Tiling is messy, so get that done first and can change other stuff later on if need to. Drawing of proposed kitchen: heya nice choice by ur hubby! tink better put some time for delays and for cleaning up ur case same as mine mine quite old school liao so gota change the flooring and the previous owner also rented it out before we took over!! gd luck! bought all ur stuff and lites yet? Share this post Link to post Share on other sites
GMC 12 Report post Posted September 15, 2008 Hi to everyone! We've gotten so much info/advice from others in this forum - thanks to you all. Now, we'd like to share our reno experience. We'll be doing the necessary only, very basic. If there's anything left in our budget, maybe we'll add on a little. Our third home is a 8-year old resale 2+1 apartment (91sqm) and we're renovating the kitchen and 2 bathrooms. Wow, the design look so identical from my place. Share this post Link to post Share on other sites