Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
mimisan

House Of Happy~

Recommended Posts

Hello all.

We have collected our keys in end May and have already started on our reno. But we didnt have time to start a blog. Hope its not too late! :dancingqueen:

Heres my floorplan!

floorplan.jpg

Some old pictures taken when we signed off the OTP.

P1070545.jpg

P1070544.jpg

When you step into the house

P1070530.jpg

TV wall

P1070562.jpg

MBR Toliet

P1070568.jpg

#02 Common Toliet

P1070534.jpg

P1070537.jpg

Kitchen

Majority of the floorings is changed except the kitchen. Due to budget constrains, we decided not to do anything to the kitchen. maybe Kitchen revamp part 2 few years later. :dunno:

Our reno is done by a nice contactor and the price was within our small budget. All ID exceeded out budget hence, we decided to be our own ID to create our simple house. :yamseng:

Things that we have done in our Reno

Level 1

- Hack and relay living, dinning, study room and courtyard

- Tie down exisiting cornices

- Install L-Box

- Change all switches

- Seal up TV wall

- Change all lightings

Level 2

- Overlay parquet on existing flooring

- redo 2 toliets

:D:D:D

My hubby forget to upload the progress of the reno pics and we have accidently deleted them thinking that either 1 of us has already saved a copy. Hence we can only show pictures that are already near so completion.. Hahaa.. :dunno:

P1080818.jpg

P1080817.jpg

When you enter the house.

These are the new Homo tiles. 600x600. You can also see the long L-Box from the picture. Floor is Un-polished/un-clean mode :notti:

P1080824.jpg

Close up of the L-Box. Lights not installed yet.

P1080825.jpg

Sealed Up TV Walls

P1080826.jpg

Flooring at the courtyard - old wallpapers not removed yet

P1080830.jpg

Unpolished parquet

P1080834.jpg

P1080835.jpg

P1080841.jpg

MBR Toliet - in dirty mode

P1080851.jpg

P1080854.jpg

Lvl 2 Common toliet

P1080872.jpg

New Legrand switches. Wanted gray but the box behind only comes in white :furious:

so choose white in the end

my camera cant take the full image of the toliet. any tips ?? so that i can take the entire toliet? :dancingqueen:

Next week, will be installing of lights, painting, installing tolieties and hopefully polishing of parquets! :sport-smiley-004::sport-smiley-004::sport-smiley-004:

Ok thats all for now.. Shall post updates when i have it again :yamseng:

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

progress is slow this week. hehe so no pics at the moment.

Anyone has any idea what can i buy to paste on my old sliding door for the kitchen?

Its initially translucent in colour but i think over time, it become yellow in colour and its quite ugly.

Thinking of pasting something over it maybe like laminate or something that is "wipe-able"?

Dun want to waste $$ to replace tat door leh anyway how much does a sliding door cost?

Edited by mimisan
 

Share this post


Link to post
Share on other sites

Hi Wonder if u can help by advising how much was e reno cost as per what u listed for e works? Just got myself an EM and is searching for some reference. Thank you in advance for the help.

Byron

 

Share this post


Link to post
Share on other sites

Hi,

Level 1

- Hack and relay living, dinning, study room and courtyard with 600x600 Homo, up to $3.5 tiles

- Tie down exisiting cornices

- Install L-Box

- Change all switches

- Seal up TV wall

- Change lvl1 toliet bowl and taps and basin.

- Install polycarbonic roof to seal up the bocany(small portion)

- Painting, including grills, all doors and re-spray main iron gate.

Level 2

- redo entire 2 Toliets wall and floor with homo tiles up to $2.8 tiles.

- including hot/cold piping, installation of toliet stuff

- including the basin and toliet bowl.

- Glass showerscreen for both toliets

My contractor did all the work above except for the parquet it costs abt 17K in total.

Parquet is abt 3k from a seperate contractor.

Electrical cabling and new switches abt 1.5k.

:)

 

Share this post


Link to post
Share on other sites

Hi Mimisan,

Wao, looks like ur contractor gave u a good deal! :P Any pics for us to :dribble:

Hi Byron,

Hehe.. Another new EM owner! Hehe.. drop by the EM thread to tell us more about ur new place! :P

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×