jon_g9 0 Report post Posted April 3, 2008 Jon, Nice designs, esp your toilets. We too hav similar toilet layouts. We wanted to conceal the pipes but our ID advise us against it. Apparently, my toilet drainage got choked soon after during our reno and we called HDB. So HDB called our neighbour just below us and had their plumber fixed the drainage by removing part of the pipe section and cleared the debris within. So it really depends on the neighbour upstairs. Anyway, your ceilings look great!thanks for your compliments. so in the end did u conceal your sewage pipes? i hope my drainage don't get choked cos my neighbour downstairs also concealed their sewage pipes...if that happens, it'll be a real mess... Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 3, 2008 the plumber came to install the shower mixers, WCs and the storage heater. at least now it doesn't stink so much...mixers from Hoe Kee, WCs from SSC and heater is from Best Ceramic in Toh Guan Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 6, 2008 bought our lights and installed by the electrician...living roomdining & dry kitchenmaster bedroomwardrobe & studythis is the PLC that we got...it's the standard square type Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 7, 2008 more lights to show...PLC warm lightshalogen for display corner...where i think i can display my absolut bottles... Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 8, 2008 the aircon installers came and finished up the rest of the aircon works... Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 12, 2008 it's been some days since my last post. not much happening since we have to wait for the parquet flooring...glass works for the bathrooms and kitchen was done in the meantime... Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 14, 2008 parquet materials got delivered...lag time almost over Share this post Link to post Share on other sites
skywolf 0 Report post Posted April 14, 2008 Hi Jon,Was yr parquet done by yr contractor/Id? How much was it and what was the area? Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 14, 2008 Hi Jon,Was yr parquet done by yr contractor/Id? How much was it and what was the area? yeah it's done by my ID. short strip Burmese teak at $3800 including skirtingsorry i don't know the area, it's for all 3 bedrooms Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 15, 2008 flooring's up Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 19, 2008 here's the finished product...after sanding and lacqueringquite satisfied with the colour...such things are so unpredictable Share this post Link to post Share on other sites
applefreak 1 Report post Posted April 20, 2008 so cosy looking Share this post Link to post Share on other sites
Goh 0 Report post Posted April 20, 2008 it's been some days since my last post. not much happening since we have to wait for the parquet flooring...glass works for the bathrooms and kitchen was done in the meantime...WOW....ur bathroom has the grand hotel theme. GREAT ! Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 21, 2008 thanks guys for your compliments...will post more pictures on the living & dining flooring later when i can find the time...it's nearing the end liao...carpentry's starting today so it's gonna be 2 or 3 more weeks before completion Share this post Link to post Share on other sites
jon_g9 0 Report post Posted April 21, 2008 polishing & waxing completed for the living, dining & kitchen flooring...very glossy for now, before being covered by dust from the carpentry. there're still some cracks in some of the tiles so those guys would prob need to come back to touch up after everything's completed...something that my ID displayed on the wall...i felt so amused when i saw it...next update will be on the skirting...stay tuned... Share this post Link to post Share on other sites