samkcy79 0 Report post Posted March 22, 2008 (edited) Renovation Day 6 - More Tiling and wet works Tiles and wet works continue in the kitchen and the toilets...Wall tiling in KitchenNote that paper are being place in between tiles to maintain the gap between the tiles (See macro shots below)Toilet wet works continuesMBR toilet now has cement screedings up to the ceiling.New kitchen entrance sealednow with cement screeding ...Found: Floor tiles for hall and bedroomsBedrooms A huge pile of sand now occupies each bedroomOld Aircon removedAircon has been removed by the Gain City guys on day 3 of hacking. Free of charge service only if they are informed before actually installation of the new aircon unit. That's all for now folks.... Edited March 22, 2008 by samkcy79 Share this post Link to post Share on other sites
applefreak 1 Report post Posted March 22, 2008 your floor tiles are very nicealways like this kind of subtle pattern Share this post Link to post Share on other sites
samkcy79 0 Report post Posted March 22, 2008 your floor tiles are very nicealways like this kind of subtle pattern Hey applefeak, Thank you. Now I am really excited to see the overall effect Cheers!Samantha Share this post Link to post Share on other sites
samkcy79 0 Report post Posted March 23, 2008 Renovation Day 7 (Easter Sunday)We went back to see how the wall tiling in the kitchen goes.. all workers are resting today. Wall tiling is 60% done.Soaking of tiles in waterOur white kitchen! Share this post Link to post Share on other sites
samkcy79 0 Report post Posted March 26, 2008 (edited) Renovation Day 8 - 9 Gate removed (Recess area now exposed) More kitchen wall tiles laidRubbish Chute removedWetworks in KitchenKitchen old entrance sealed by cementWetworks in ToiletsHomogeneous tiles laid in Living hall Edited March 26, 2008 by samkcy79 Share this post Link to post Share on other sites
applefreak 1 Report post Posted March 26, 2008 wow your kitchen is so bright and cheerybet it'll be a pleasure to prepare meals inside Share this post Link to post Share on other sites
samkcy79 0 Report post Posted March 27, 2008 Renovation Day 10No electricity .. no lights. Sorry for the bad pics.More tiles laid in the living room and dining hallKitchen tiles laidWetworks still ongoing in the toiletswow your kitchen is so bright and cheerybet it'll be a pleasure to prepare meals inside HeyYeah... can't wait til completion.CheersSam Share this post Link to post Share on other sites
samkcy79 0 Report post Posted March 29, 2008 (edited) Renovation Day 12 (Handing over of taps and stuffs)Met up with our ID today to hand over the taps and stuffs. The water pipes people also came in today to determine the positions of the pipes. Pretty busy day today!According to our ID, toilet bowls and basins should be installed by Wed! Yipeee!Delivery of taps and stuffsSkirting done for Living hallMore tiles laid in the bedroomsToilets tiles 80% laidKerb between Kitchen and common toiletKitchen Floor tilesLaying of water drainage pipes for kitchen sink Edited March 29, 2008 by samkcy79 Share this post Link to post Share on other sites
samkcy79 0 Report post Posted March 31, 2008 Renovation Day 10-11 (More tiles up and piping works)The tiles we chose for the recess area is finally laid. Also water outlet and inlet in the toilets are up. Skirting also almost done in most bedrooms.Tiles @ recess area (no gate yet)Living hall (Skirting all done up)Dining Hall Kitchen (Fridge and washer base done)BedroomsToiletsToilet bowls and basins deliveredBye bye for now.... Share this post Link to post Share on other sites
Redwyrm 0 Report post Posted March 31, 2008 wow..very impressive reno.. Share this post Link to post Share on other sites
samkcy79 0 Report post Posted April 1, 2008 Renovation Day 12 (New windows installed in kitchen and dining hall-no grills yet!) More updates soon! Share this post Link to post Share on other sites
Redwyrm 0 Report post Posted April 1, 2008 more..more pic.. Share this post Link to post Share on other sites
nautilus 2 Report post Posted April 2, 2008 (edited) more..more pic.. More will be up on Saturday. I'll be a bit busy from now till then.My ID called me up today to give me some bad news and good news. The bad news is that the double glazed sliding windows for the bedrooms are out of production. However, he has managed to ask the supplier to give us casement windows instead at no extra cost. According to my ID, it's supposed to shut out more noise which is good!Other than that, we visited a Teakwood shop down in Furniture Mall and we met an uncle who's a teakwood lover as well. Some stuff we learnt was about different grades of teakwood furniture, why some shops could sell it dirt cheap, while some are so expensive, quality of the finish, etc. In a nutshell the things we learnt were:- dark stained teakwood furniture are usually cheaper as cheaper teakwood can be used due to the hiding of awful wood grains by the stain- natural, smooth finished furniture with nice grains and thick slabs are usually better quality as these are taken from older trees which are more termite resistant and harder (young teak is actually whitish in color and soft)- there are a few grades of teak, from A to C and the cheap young teakwood sapling grade.The morale is you pay for what you get - cheap is not good, and good is never cheap. Take a look around and compare different teakwood furniture before buying. Don't be too compulsive and be taken in be cheap prices. Edited April 2, 2008 by nautilus Share this post Link to post Share on other sites
samkcy79 0 Report post Posted April 5, 2008 Renovation Day 16 (Plastering done)Today we met up with our electrician and ID. Most tiling have been done up. Plastering really made with walls and ceilings smoother!Tata for now.... Share this post Link to post Share on other sites
samkcy79 0 Report post Posted April 6, 2008 Reno Day 17 (Toilet bowl,basin, shower mixer,new kerb) The *forgetten kerb is now up. Toilet bowls, shower mixers and basins in the toilets are also done up. We are especially pleased with the workmanship of the stroage heater guy because he did the copper pipping so well that it's hidden from view as it's being blocked by a pipe! (See pics below) Share this post Link to post Share on other sites