secret_ag 0 Report post Posted June 6, 2008 Hi all, need some advise on the typical timeline for a kitchen cabinet to be constucted for a normal 4 room flat kitchen. Just for carpentry work. Any advise are appreciated. Thanks. Share this post Link to post Share on other sites
waileong 0 Report post Posted June 6, 2008 A few weeks. They come, take measurements, go back to factory, make, then install and touch up. How "few" depends on the design you have chosen, how fast you can finalise all your selections of laminates and drawers and stuff, and whether they have your specific items in stock (esp. the countertop material). Share this post Link to post Share on other sites
werdna 0 Report post Posted June 20, 2008 Hi all, need some advise on the typical timeline for a kitchen cabinet to be constucted for a normal 4 room flat kitchen. Just for carpentry work. Any advise are appreciated. Thanks. really depends how you want ur cabinet to be done up. budget? as long as you cfm it fast it will be done fast. at least 2 to 3 weeks? Share this post Link to post Share on other sites
hihihi 0 Report post Posted June 20, 2008 agree it'll be 2-3 weeks fastest. Need to choose laminate. If u do built in hood/hob, best is wait for u to buy then take actual measurement, then they cut the hole. Share this post Link to post Share on other sites
thevert 0 Report post Posted July 11, 2008 Don't worry about the "hole-cutout" for sink/stove/hob or hood. The carpenters will cut the correct hole to fit them when installing the kitchen cabinets at your home, provided your stuffs are already delivered and ready for their measurement. It's not "pre-cut" at factory. But I think kitchen solidtop or granitetop is precut at factory. Share this post Link to post Share on other sites
kewin 0 Report post Posted April 13, 2009 does it still take that long to make a kitchen cabinet. Share this post Link to post Share on other sites
hamdan 0 Report post Posted April 21, 2009 does it still take that long to make a kitchen cabinet. Its take ard 7 to 9 days to produce aft they had taken measurement, n its take 1 to 2 days to finish install Share this post Link to post Share on other sites
LitteDreamer 0 Report post Posted June 4, 2009 Its take ard 7 to 9 days to produce aft they had taken measurement, n its take 1 to 2 days to finish install Correct me if I'm wrong...that means kitchen alone will take roughly ard 10 days? Within this period, must we ensure that our kitchen stuff such as sink,taps etc has been bought? Share this post Link to post Share on other sites
hihihi 0 Report post Posted June 4, 2009 Correct me if I'm wrong...that means kitchen alone will take roughly ard 10 days? Within this period, must we ensure that our kitchen stuff such as sink,taps etc has been bought? 1) they'll take measurement and prefab in their factory. (~6-7days max) 2) They then deliver to your house and install all the pieces together, cut the holes, install hinges (2-3days) ya, of coz u need to get the sink + tap onsite when they come to (2). Otherwise how they know hole size to cut and also need to install your tap/sink. Share this post Link to post Share on other sites
LitteDreamer 0 Report post Posted June 4, 2009 1) they'll take measurement and prefab in their factory. (~6-7days max) 2) They then deliver to your house and install all the pieces together, cut the holes, install hinges (2-3days) ya, of coz u need to get the sink + tap onsite when they come to (2). Otherwise how they know hole size to cut and also need to install your tap/sink. Thanks hihihi.... Share this post Link to post Share on other sites
trees 0 Report post Posted June 6, 2009 the carpenter takes ard 4 days to fab if ur design not complicated., install 1 day complete. .then depends on your table top is the normal type or tos granite /solid surface, top takes another 3-5 daysto install upon measurement of your kitchen top. Share this post Link to post Share on other sites
LitteDreamer 0 Report post Posted June 15, 2009 the carpenter takes ard 4 days to fab if ur design not complicated., install 1 day complete. .then depends on your table top is the normal type or tos granite /solid surface, top takes another 3-5 daysto install upon measurement of your kitchen top. Thanks.. Share this post Link to post Share on other sites
Sneha 0 Report post Posted July 5, 2009 Kitchen cabinets found at most popular home improvement centers are made of inexpensive and low-grade material. Designing and building kitchen cabinets takes a lot of time and consideration to do it right. If you are working with a new empty and open room, this helps, but most of us will be starting with a kitchen already full of cabinets - so we have to take all of the measurements available, and even draw a quick diagram of how the room is configured right now to help plan for the layout of utilities. __________________ bath vanity modern bathroom vanity shower enclosures Share this post Link to post Share on other sites