enz 0 Report post Posted November 11, 2008 one more update. my curtains are finally done, after 1 mth of moving in. cos very lazy to go and look for curtain. cedric did it for me, and the effect is rather nice. my living rm wooden venetian blind bedroom 1 curtains bedroom 2 curtains my wife's friend bought this for us during her trip to japan, finally i found enough materials to hang this up at our kitchen doorway. BUT the hangers gave way this morning. haiz not sticky enough. think got to either nail or put more hangers. Share this post Link to post Share on other sites
stevetang 0 Report post Posted November 13, 2008 Can pm me your contractor contact?? Want to check with them for something. Thanks Share this post Link to post Share on other sites
enz 0 Report post Posted November 9, 2010 hi, very long nv come back here to update anything. I've just recently changed my light switches to big button types. took me 6hours, but i quite like the change! the old switches! bedroom 1 bedroom 2 living room master bedroom Share this post Link to post Share on other sites
enz 0 Report post Posted November 9, 2010 master toilet kitchen living room very hard to replace storeroom Share this post Link to post Share on other sites
enz 0 Report post Posted November 9, 2010 storeroom...led goes off when light is on took me 2 hours to change this alone... 4 gangs switch is too expensive, and cable too messy...decided not to change at all. Share this post Link to post Share on other sites