Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
euph0bear

Euph0bear 一起开始的旅程

Recommended Posts

where is this area of the MBR??

Look at my floorplan, I shifted the MBR door further out (away from the living area) , making space for a wardrobe at the area between the MBR door and toilet.

Edited by euph0bear
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
your wardrobe looks quite small, is it enough?

Yup, it is indeed very small due to the layout of the MBR. If I were to place the wardrobe in the main area with my queen sized bed, there will be hardly any other spaces for other furnitures. :bath:

 

Share this post


Link to post
Share on other sites

Today went on another shopping spree to purchase my furnitures. I remembered seeing a newspaper advertisement from Brighton Furniture awhile back and I decided to pay them a visit since the showroom is at Toa Payoh too. :D

Here are the damages; ;)

Vinyl L-shaped sofa - S$868

Black glass coffee table - S$349

MBR tv console - S$599

Shoerack - S$188

Glass PC table - S$438

Black office chair - S$138

Dressing table - S$399

Queen sized Maxcoil Executive Deluxe mattress with bedframe - S$1399

Bedroom 2 wardrobe - S$299

Bedroom 3 wardrobe - S$599

Total damages - S$5645.32 (with 7% GST) :(

Didn't shop around to compare prices as I was too lazy and the furnitures are definitely cheaper than Courts. The delivery will be 2 weeks from now and I will post more photos when they come. :)

Edited by euph0bear
 

Share this post


Link to post
Share on other sites

woo hoo, that's a rather big hole in your pocket you've burnt today

but the amount for so many pieces of furniture definitely sounds reasonable :(

 

Share this post


Link to post
Share on other sites
woo hoo, that's a rather big hole in your pocket you've burnt today

but the amount for so many pieces of furniture definitely sounds reasonable :(

Really hope that it's worth it when the goods arrive. :)

 

Share this post


Link to post
Share on other sites

Day 42 Progress

Things are going a bit slow at the moment as my renovation is coming to an end soon. I predict everything will be done by next week. All my carpentry works are completed. What's left now are the installation of toilet accessories, kitchen sink and minor touchups.

Today went up to my unit to supervise the wall mounting of my TV as well as look at the completed carpentry works.

P210408_114502.jpg

P210408_114501.jpg

Completed kitchen cabinet.

P210408_1155.jpg

P210408_1156.jpg

PD doors at the kitchen and MBR.

P210408_114503.jpg

TV wall mounted.

 

Share this post


Link to post
Share on other sites
looks nice, how is the workmanship for the kitchen?

The workmanship of the kitchen cabinet was good. During my 1st inspection of the kitchen cabinet, I saw a door not straight and the gap between the other door was too big. :unsure: I informed my ID and within a day, the fault was fixed. :unsure:

Oh yah... From what I heard from my ID, there was a case of housebreaking in one of the renovating units so all future residents do take care of the security of your flats.

 

Share this post


Link to post
Share on other sites

Oh really? Which block was this?

Cos I have noticed my padlock has been 'locked' on the opposite side of how i would do it before I left, although house is still bare, and don't know if anything is really missing. I've given HDB screeding contractor and the defects contractor the padlock keys but haven't seen any work done in the house. Very strange....

The workmanship of the kitchen cabinet was good. During my 1st inspection of the kitchen cabinet, I saw a door not straight and the gap between the other door was too big. :curse: I informed my ID and within a day, the fault was fixed. :unsure:

Oh yah... From what I heard from my ID, there was a case of housebreaking in one of the renovating units so all future residents do take care of the security of your flats.

 

Share this post


Link to post
Share on other sites
Oh really? Which block was this?

Cos I have noticed my padlock has been 'locked' on the opposite side of how i would do it before I left, although house is still bare, and don't know if anything is really missing. I've given HDB screeding contractor and the defects contractor the padlock keys but haven't seen any work done in the house. Very strange....

I wasn't told which block was it.

But I'm sure that they are always outsiders loitering around the renovating flats. If you use key padlock, then it's still okay. For me, I use number padlock so I'm in a riskier situation than you.

 

Share this post


Link to post
Share on other sites

Your kitchen looks great actually, simple and practical. Although I am still trying to figure this out, where is your sink??

Day 42 Progress

Things are going a bit slow at the moment as my renovation is coming to an end soon. I predict everything will be done by next week. All my carpentry works are completed. What's left now are the installation of toilet accessories, kitchen sink and minor touchups.

Today went up to my unit to supervise the wall mounting of my TV as well as look at the completed carpentry works.

P210408_114501.jpg

Completed kitchen cabinet.

 

Share this post


Link to post
Share on other sites
let me guess, near the washing machine section?

may i know what is the empty bottom on the right for?

Yup, tension_z is right. The sink, which is coming this weekend, is at the other site of the "L", beside the washing machine area.

The bottom right hand, with the empty space below, is my dining top. Just bought 2 bar stools today which will form my mini dining area.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×