Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
Reiki

The Reiki Sanctuary

Recommended Posts

Reiki: Does Legrand Mallia have the base container (not the switch cover) for houses without concealed wiring? ie. of where this switches are matched onto. I just wanted to find out more before I could find time to go Choo Chiang later.

Sorry for the late reply, Starscream.

I am not sure about it. Best if you are to check with the shop or your electrician/designer. :)

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

I was very pleased with the works done by our general contractors. Their job is basically to remove all wardrobe/cabinets, sanitaryware and plumbing pipes, electrical wires and hacking.

When I went down to inspect the house last wednesday - which was the second 'hacking day', most of the jobs were almost completed. Indeed, it was a super fast job and the place was, surprisingly, orderly. There were no debris left in the house and all the sands/cements were neatly stacked for the commencement of the next tasks.

Some Pictures:

01. Entrance to Dining and Living Areas (View taken from Kitchen)

- We need to ge the contractor to remove all the archs and to level the top entrances (Arrow)

EntrancetoDining-Living1A.jpg

02. Entrance to MBR (View taken from Living/Dining Area)

The contractor is to create a new door for Guest Room (Arrow) and to remove the ceiling beam arch. The store room has been removed and to make way for the WiW and Study area.

EntrancetoMBR1.jpg

03. Entrance to MBR Toilet

The contractor is to remove the whole wall (Arrow) to make the toilet an open concept. :sport-smiley-004:

EntrancetoMBRToilet1.jpg

04. Entrance to Study Area (View taken from MBR)

EntrancetoStudyArea.jpg

05. The Stiffener Wall

This is the only wall that HDB gives restriction to our hacking application. It would be very silly of us to hack this stiffener wall (Arrow) - which is really small, and pay almost a thousand dollars just to engage a PE to oversee the work.

StiffenerWall.jpg

More Pictures:

06. Guest Toilet

The contractor is to create a new entrance [near to window] to the Guest Toilet.

GuestToilet.jpg

07. Kitchen Entrance to Living Area

KitchentoLiving1A.jpg

 

Share this post


Link to post
Share on other sites

Our renovation is progressingly rather slow. This is our third week and nothing much have been done.

The waterproofing test is being carried out since yesterday morning and it will last till friday afternoon. Only then, that more reno works will start.

Some waterproof test pictures:

Kitchen

Reno-WaterproofatKitchen1.jpg

Guest Toilet

Reno-WaterproofatGuestToilet1B.jpg

MBR Toilet

Reno-WaterproofatMBRToilet1.jpg

More renovation pictures available at Reiki Sanctuary

 

Share this post


Link to post
Share on other sites

Renovation is still underway - there are still many works ahead and we are already in the third week. Renovation pictures are available at Reiki Sanctuary.

Meanwhile, we are also busy getting furniture stuffs for the house. Some of the things bought over the weekend:

L-Shaped Fabric Sofa:

2930mm long

Sofa-FCLSeaterFabric1A.jpg

Ottomon

1200 x 600mm long.

It will be the same fabric as the Sofa.

FCOttomon1-1.jpg

The Coffee Table

900 x 900mm

FCGlassCoffeeTable1.jpg

The Side Table

400 x 400mm

FCGlassSideTable1A.jpg

The Carpet for Living Room

1600 x 2300mm

FCCarpet1A.jpg

Edited by Reiki
 

Share this post


Link to post
Share on other sites

Renovation - Week 3

Rather pleased with the works done by our electrician - how he laid the electrical wires and nicely covered at the far end with cylindrical case. We have also decided to drop using Legrand Mallia and go for Berker K5.

More about Berker at Reiki Sanctuary

Pictures of Electrical Works:

Works are not completed. The electrician will come back once false ceiling - which we intend to put all around the house, including kitchen, and paintings are done.

01. Wiring **** Room

WiringatLiving1B.jpg

02. Wiring at Dining Area

WiringatDining.jpg

03. Wiring at Kitchen

WiringatKitchen.jpg

04. Wiring at MBR n Study

WiringatMBRnStudyArea.jpg

Edited by Reiki
 

Share this post


Link to post
Share on other sites
wah balcony can lim kopi

congrats!

when estimated handover date?

Oops, been so busy. Hmm :( .. we are not sure when we can move in. Estimated 18 September but looks like cannot make on that date.

 

Share this post


Link to post
Share on other sites

Our renovation is progressing rather slow. Now, into the 6th weeks, we are only about 50% done. There are still tons of works to do.

Renovations done so far:

01. Installation of false ceiling all throughout the house.

02. Wall smoothened and plastered.

The Living Area:

PlasteredWall-LivingatTV1.jpg

A nice boxed-up of aircon trunks under the beam and the new bedroom door frame:

FalseCeiling-AirconTrunk.jpg

03. Laying of parquet teakwood in all the bedrooms including at the house main entrance. We omitted skirtings all throughout the house. The parquet is being cured now. Sanding down and matte works will only be carried out on 1st September.

The Main Entrance:

MainEntranceTeakParquet1A.jpg

Master Bedroom and Study Area:

MBRnStudyTeakParquet1.jpg

More stories and pictures at Reiki Sanctuary

Edited by Reiki
 

Share this post


Link to post
Share on other sites
Our renovation is progressing rather slow. Now, into the 6th weeks, we are only about 50% done. There are still tons of works to do.

Renovations done so far:

01. Installation of false ceiling all throughout the house.

02. Wall smoothened and plastered.

The Living Area:

PlasteredWall-LivingatTV1.jpg

A nice boxed-up of aircon trunks under the beam and the new bedroom door frame:

FalseCeiling-AirconTrunk.jpg

03. Laying of parquet teakwood in all the bedrooms including at the house main entrance. We omitted skirtings all throughout the house. The parquet is being cured now. Sanding down and matte works will only be carried out on 1st September.

The Main Entrance:

MainEntranceTeakParquet1A.jpg

Master Bedroom and Study Area:

MBRnStudyTeakParquet1.jpg

More stories and pictures at Reiki Sanctuary

Wow but looks nice. I like the flooring... :) Congrats! And .. MBR open bathroom.. mmm :) nice!

 

Share this post


Link to post
Share on other sites

The Toilets

The two toilets - Master and Guest, are still not completed. Only the tiles are laid. The shower glass, sanitaryware and shower sets will only installed much later.

Few things that we are happy here:

1. Rather than the normal drop, we make sure that we have a gentle ram instead.

Ram at Guest Toilet

GuestToilet-Ram1B.jpg

Ram at Master Toilet

MasterToiletFloor1.jpg

2. The custom made soap racks.

Rack at Guest Toilet

GuestToilet-Rack1.jpg

Rack at Master Toilet

MBRToiletRack1.jpg

3. The Master Toilet

The Feature Wall needs to be oil-glazed to make it shine and 'more' black. The ugly pipes will be boxed up. We will erect a full length recycled wardrobe next to the pipes and just after the ceiling beam.

MasterToilet1.jpg

MasterToilet1B.jpg

PS: Sorry guys .. some of the pics are just too big even though it has been resized.

Edited by Reiki
 

Share this post


Link to post
Share on other sites

One of our most expensive single purchase is our dining set.

XZQTBaronBlackGlassTopDiningTable1.jpg

We are getting this table (1.6 x 7.5 m and can be extended up to 2.2m) without the chairs.

And 6 of this chair:

XZQTEvenChair-Black1.jpg

Edited by Reiki
 

Share this post


Link to post
Share on other sites
beautiful dining table and chairs

then nw ur reno extend till when?

end of sept?

seems like its only like 50% completed

Yes, we feel that it is only 50% completed to date. We are now given the date, 18th September. Don't think we will move in immediately. Would prefer to 'air' the house, of all the chemical smells, after that so that our dog won't suffer. Likely to move in October now.

Our concern is the delivery of most items that we had ordered. Not sure they can delay further - already, we had postponed the dates.

Hehe, the delivery of the dining set is only in November. We are lucky that the company will loan us a set when we move in.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×