Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
big orange

Bedok Central

Recommended Posts

Everyone from Jan BE - What your schedule of picking up keys. thanks.

i will be collecting mine this thur..

i think yours is gg to be soon since your HLE has been approved..

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
Hey Big Orange, i already got my keys a week ago.

Jan Be or SERS?

i will be collecting mine this thur..

i think yours is gg to be soon since your HLE has been approved..

usual. u BE or SERS?

 

Share this post


Link to post
Share on other sites

hi big orange, i think the schedule for taking keys should be according to when the block is completed rite? regardless whether you are from sers or BE group. those from 220a which is first to complete should be already gotten keys ba?

so those unpainted block, i predicted should be july/aug lo after china construction handed to hdb and hdb did a check on the flats.

so far i had contact with U home director, he is a friendly guy, willing to explain to you most of the stuffs but yet to be very convinced about the works, and heard some not so good feedback about the company from the forum now...so still pondering.

also contact with coos design,so far saw quite positive works from them with reno for flats in sengkang.

and also considering ideal home which is recommend by some members here...

so these are the 3 ID which i am considering at the moment....

 

Share this post


Link to post
Share on other sites
Jan Be or SERS?

usual. u BE or SERS?

oredi said i m from BE.. ha!

Edited by mocchi
 

Share this post


Link to post
Share on other sites

i don think is based on completion of flat.. me 220B completed and got ppl live inside.. but i still haven get my keys n HLE approved.. i think is by q no or wat so..

anyway.. wait lo.. the flat will run away.. hehe :dancingqueen:

 

Share this post


Link to post
Share on other sites

it should be in each blk there will consist of pple from SERS and BE cases. SERS select the flats first. after which the remaining are put up for BE. you will notice most of the BE are not so high floor.

some SERS & BE will get their Key first as the Flat is completed. eg. 220A, some SERS may had already finish Reno. in fact my neighbour alrady living there.

 

Share this post


Link to post
Share on other sites

so far, i think i will contact

1. idealhose

2. plush living

3. Gplan

4. Intradesign

5. Defong

6. Citydesign

7. Classic Design

8. Ho Bee

Do you think these will do? no point asking too much quotation? right?

If there is any very good one. please let me know.

TIA.

Edited by big orange
 

Share this post


Link to post
Share on other sites
so far, i think i will contact

1. idealhose

2. plush living

3. Gplan

4. Intradesign

5. Defong

6. Citydesign

7. Classic Design

8. Ho Bee

Do you think these will do? no point asking too much quotation? right?

If there is any very good one. please let me know.

TIA.

I think this should be enough for a start. Too many = headache :dunno:

it should be in each blk there will consist of pple from SERS and BE cases. SERS select the flats first. after which the remaining are put up for BE. you will notice most of the BE are not so high floor.

some SERS & BE will get their Key first as the Flat is completed. eg. 220A, some SERS may had already finish Reno. in fact my neighbour alrady living there.

Maybe your neighbour is my dad :P . Which floor did you get?

 

Share this post


Link to post
Share on other sites
I think this should be enough for a start. Too many = headache :dunno:

Maybe your neighbour is my dad :P . Which floor did you get?

my idea of taking key is same as yokoyoko.

SERS - go 1st.

Follow by

BE by Que # (whenever possible since there are some blks have not completed)

:)

 

Share this post


Link to post
Share on other sites
will be going down today to see defong ID work. Anyone interested? last call.

Arrange around 3pm. Drop me with ur number. I will text you.

How is defong's ID work?

 

Share this post


Link to post
Share on other sites
To Everyone: Anyone knows ... once we get the keys, will HDB impose a certain period of time which we will have to start renovating? Or can we leave it vacant until we're comfortable with starting?

Hi Cacky

From: HDB Renovation guide FAQ

Q6.How much time am I given to complete my renovation work? How

soon would I need to commence the renovation works in my new flat

and the frequency of the renovations allowed in a flat?

For new blocks, you must complete the approved renovation works within four months from

the date of the renovation permit. For established blocks, the approved work must be

completed within one month from the date of the renovation permit. This is to minimise any

inconvenience and noise nuisance to the existing residents.

There is no restriction on when the renovation works should be carried out by the flat owners

and/or the frequency of the renovation. This is to facilitate flat owners in the planning of the

renovation in their flats, in terms of their financial resources and time schedule.

Q11. I can't complete the renovation works within the time allowed?

What should I do?

Your registered renovation contractor can submit the request for extension of the

renovation period via the “Application For Renovation Permit via Electronic Transaction”

system (APEX) through the HDB InfoWEB at www.hdb.gov.sg under “E-Services

>Housing Admin E-Services (HAES)>Submit an e-Application>Renovation Permit”.

HDB Branch Office will accede to the request if the reasons given are justifiable.

Edited by LimeGreen
 

Share this post


Link to post
Share on other sites
lineargreen3011ar1.th.jpg lineargreen4ko0.th.jpg lineargreen1wk8.th.jpg lineargreen2rx3.th.jpg
Edited by DSA
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×