Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
RawR

Bunny & Kitty Mini Lair

Recommended Posts

Hi mmycheng,

Thanks for the feedback~!

I think the lines are pretty funky! nice :thumbs up:

Hi bakebeam

Yup, thinking of changing the artwork~

hehe, u see till so detailed~ actually, i forgot to unhide my false ceiling layer, so it didn't get rendered~ the ceiling supposed to be the same *ganna caught* lol :P

yes, i also think painting + artwork make the house looks heavy and smaller, plus the lines TV console...hmmmm :unsure: sort of distracting.

think your ceiling design also plays an important feature to the whole house. design 1: same level ceiling make the whole house looks like one piece, like a 1 room flat (hope you don't mind my lousy description).

Hi melody8

The sink is from bellari~

Actually, now thinking of changing to a smaller sink ><

Got only 300mm between my stove and sink~ den my HB was saying that from what he observed, I usually don't use the 2nd bowl... very true too~ so now thinking of changing to a single bowl ^^

Hi, is this sink from poh joo too?? :)
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Dong Tu Ceremony

27 Oct 2008: Dong Tu!

dongtu.jpg

Not very sure how to do the ceremony also, we 'agaragar' pray pray just do in case ^^

Have finally decided! Gonna go with Ho Bee for the renovation works =^-^=

HDB will be starting the upgrade work on 22nd Nov to 5th Dec. Current plan is for Patrick to apply for the permit first, then do the hacking first. After HDB complete the work, do the rest of the reno~

 

Share this post


Link to post
Share on other sites
Dong Tu Ceremony

27 Oct 2008: Dong Tu!

dongtu.jpg

Not very sure how to do the ceremony also, we 'agaragar' pray pray just do in case ^^

Have finally decided! Gonna go with Ho Bee for the renovation works =^-^=

HDB will be starting the upgrade work on 22nd Nov to 5th Dec. Current plan is for Patrick to apply for the permit first, then do the hacking first. After HDB complete the work, do the rest of the reno~

Hi RawR,

Haven't chat with you for a long time. HDB will be doing the upgrading work at my flat on 18th to 29th Nov. So I believe your unit is also at Lift B ?

 

Share this post


Link to post
Share on other sites

Hi pinkpetter,

Thanks for the feedback ^^

Wah I had a great time oogling at your 3D... wish I could do the same. I prefer the living without artwork though. Dunno why :P
 

Share this post


Link to post
Share on other sites

Hi alyplwwf,

HDB will be doing mine between 22nd Nov to 5th Dec~ Yours will nearly finish before mine starts!

Anyway, I'm thinking of changing the floor tiles and 1 panel of wall tiles for the toilets~ Must go give 'kopi $' ask them help me lay the different layout =P

masterbathroom.jpg

Oh, will you be in your house when they are doing the upgrade? I'm starting my new job on 3rd Nov... can I just leave the door open for them for the 11 days??

Loads of things to try to settle in my remaining free time X_X Gotta find some one to take away the furnitures too... Got a new set of bed frame, wardrobe, dressing table with stool unused.

Hi RawR,

Haven't chat with you for a long time. HDB will be doing the upgrading work at my flat on 18th to 29th Nov. So I believe your unit is also at Lift B ?

 

Share this post


Link to post
Share on other sites

Purchase on 27 Oct 08

funiture-shbednsofa.jpg

Bought my storage bed for master bedroom yesterday. Maybe abit tall for some, but I <3 the deep storage area beneath it. Planning to store my luggages, spare tiles, loads of misc items in it~!

As for the sofa bed, I still cannot decide on a suitable sofa for the living area. Gonna use this temp (or maybe perm ?_? ) and try to find one that is comfy, stylish and not too harsh on the pocket. If I found my purr-fect sofa, this shall go into the study room ^^

 

Share this post


Link to post
Share on other sites

Hi mwerkz, lushbelle, applefreak,

Got the bed from Seahorse Tiong Bahru @ S$639.50 after the leather change. Mine will be cream color, like the sofa color. Black one I think is $450+?

The sofabed also from Seahorse @ S$499.50, half leather, comes with a mattress pad and pillow~ ^^

 

Share this post


Link to post
Share on other sites
Hi mwerkz, lushbelle, applefreak,

Got the bed from Seahorse Tiong Bahru @ S$639.50 after the leather change. Mine will be cream color, like the sofa color. Black one I think is $450+?

The sofabed also from Seahorse @ S$499.50, half leather, comes with a mattress pad and pillow~ ^^

erms. 499.50 seems like quite a good price. do they have red? if dey do, i'll consider getting it for my study room

 

Share this post


Link to post
Share on other sites

Don't think they got red =X

I remembered they got 6 colors, cream, dark brown, light brown, black, purple and ?

Maybe u can try calling them @ 6622 1039

erms. 499.50 seems like quite a good price. do they have red? if dey do, i'll consider getting it for my study room
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×