Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
Reiki

The Reiki Sanctuary

Recommended Posts

Often, we wonder how long does it take for a renovation to finish? We feel that our renovation has been dragging too long and there is still no indicative date for a handover. It has now more than 3 months - haha, it is 3 months and 6 days to be exact

All over the house, there are still some works to be completed.

Anyway, sharing here some of the renovation pictures:

Carpentry works in Dining Area. The wardrobe, right of picture, is basically to conceal the aircon trunkings.

DiningWardrobe1-1.jpg

Our new gate:

NewGate1Bforblog.jpg

The Study Area and the kiasu electrical power plugs at study table:

Study-GlassedLowBench1A.jpg

StudyTableSwitches1G.jpg

Edited by Reiki
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

More Pictures

Lightings

The only hanging light in the house is this one in the Dining Area. Once renovation is completed, we will lower down the lights.

DiningLights1.jpg

Led Lights around the house:

- Dining Area at the wall ledges [right and left]. A frosted glass will cover the lights.

Dining-LedgeLights1.jpg

- Under the TV Console in the Living Room

LivingRoom-TVConsoleLights1B.jpg

- At the bed head in Master Bedroom

MBR-BedFrameLights1.jpg

- At the Master Toilet [Works not fully completed here]

MBRToilet-TotoSink1.jpg

 

Share this post


Link to post
Share on other sites

The Incomplete Kitchen Cabinet

We can't afford a full Blum system. Only using the mechanism for all the drawers and top hung cabinets. Carpenters waiting for the glass framed to install to the drawers and doors. Our kitchen will be black floor, white glass framed drawers and black top.

The Dry Area:

Kitchen-DryArea1C.jpg

The Wet Area:

Kitchen-WetArea1L.jpg

Hopefully, the island hood can be installed this monday.

Edited by Reiki
 

Share this post


Link to post
Share on other sites

Did you work out a schedule or timeline with your ID/contractor? Usually the reno permit also states how long the company engaged needs to carry out their work. Sometimes certain companies take on too many jobs and therefore you might need to 'push' then a little harder.

Anyway, your house is shaping up well. Like the LED lights! hee :notti:

Where exactly is your location ah?

 

Share this post


Link to post
Share on other sites
Did you work out a schedule or timeline with your ID/contractor? Usually the reno permit also states how long the company engaged needs to carry out their work. Sometimes certain companies take on too many jobs and therefore you might need to 'push' then a little harder.

Anyway, your house is shaping up well. Like the LED lights! hee :notti:

Where exactly is your location ah?

The completion date changed few times :bangwall: Initially, we were told early september, then mid september, then early october. Problem is, it is an architect friend handling our project .. it is abit hard to be nasty :(

My place is in Jurong East

Reno Updates:

The Living Room

LivingRoom1.jpg

The Kitchen

- We are still having problem with Franke Island Hood. Seems no personnel can install it :bangwall:

The Wet Area - Kitchen-WetArea1-1.jpg The Dry Area - Kitchen-DryArea1.jpg

The Kingsized Bed Frame

MBR-BedFrame1.jpg

 

Share this post


Link to post
Share on other sites
Love the Design Reiki....Like it Bright. Hope I'll be able to post more pictures here once my place is done up too.

Thanks!

All the best to your reno. I am sure it will be nice. :)

Your suspended tv console is using normal light tube or led lights? :)

We are using led lights. Our designer feels it will give a uniform hotspot throughout which cannot be achieved with a normal light tube.

And led light consumes lower electricity cos of its lower wattage.

Very nice living room and MBR toilet. Looking fwd to see the end product. Sure very nice! :)

Thanks Angel81. Will try to post more pics.

We are busy cleaning up the place the last few days as we will be moving in early next week.

very neat n clean. nice!

Thanks! :)

hi,

nice main gate u have...wats e price like? where u gt it?

It is custom made. Err, not very sure of the price - Designer is yet to invoice us but were told about $850.

 

Share this post


Link to post
Share on other sites

At last, we managed to solve the problem with the Franke Island Hood. It took few days with few alternatives. The lesson learned - it will be very problematic to install an island hood in old hdb unit if you don't have a good floor-ceiling height.

FrankeIslandHood1A.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×