hapimint 0 Report post Posted July 19, 2008 advice needed.... I finally shortlisted an ID that my husband is quite happy with.... Quote is Project Management Design Conceptualization, Space Planning, Colour Scheme and Materials Proposal for the Whole House, Site Inspection and Whole House Cleaning Free Kitchen To supply labour and materials to lay imported homogenous wall tiles exclude border and decor tiles (tiles @ $3.00 & below) 1650 Lay imported homogenous floor tiles c/w waterproofing membrane treatment (tiles @ $3.00 & below) 850 Construct 2" thick cement mortar base for fridge clad with tiles 160 Construct 2" thick cement mortat base for kitchen cabinet clad with vertical tiles 200 Construct sink support using approved 63mm hollow block 650 Install 1 no. of stainless steel flat rubbish chute at yard area 200 To supply labour and materials to construct 27.5ft designed top & bottom kitchen cabinet c/w sets of drawer, designed handle, stainless steel dish rack, "BLUM" motion system for all doors, PVC hard edging, cutlery tray and shelving using solid plywood with selected laminated finishing 2915 To supply labour and materials to install 14.5ft selected solid surface material kitchen counter top c/w front profile and backspliash (include side panel facing existing kitchen toilet facing existing kitchen toilet entrance) c/w 10 years warranty against manufacturer's defects 1015 To supply labour and materials to install 10.5ft 6mm thick coloured tempered glass backing between top & bottom kitchen cabinet 480 Install 1 no of 3ft x 7ft 10mm thick tempered clear glass casement goor at kitchen entrance c/e 1ft fixed panel glass and standard lockset 680 To supply labour and materials to install 1 no of kitchen sink and tap c/w drainage system (labour only) 120 Change existing water pipes to stainless steel piping 180 Living Room To supply labour and materials to change existing main door to new solid nyatoh main door (non-fire rated) c/w standard lockset and varnishing 550 Change 4 nos of bedroom door lockset 120 To supply labour and materials to install simple cornices ****/dining area 350 To supply labour and materials to plaster living/dining ceiling 480 Master bedroom To supply labour and materials to construct 14.5ft designed open concept walk-in wardrobe using solid plywood with chemical veneer finishing 2680 Construct 3ft x 7ft designed wooden sliding door (2 panel) at proposed walk-in wardrobe entrance using solid plywood with selected laminate finishing 1180 To supply labour and materials to construct partition false wall for proposed walk-in wardrobe area 450 Master Bathroom To supply labour and materials to lay imported homogenous wall tiles exclude border and decor tiles (tiles @ $3.00 & below) 1800 Lay imported homogenous floor tiles c/w waterproofing membrane treatment (tiles @ $3.00 & below) 450 To supply labour and materials to construct 2.5ft L-shaped underneath vanity cabinet c/w wall to wall mirror using solid plywood with selected laminate finishing 400 To supply labour and materials to install 1 no of 10mm thick tempered frameless clear glass shower screen c/w standard lockset 450 To supply labour and materials to install 2.5ft vanity counter top c/w 10 years warranty against manufacturer's defects 180 To supply labour and materials to create new floor trap FOC Labour to install 1 no of toilet bowl 110 labour to install 1 no of washbasin and tap 100 change existing water pipes to stainless steel piping 180 labour ro install 1 no of shower mixer tap 50 labour to install toilet accessories FOC supply and install 1 no of instant heater c/e heater wire 220 To supply labour and materials to install 1 no of aluminum anodised bi-fold door c/w acrylic panel at master bathroom entrance (bronze or silver) 250 Kitchen toilet To supply labour and materials to lay imported homogenous wall tiles exclude border and decor tiles (tiles @ $3.00 & below) 1800 lay imported homogenous floor tiles c/w homogenous floor tiles c/w waterproofing membrane treatment (tiles @$3.00 & below) 450 To supply labour and materials to install 1 no of aluminum anodised bi-fold door c/w acrtlic panel at common bathroom entrance 250 To supply labour and materials to create new floor trap FOC Labour to install 1 no of toilet bowl 110 labour to install 1 no of washbasin and tap 100 change existing water pipes to stainless steel piping 180 labour ro install 1 no of shower mixer tap 50 labour to install toilet accessories FOC supply and install 1 no of instant heater c/e heater wire 220 To supply labour and materials to hack, dismantle and clear the existing rubbish chute, wash basin and toilet bowl at both bathroom, door, window between kitchen and yard area, 2 nos of roman pillar **** room, fan, light in bedrooms and living/dining room, sink & stove support, kitchen cabinet and bases, 2 bathroom wall and floor tiles, kitchen wall (does not include kitchen cabinet area) and floor tiles and existing cornices for living/ dining area 1600 To supply labour and materials to apply HDB permit FOC Lay corrugated paper protection during renovation period FOC Acid wash and general cleaning upon completion FOC Haulage, provide sand and hoisting of materials to site 580 Installation of hood,hob & oven FOC total After discount- 22550.00 Share this post Link to post Share on other sites
Topspin 1 Report post Posted July 22, 2008 What size is the apartment/HDB? Share this post Link to post Share on other sites
hapimint 0 Report post Posted July 31, 2008 sorry for the late reply... had something wrong with my internet... managed to log online from my hubby's place.... My place is 133sqm..... a 5A unit.... Share this post Link to post Share on other sites
EL23 0 Report post Posted July 31, 2008 sorry for the late reply... had something wrong with my internet... managed to log online from my hubby's place.... My place is 133sqm..... a 5A unit.... i am getting a resale 5i unit... can pm me your id? Share this post Link to post Share on other sites