virgo2829 0 Report post Posted May 29, 2008 i will try to take and upload some pictures after they have done the 1st round of washing up.....paiseh.... now in a big mess...sianz to take pictures... Share this post Link to post Share on other sites
Jessie 0 Report post Posted May 29, 2008 hi vrigo, sure sure,...look forward to your pix... Share this post Link to post Share on other sites
virgo2829 0 Report post Posted June 2, 2008 all lightings are up except the common toilet and 2 ceiling fans for the bedrooms... they are doing the 1st round of wash up today and carpentary work will be starting this Wednesday....Overall, happy with the reno works except some minor issues which ID was kind enough to rectify asap.... Pictures as promised........ Main Door (will stained all wooden doors to black) Grilles (all stained to black silver) Dining Lights Kitchen (0verview without kitchen island and cabinet) Kitchen (Laundry Area) Kitchen (Kitchen Island Lights) Kitchen & Living Area Tiles Kitchen Toilet Living Area - Ceiling Fan Living Area - Floor Tiles Master Bedroom (Platform) Master Toilet Master Room Doors (same as the other 2 bedrooms - will stain to black) Son's Room Laminate Flooring (For the 3 bedrooms) Stairs (steps have yet to be stained to black) Will take more pictures tonite.... Share this post Link to post Share on other sites
redknapp39 0 Report post Posted June 2, 2008 I like ur main door and window grilles. Very nice Share this post Link to post Share on other sites
darrenelle 0 Report post Posted June 2, 2008 Hi there... I like your kitchen!! Share this post Link to post Share on other sites
babytan 0 Report post Posted June 2, 2008 swee swee sia..now waiting to see the carpentary nia.. Share this post Link to post Share on other sites
Jessie 0 Report post Posted June 2, 2008 hi virgo nice nice! i really like your kitchen and the main door leh. how much you paid for the main door? Share this post Link to post Share on other sites
virgo2829 0 Report post Posted June 2, 2008 Hi there... I like your kitchen!! Thanks......the kitchen is still in a big mess! swee swee sia..now waiting to see the carpentary nia.. as per id, the carpentary work is starting tomorrow, therefore, tonite, me and hubby need to go up and check on the tiles; irregardless if they have done the first round of washing..... hi virgo nice nice! i really like your kitchen and the main door leh. how much you paid for the main door? it is a fire rated door and with the special stainless strips and door handle, it is expensive....can dun state the price? Share this post Link to post Share on other sites
redknapp39 0 Report post Posted June 2, 2008 (edited) it is a fire rated door and with the special stainless strips and door handle, it is expensive....can dun state the price? Fire rated door sure expensive one. Bo pian. Surely $1K plus. It's a stupid requirement. If im not wrong, the door must be able to withstand fire for 30s. By then, i would have left the building if i were on the 6th floor. Just like the bombshelter design in new buildings. Another crap idea. If building get bomb, dun tell me there will be 1 stack of rooms left standing. Nonsense. Edited June 3, 2008 by redknapp39 Share this post Link to post Share on other sites
skywolf 0 Report post Posted June 2, 2008 Wah... luckily mine is not within the criteria to fix a fire-rated door. Redknapp, are you required to have one? Mine is too far from lobby even though it's 1st unit. Haha! Share this post Link to post Share on other sites
redknapp39 0 Report post Posted June 2, 2008 My home along the corridor. Dun need. I think those near the lift must have fire rated door. Share this post Link to post Share on other sites
babytan 0 Report post Posted June 3, 2008 the fire door should be half hour rated 1 la..not all HDB main doors got to be fire-rated huh? anyway me also not going for that..too expensive liao...think 1.5K leh~~ Share this post Link to post Share on other sites
Jessie 0 Report post Posted June 3, 2008 oooo...must be very expensive! ok ok.....can dun state the price here hmm...i m still thinking of what door to get for my hse,........was thinking dun get the fire-rated door. (cut cost lor....but also hv to consider abt the safety measures).......*haiz* not all hse need fire-rated door???? sure??? my hse is 3rd unit away from the lift lobby........so???? think i better check on this....b4 decide on the door lor. Share this post Link to post Share on other sites
virgo2829 0 Report post Posted June 3, 2008 ID mentioned not necessary to have fire rated door cos much more expensive...but my hubby worried next time when we need to sell, HDB will give problem...so might as well! no lah...ok lah...since babytan guessed it is $1.5k, more expensive than i paid for...then i state out lor...i paid $1300 for it....expensive? Share this post Link to post Share on other sites
babytan 0 Report post Posted June 3, 2008 aiya ok la in terms of safety lor..think i mentioned previously la.. if got fire, SCDF come within 3-5 mins liao still need HALF hour fire rated door for wat?? hahahaha Share this post Link to post Share on other sites