mocchi 0 Report post Posted June 2, 2008 Everyone from Jan BE - What your schedule of picking up keys. thanks. i will be collecting mine this thur.. i think yours is gg to be soon since your HLE has been approved.. Share this post Link to post Share on other sites
big orange 0 Report post Posted June 2, 2008 Hey Big Orange, i already got my keys a week ago. Jan Be or SERS? i will be collecting mine this thur.. i think yours is gg to be soon since your HLE has been approved.. usual. u BE or SERS? Share this post Link to post Share on other sites
darcbleu 0 Report post Posted June 2, 2008 hi big orange, i think the schedule for taking keys should be according to when the block is completed rite? regardless whether you are from sers or BE group. those from 220a which is first to complete should be already gotten keys ba? so those unpainted block, i predicted should be july/aug lo after china construction handed to hdb and hdb did a check on the flats. so far i had contact with U home director, he is a friendly guy, willing to explain to you most of the stuffs but yet to be very convinced about the works, and heard some not so good feedback about the company from the forum now...so still pondering. also contact with coos design,so far saw quite positive works from them with reno for flats in sengkang. and also considering ideal home which is recommend by some members here... so these are the 3 ID which i am considering at the moment.... Share this post Link to post Share on other sites
mocchi 0 Report post Posted June 2, 2008 (edited) Jan Be or SERS? usual. u BE or SERS? oredi said i m from BE.. ha! Edited June 2, 2008 by mocchi Share this post Link to post Share on other sites
yokoyoko 0 Report post Posted June 2, 2008 i don think is based on completion of flat.. me 220B completed and got ppl live inside.. but i still haven get my keys n HLE approved.. i think is by q no or wat so.. anyway.. wait lo.. the flat will run away.. hehe Share this post Link to post Share on other sites
herbman76 0 Report post Posted June 2, 2008 it should be in each blk there will consist of pple from SERS and BE cases. SERS select the flats first. after which the remaining are put up for BE. you will notice most of the BE are not so high floor. some SERS & BE will get their Key first as the Flat is completed. eg. 220A, some SERS may had already finish Reno. in fact my neighbour alrady living there. Share this post Link to post Share on other sites
big orange 0 Report post Posted June 2, 2008 (edited) so far, i think i will contact 1. idealhose 2. plush living 3. Gplan 4. Intradesign 5. Defong 6. Citydesign 7. Classic Design 8. Ho Bee Do you think these will do? no point asking too much quotation? right? If there is any very good one. please let me know. TIA. Edited June 2, 2008 by big orange Share this post Link to post Share on other sites
Bubbly 0 Report post Posted June 2, 2008 so far, i think i will contact 1. idealhose 2. plush living 3. Gplan 4. Intradesign 5. Defong 6. Citydesign 7. Classic Design 8. Ho Bee Do you think these will do? no point asking too much quotation? right? If there is any very good one. please let me know. TIA. I think this should be enough for a start. Too many = headache it should be in each blk there will consist of pple from SERS and BE cases. SERS select the flats first. after which the remaining are put up for BE. you will notice most of the BE are not so high floor. some SERS & BE will get their Key first as the Flat is completed. eg. 220A, some SERS may had already finish Reno. in fact my neighbour alrady living there. Maybe your neighbour is my dad . Which floor did you get? Share this post Link to post Share on other sites
big orange 0 Report post Posted June 2, 2008 I think this should be enough for a start. Too many = headache Maybe your neighbour is my dad . Which floor did you get? my idea of taking key is same as yokoyoko. SERS - go 1st. Follow by BE by Que # (whenever possible since there are some blks have not completed) Share this post Link to post Share on other sites
lovelee 0 Report post Posted June 2, 2008 will be going down today to see defong ID work. Anyone interested? last call. Arrange around 3pm. Drop me with ur number. I will text you. How is defong's ID work? Share this post Link to post Share on other sites
big orange 0 Report post Posted June 2, 2008 How is defong's ID work? personally it good. i feel lo. waiting for their quote now. Share this post Link to post Share on other sites
lovelee 0 Report post Posted June 2, 2008 personally it good. i feel lo. waiting for their quote now. did u take any pic? Share this post Link to post Share on other sites
LimeGreen 0 Report post Posted June 2, 2008 (edited) To Everyone: Anyone knows ... once we get the keys, will HDB impose a certain period of time which we will have to start renovating? Or can we leave it vacant until we're comfortable with starting? Hi Cacky From: HDB Renovation guide FAQ Q6.How much time am I given to complete my renovation work? How soon would I need to commence the renovation works in my new flat and the frequency of the renovations allowed in a flat? For new blocks, you must complete the approved renovation works within four months from the date of the renovation permit. For established blocks, the approved work must be completed within one month from the date of the renovation permit. This is to minimise any inconvenience and noise nuisance to the existing residents. There is no restriction on when the renovation works should be carried out by the flat owners and/or the frequency of the renovation. This is to facilitate flat owners in the planning of the renovation in their flats, in terms of their financial resources and time schedule. Q11. I can't complete the renovation works within the time allowed? What should I do? Your registered renovation contractor can submit the request for extension of the renovation period via the “Application For Renovation Permit via Electronic Transaction” system (APEX) through the HDB InfoWEB at www.hdb.gov.sg under “E-Services >Housing Admin E-Services (HAES)>Submit an e-Application>Renovation Permit”. HDB Branch Office will accede to the request if the reasons given are justifiable. Edited June 2, 2008 by LimeGreen Share this post Link to post Share on other sites
big orange 0 Report post Posted June 2, 2008 did u take any pic? sorry i didnt. Actually another couple went with me. prehaps they can shed some lights? Share this post Link to post Share on other sites
DSA 0 Report post Posted June 2, 2008 (edited) Edited June 2, 2008 by DSA Share this post Link to post Share on other sites