nath.adrie 0 Report post Posted November 1, 2008 mwerkz said: how much u got the airon? i oso got the same one as u. r410 gas one. but i paid 2288 (150bucks for the steel frame)... i think i oso tio ka by gain city previously. nv buy at gain city expo sale!! Paid $2200 for everything including removal of the old unit. But mine is R22 type one. Share this post Link to post Share on other sites
nath.adrie 0 Report post Posted November 4, 2008 Some photos Shoes Cabinet (with doors installed): Remaining Wardrobe in Bedroom: Lightings in MBR: Lightings at Staircase area: Cosy area behind shoes cabinet. Will have a raised platform (yet to install): That's all for now. Personal checklist Yet to complete: Renozone 1) Raised platform for cosy area 2) Install windows grilles and windows 3) Shelvings @cosy area & kitchen 4) Piping and drainage for Washing Machine 5) Remaining Carpentry work 6) Skirting in way of previously hacked wall 7) Drill holes for bathroom accessories 8) Final Inspection 9) Handover Others: 1) Install wrought iron gate @main entrance 2) Painting (2nd coat / touch up) 3) Painting of exsiting handrails, pipings etc 4) Installation of WC, Basin, taps, etc DIY: 1) Washing / cleaning 2) Install bathroom accessories Yet to firm up: 1) Curtains / roller binds Share this post Link to post Share on other sites
mwerkz 0 Report post Posted November 4, 2008 (edited) nath.adrie said: Paid $2200 for everything including removal of the old unit. But mine is R22 type one. previously was 2288 for r410 unit. but i went to cancel it, use de deposit to buy a washing machine. den purchase a new aircon mit sys 3 inverter at 3129 comes with 5yr extended warranty, upgrade copper pipe, insulation to 1/2" n s/s bracket. i think more worth it? Edited November 4, 2008 by mwerkz Share this post Link to post Share on other sites
hapimint 0 Report post Posted November 4, 2008 I think Mit inverter aircon are still quite affordable... I think in the long term, its more worth it.... Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted November 4, 2008 mmm target completion is this week wor... mmm well at least all the major things done... Share this post Link to post Share on other sites
Byr 0 Report post Posted November 4, 2008 nath.adrie said: The scaffolds were erected by the contractor doing my plastering & painting job. Not sure if they will just provide scaffolding erection services. Do let me know if u need this plastering / painting contractor's no. Thanks.. I already paid for the plastering and painting guys... not sure at this moment.. Thanks for the offer, will Pm you if i need.. thanks Share this post Link to post Share on other sites
nath.adrie 0 Report post Posted November 10, 2008 ID told me shld be able to handover by Thursday. Arranged for painters to go do up the 2nd coat on Wednesday. Hopefully can finish painting on Sat. Next week will have to go full swing with cleaning up and moving already. Some more photos... Wrought Iron Gate Hmm, dun know should I get the Town Council people come and paint our external door or just ask my painter to paint it with white paint. The last time, the painter told me they aren't painting the external wall. Or I just DIY. Wardrobe in BedRoom 2 The wardrobe was built in accordnace to the dimension we agreed; but after building, we realize can't put any bed at its side, which we wanted initially The cabinet / wall featured under the staircase Raised platform at the Cosy Area Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted November 11, 2008 HUH but yours is an ID le... isn't he suppose to advise you on the dimensions?? now cannot fit bed liao how? What does he suggest.... poor thing.. Share this post Link to post Share on other sites
nath.adrie 0 Report post Posted November 12, 2008 pinkpetter said: HUH but yours is an ID le... isn't he suppose to advise you on the dimensions?? now cannot fit bed liao how? What does he suggest.... poor thing.. Well, there's no black and white to show that it's our requirement that the remaining space must cater for a single size bed. However, we did have an agreement on the dimension of the wardrobe. Thus, nothing much we can do abt it now. ID said he can modify the wardrobe, but cutting a corner of the wardrobe so that it can be pushed below a beam on the side; However, we think that it will look ugly and thus drop the idea. We can still have a bed fitted in the room, but not in the ideal corner / location that we wanted initially lor. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted November 12, 2008 huh poor thing. well at least still can fit bed and the problem is solved somewhat. Share this post Link to post Share on other sites
nath.adrie 0 Report post Posted November 12, 2008 (edited) Almost everything is done except for one more window panel at the recess area. Installation of new WCs and basins will be done this Sat (15 Nov). Delivery of furniture and home appliances over the next two Sat. Hopefully things bought from Red Apple will come as promised. Photos... (some repeated but with painted walls) Grilles and windows at Recess Area General View of Living Area Another view (with cosy area at the back) "Featured wall" Grilles at staircase area changed Handrailing painted Entrance to MBR MBR (view 01) MBR (view 02) MBR (view 03) Study Room (view 01) Study Room (view 02) Study Room (view 03) Bed Room (view 01) Bed Room (view 02) Staircase area (General view) Edited November 12, 2008 by nath.adrie Share this post Link to post Share on other sites
mwerkz 0 Report post Posted November 12, 2008 i like ur living room! looks so big n spacious =) Share this post Link to post Share on other sites
Fuchsia_star 0 Report post Posted February 25, 2009 Hi nath.adrie, Can u share your contact for the painting contractor? evafter@gmail.com Thanks Share this post Link to post Share on other sites
lyn32 0 Report post Posted April 5, 2010 hi nath.adrie, i just gotten a unit in potong pasir similar to yours. would you mind sharing w me on the renovation cost and more pictures? thanks! Share this post Link to post Share on other sites
nath.adrie 0 Report post Posted April 5, 2010 lyn32 said: hi nath.adrie, i just gotten a unit in potong pasir similar to yours. would you mind sharing w me on the renovation cost and more pictures? thanks! Hi hi... Which Blk & floor did you purchase? You may email me at nath.adrie@gmail.com to find out more. Share this post Link to post Share on other sites