RawR 0 Report post Posted July 28, 2008 Hi! We've gotten our keys last year, but with the pending upgrade, had postponed our renovation plans. The upgrade will begin in Oct 08~ so finally time to make reno plans! What HDB will be doing for us @ $2490 after gov subside =3 1. Replacement of existing squat pan to pedestal type 2. Replacement of existing pedestal with new pdestal 3. Floor retiling / tiling with water proofing 4. Wall retiling / tiling 5. Replacement of PVC Bi-fold door toilet doors including frame 6. Supply and install stainless steel grab bars 7. Replacement of toilet vents 8. Replacement of wash hand basins 9. Replacement of windows and grilles 10. Replacement of entrance gate 11. Change of waste pipe in toilets 12. Change of waste pipe in kitchens 13. Repair of spalling concrete to internal units 14. Replacement of existing pipe sockets to stainless steel clothes drying sockets Will have to top up to change the windows **** room and br2 to sliding windows with the HDB contractor. Thinking of getting a contractor to do up the place instead of ID. ^^ My Tentative Plans Revised Floor Plan Share this post Link to post Share on other sites
RawR 0 Report post Posted July 28, 2008 My List of Work-To-Be-Done (A) Demolition WorkHacking of 2 bedrooms and 1 storeroom door & framesHacking of floor finish and skirting for living room, BR1, BR2 and storeroomHacking of kitchen’s wall finish & floor finish and skirtingHacking of kitchen’s build-in tiled sink Hacking of wall between kitchen & living roomHacking of wall between storeroom & BR1 (B) Wet WorksTopping up of kitchen floor to level with living room using extruded polystyrene foam (EPF) Laying of waterproofing membrane at kitchen Supply and construct 50mm cabinet, washing machine and fridge base, with tiles (Note: Total of 6.7m length)Plaster of whole unit wall, including the wall beside the steps up to the unitSupply and install new wall for storeroom (where the door used to be)Construct main entrance kerb © Plumbing WorksReplacement of standard copper piping for kitchenSupply and install water concealed inlet pipe for sink in kitchenSupply and install water concealed outlet pipe for sink in kitchenSupply and install water concealed inlet pipe for washing machine in kitchenSupply and install water concealed outlet pipe for washing machine in kitchenSupply labour to install 1 no washing machine tapSupply labour to connect water pipe for 2 sets instant heaters (D) Floor WorksProvide and lay tiles for the 3 step up to the houseProvide and lay homogenous tiles (600mmx600mm) at kitchen c/w skirting Provide and lay ceramic wall (300mmx600mm) finish at kitchen Supply and laying of homogenous tiles (600mmx600mm) **** room, bedroom1, bedroom2 and storeroom c/w skirting (E) Electrical WorksRewire of whole houseSupply and install new electric box Supply labour to install electric plug point Supply labour to install lighting point (downlight and others)Supply labour to install lights for cove lighting (indicated in ceiling work)Supply labour to connect 2 instant heaterSupply labour to connect hob in kitchen cabinetSupply labour to connect hood into kitchen cabinetSupply labour to connect door bellSupply labour to extend telephone line and SCV line to BR1 and BR2 (F) Ceiling WorksInstall Cove lighting with light holder for living room (29 foot run)Install false ceiling for living room (51 sq ft)Install false ceiling for bedroom 1 (42 sq ft)Install Cove lighting with light holder for bedroom 1 (30 ft run)Install Cove lighting with light holder for bedroom 2 (42 ft run)Plastering of whole unit ceiling (G) Supply LabourLabour to install cooker hood & hob Labour to install build-in oven and microwave in floor-to-ceiling cabinetLabour to install sink (H) Carpentry Work Design & fabricate kitchen cabinet in ABS trimming laminated doors c/w. Base cabinet 20 foot run, wall cabinet 11 foot run, floor-to-ceiling cabinet 6 foot run. Include designed handles, cutlery tray, lazy susan for corner base cabinet and all internal shelvesSolid surface worktop 19 foot run Provide and install frosted glass panel backing at cooker hob Provide and install frosted glass splashback behind sinkProvide and install glass door between Kitchen and Living Room, 9ft (W) x Ceiling HeightFabricate Dining Room box-up wall, 8ft (L) x Ceiling Height x 7” (W)Fabricate Dining Room suspended table, 3ft6” x 3ft8”Fabricate Dining Room 2 benches, 3ft8” (L) x 1ft4” (W) x 1’1” (H) eachSupply and install mirror at Dining Room, opposite box-up wall 2.431m (W) x 2.643m (H)Fabricate TV console with glossy laminated finishes (2layers) 2 shelves 2ft (L) x 8” (W) each Hinged Shelf Console for TV 1ft (L) x 7” (W) x 6” (H) Side Cupboard 10” (L) x 10” (W) x 1ft (H) Drawer on right side 4ft (L) x 11” (W) x 1ft 4” (H) Cupboard to hide electric box 3ft7” (L) x 1ft (W) x 3ft 3” (H) Stainless steel strap 3ft 3” (H) x 1”(W)Fabricate Shoe Rack with glossy laminated finishes 5ft 6” (L) x 2ft 11” (H) x 1 ft 6” DBox-up **** room window with glossy laminated finishes 5” (L) x 5ft 8” (H) x 5” (D) & 3” (L) x 5ft 8” (H) x 1ft 6” (D)Fabricate Wardrobe with glossy laminated finishes 2m (L) x 0.58m (W) x Ceiling Height & 2m (L) x 0.35m (W) x Ceiling Height. Supply and install mirror at bedroom (0.87m x 2.643m)Provide and install sliding door between wardrobe and BR1 (1.8m width) (I) Painting WorksTo paint whole house with Nippon Paint, including the wall beside the steps up to the unit (Light & Space Paint) To paint whole house copper/pvc pipes with Nippon Gloss PaintTo paint or varnish whole house door frames with Nippon Gloss PaintTo paint or varnish whole house doors, main door included with Nippon Gloss Paint (J) Miscellaneous ItemsLaying of floor protection after completion of flooringProvide and install fire approved main doorProvide and install new refuse chuteChemical washing for whole unitGeneral cleaning upon completionAll permit applicationDebrise removal Did I missed out anything? Share this post Link to post Share on other sites
mrlamkh 0 Report post Posted July 28, 2008 Well Description! U mean u waited from last year till now then start ur reno? So u all stay parents place? How much monthly bill u all paid? Won't it be a pity not to move in earlier? Anyway congrats for the kick off... Mine 2nd appt on Thurs... Hope to learn from u... Bukit Purmei... Near urs... Enjoy! Share this post Link to post Share on other sites
RawR 0 Report post Posted July 28, 2008 Yup, cos we scared after we reno then the HDB contractor come do toilets, windows, pipes will spoil our reno mah >< Currently staying with my HB's parents. I think $36.5 for conservation fees, $11.50 for water and refuse. True that it's a pity, but we felt that it is better to time the reno near the upgrade, so we don't need to stay in during the upgrade (think dust and no toilet) =P Gratz on getting your new place soon! =^^= Well Description! U mean u waited from last year till now then start ur reno? So u all stay parents place? How much monthly bill u all paid? Won't it be a pity not to move in earlier? Anyway congrats for the kick off... Mine 2nd appt on Thurs... Hope to learn from u... Bukit Purmei... Near urs... Enjoy! Share this post Link to post Share on other sites
RawR 0 Report post Posted July 28, 2008 Amateur Attempt on Living Room Console The false ceiling should be white color >< The red cupboard on the right shall hide the electric box. Will go all the way to the cove lighting ceiling to hide the wire (in green). The console that the TV is a pull-open drawer with hinges at the base. Think will put light below it for effect. To the right is the main door, to the left, the entry way to the MRB and even further left, the mirror walled for the dining area. The sofa is a modular system (v draft) that we saw at furniture mall, kidney shape, the round portion can move ^^ Colors PlanConsole in Glossy Dark Red and Glossy GraySofa not decided, maybe suede black or if possible change to cream leather / PVC finishPaint color for walls **** room: ICI Light and Space, Desert Wind (LS 22274). Hopefully can reflect more light and make the living room less long and narrow Paint color for passageway: ICI Supreme Bisque (SP22803) or Mocha Delight (SP26346) Share this post Link to post Share on other sites
applefreak 1 Report post Posted July 28, 2008 spam chop good idea to wait until hdb is done you'll never know what they can do to your reno when they fix my flat's defect, it's never ending coz they always manage to damage something else when fixing the existing defect Share this post Link to post Share on other sites
RawR 0 Report post Posted July 28, 2008 Hi applefreak Welcome ^^ Just saw your blog (the start only, sooo long hehe). Your house so good, got concealed wiring. *envy* spam chop good idea to wait until hdb is done you'll never know what they can do to your reno when they fix my flat's defect, it's never ending coz they always manage to damage something else when fixing the existing defect Dining Room Suspended table 2 benches with storage below. Thinking of red upholstery Box up to conceal the gas pipe, will hide the wiring and water pipe inside too. Erm, can box up the pipe right? O_O Mirror opposite the box-up Glass panel and door in between dining room and kitchen. After 3hr of rendering it is finally done~ at lowest quality some more hehe =P Share this post Link to post Share on other sites
Starscream 0 Report post Posted July 28, 2008 Hey RawR. Nice, so you got lots of time to do the planning. Share this post Link to post Share on other sites
Cyn 1 Report post Posted July 28, 2008 Hi RawR! Nice 3Ds u did there!! Have fun renovating! Share this post Link to post Share on other sites
applefreak 1 Report post Posted July 28, 2008 (edited) Hi applefreak Welcome ^^ Just saw your blog (the start only, sooo long hehe). Your house so good, got concealed wiring. *envy* hi hi, thanks for checking out my blog the behind are more of chit-chatting liao now we are planning a little BKK trip yes the concealed wiring is good in a way but cannot add any points coz can't do it concealed also, cannot anyhow drill coz might kenna the wires your 3D really tok kong leh wish i know how to do something like this Edited July 28, 2008 by applefreak Share this post Link to post Share on other sites
RawR 0 Report post Posted July 29, 2008 Hi! Only now got lotsa time, gonna find a job soon =3 Hey RawR. Nice, so you got lots of time to do the planning. Thanks Cyn! ^^ Hi RawR! Nice 3Ds u did there!! Have fun renovating! Hmm, guess do have some problem with concealed wiring. But.. still hope to get a house w/o so much trunking running around~ like the 'flow' keep getting block =P I also started learning awhile ago~ draw w google sketchup ^^ hi hi, thanks for checking out my blog the behind are more of chit-chatting liao now we are planning a little BKK trip yes the concealed wiring is good in a way but cannot add any points coz can't do it concealed also, cannot anyhow drill coz might kenna the wires your 3D really tok kong leh wish i know how to do something like this Share this post Link to post Share on other sites
RawR 0 Report post Posted July 29, 2008 TV Console Attempt 2 Realized last night that the TV console cannot hide the electric wires and cable points to the TV ><" New TV Console~ simpler design The right side tall red cupboard shall hide the electric box. Below the electric box, I'm thinking of an empty space w/o shelving, not sure if I can find a vacumn cleaner that can fit into 30cm x 40cm though >< The wires to the TV will go inside the tall red cupboard, out behind the grey long console and out of a little cut out hole. Left side red cupboard to store DVDs, CDs and misc items Plan to have aircon in the left hand side corner. Hopefully it can be place there and the trunking can be hidden in the false ceiling in the passageway Color Scheme remains the same Next up, the passageway~ Share this post Link to post Share on other sites
aves 0 Report post Posted July 29, 2008 wow u used sketchup to draw all that? i using sketchup also but dunno how to make the textures so nice. also alot of things like window heights, door size etc i dunno whats the measurements. also dunno where got ceiling beam etc etc... so hard to draw.... Share this post Link to post Share on other sites
RawR 0 Report post Posted July 29, 2008 Yup, sketchup then SU Podium to render the image. It's a plug-in for use inside sketchup ^^ The rendering does make loads of difference I think, here's a 2D export direct from sketchup w/o rendering for your reference ^^ My current window height and door also estimates =P wow u used sketchup to draw all that? i using sketchup also but dunno how to make the textures so nice. also alot of things like window heights, door size etc i dunno whats the measurements. also dunno where got ceiling beam etc etc... so hard to draw.... Share this post Link to post Share on other sites
RawR 0 Report post Posted July 29, 2008 Passageway Square sink-in region in the ceiling Planning to hang a crystal lamp, hopefully square to match the ceiling. Yellow warm light to be used here. Hang our wedding photo, in burnished gold frame, there. =^^= Color Plan: ICI Mocha Delight for walls, ICI Gloss Finish Nutmeg for door-frame (subject to final door color) Left Side: Dining Area Mirror; Right Side: TV Console Share this post Link to post Share on other sites