mwerkz 0 Report post Posted October 14, 2008 (edited) mwerkz : hmm.. didnt think of that.. thanks for the advise Aves : i be at blk 112 facing PIE also.. 10th floor hehe... should be the same location unit as yours i be getting my keys in Jan 09. your floorplan look exactly like mine... hehe... no worries. cos my hubby's home, de rubbish chute is below de sink. n de thing i dread doing most at his place is opening de rubbish chute ur 4room oso very big. hehe. n somemore kitchen is oredi open concept. no need hack liao Edited October 14, 2008 by mwerkz Share this post Link to post Share on other sites
aves 0 Report post Posted October 14, 2008 Aves : my bedroom 3 is also facing the corridor ... but temporarily become study room.. hehe until No 2 comes along. we bought it at 296K valuation plus 25K cash Sob2....... Heartpain whenever saying the 25K word out heh mine is 295+13... but ur flat much nearer to MRT la... Share this post Link to post Share on other sites
aves 0 Report post Posted October 16, 2008 we have brought tau up to our house and he gave us the final quote today. based on pricing still unable to compete with what my friend gave me so we have more or less confirmed to sign with our friend. just tmrw we go view his completed projects to see the standard of work and workmanship. if its ok we will sign with him.... hopefully it wont be a choice we will live to regret... Share this post Link to post Share on other sites
aves 0 Report post Posted October 20, 2008 Ok, we've seen the flat my friend did. Workmanship is ok. Actually also donno what to look out for but we check those edges on the floor and laminates etc all seem fine... Already verbally confirmed with him that we'll be choosing him. Now trying to get my reno loan from RHB. BTW, hacking will start on Wednesday! Wohoooo! Share this post Link to post Share on other sites
aves 0 Report post Posted October 21, 2008 last night we went up with my ID to do some confirmation of what needed to be done and the electrical points needed. gonna meet him on wed to go choose tiles liao... Share this post Link to post Share on other sites
Jessie 0 Report post Posted October 21, 2008 hi aves, rem post more pix here for us./..ok? Share this post Link to post Share on other sites
aves 0 Report post Posted October 21, 2008 gotta change the tiles choosing date to thursday cos the tiles shop owner stuck in china due to flight delay....shrug? jessie: yeah will try to go up and take more pics cos i also very excited to see progress being made. Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted October 21, 2008 yay Renovation starting liao right? Must be very exciting! I just realise we're going to be neighbours... heh heh Share this post Link to post Share on other sites
aves 0 Report post Posted October 22, 2008 (edited) today first day of hacking. gonna go down in the evening with my FW to see the 'damage' done. lol anyway i added my ID name and phone below for anyone who wanna try him out or ask him for quote. do let him know aves reccomendded him. lol Edited October 22, 2008 by aves Share this post Link to post Share on other sites
aves 0 Report post Posted October 23, 2008 (edited) Some pics of the hacking progress. Nothing much to see cept debris... hehehe Edited October 23, 2008 by aves Share this post Link to post Share on other sites
rdnest 0 Report post Posted October 23, 2008 Love Total make-over!!! Keep those pictures coming!! Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted October 23, 2008 The first picture... hack untill that line or will hack more? *confused* why leave half? lol or haven't hack finish? Share this post Link to post Share on other sites
aves 0 Report post Posted October 24, 2008 haven finish.... basically the house will be left with windows and main door after the hacking is complete... Share this post Link to post Share on other sites
Angel81 1 Report post Posted October 24, 2008 Haha! This one will be extreme makeover! Looking forward to see the transformation. Share this post Link to post Share on other sites
aves 0 Report post Posted October 24, 2008 heh. not much makeover also cos in the end only do the 2 toilets makeover kitchen makeover flooring false ceiling **** electrical wardrobe at MBR change all doors not much carpentry so it wouldnt look like much is done actually... Share this post Link to post Share on other sites