Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
jon_g9

Our Project In Clementi

Recommended Posts

Jon, Nice designs, esp your toilets. We too hav similar toilet layouts. We wanted to conceal the pipes but our ID advise us against it. Apparently, my toilet drainage got choked soon after during our reno and we called HDB. So HDB called our neighbour just below us and had their plumber fixed the drainage by removing part of the pipe section and cleared the debris within. So it really depends on the neighbour upstairs. Anyway, your ceilings look great!

thanks for your compliments. so in the end did u conceal your sewage pipes? i hope my drainage don't get choked cos my neighbour downstairs also concealed their sewage pipes...if that happens, it'll be a real mess...

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

the plumber came to install the shower mixers, WCs and the storage heater. at least now it doesn't stink so much...

mixers from Hoe Kee, WCs from SSC and heater is from Best Ceramic in Toh Guan

290308_1.jpg

290308_2.jpg

290308_3.jpg

 

Share this post


Link to post
Share on other sites

bought our lights and installed by the electrician...

living room

290308_4.jpg

dining & dry kitchen

020408_2.jpg

master bedroom

020408_4.jpg

wardrobe & study

020408_3.jpg

this is the PLC that we got...it's the standard square type

020408_1.jpg

 

Share this post


Link to post
Share on other sites

it's been some days since my last post. not much happening since we have to wait for the parquet flooring...glass works for the bathrooms and kitchen was done in the meantime...

100408_1.jpg

100408_2.jpg

 

Share this post


Link to post
Share on other sites
Hi Jon,

Was yr parquet done by yr contractor/Id? How much was it and what was the area? :bangwall:

yeah it's done by my ID. short strip Burmese teak at $3800 including skirting

sorry i don't know the area, it's for all 3 bedrooms

 

Share this post


Link to post
Share on other sites
it's been some days since my last post. not much happening since we have to wait for the parquet flooring...glass works for the bathrooms and kitchen was done in the meantime...

100408_1.jpg

100408_2.jpg

WOW....ur bathroom has the grand hotel theme. GREAT ! :dribble:

 

Share this post


Link to post
Share on other sites

thanks guys for your compliments...will post more pictures on the living & dining flooring later when i can find the time...

it's nearing the end liao...carpentry's starting today so it's gonna be 2 or 3 more weeks before completion

 

Share this post


Link to post
Share on other sites

polishing & waxing completed for the living, dining & kitchen flooring...very glossy for now, before being covered by dust from the carpentry. there're still some cracks in some of the tiles so those guys would prob need to come back to touch up after everything's completed...

170408_1.jpg

170408_2.jpg

170408_3.jpg

something that my ID displayed on the wall...i felt so amused when i saw it...

170408_4.jpg

next update will be on the skirting...stay tuned...

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×