crazycar 0 Report post Posted February 23, 2008 (edited) IntroductionI have been living in Havelock most part of my life. It is with a little sadness that I have to leave this place I have grown acustomed with. However, the good news is that I will be moving to somewhere nearby and maybe even slighly more convenient. Moreover, I will be building this new nest with the person I'm going to spend the rest of my life with. Our new home will be a humble 3-room flat at Jalan Membina. We actually started sourcing for IDs way back in July last year, hoping that we will get our keys in early Q4 07. Thereafter, many weekends were spent meeting IDs, shopping for furnitures, lightings, electrical appliances etc. Q4 07 came and gone and there were still no news of our keys. Finally, on the 10 Jan 08, we got the keys to our dream home. As it was only weeks from CNY, we decided to start our reno only after CNY. It was a good decision, as we have time to inspect the house in detail and let HDB rectify all the defects. We were lucky that there wasn't many. So on the 19 Feb 08, our reno officially started. OK, enough of words. May I present to you some pictures of our new but not completed home. The BeginningIt started from this way back in 2003 ....to this in 2008.This is the block that we will be staying. Edited February 23, 2008 by crazycar Share this post Link to post Share on other sites
applefreak 1 Report post Posted February 23, 2008 first to spamwhoppee :notti: Share this post Link to post Share on other sites
crazycar 0 Report post Posted February 23, 2008 (edited) Our Home - In It's Original ConditionMain GateLiving RoomMaster BedroomCommon BedroomAfter some re-configuration, our common bedroom will become master bedroom cum study area while the master bedroom will become a walk-in wardrobe. Edited February 23, 2008 by crazycar Share this post Link to post Share on other sites
applefreak 1 Report post Posted February 23, 2008 wah your 3D is Share this post Link to post Share on other sites
crazycar 0 Report post Posted February 23, 2008 (edited) Our Home - In It's Original Condition (Continue)KitchenMaster ToiletCommon ToiletAll these we don't like.... So it will be hack hack hack! first to spamwhoppee wah.... u very fast leh. still trying to load more pictures..... very tedious. 3D DrawingsFloor PlanProposed Layout PlanLiving RoomStudy Area3D Drawings (Continue)KitchenEvery Girl's DreamBomb ShelterSo that's how our or lu lu home will look like. Hopefully it will turn out well. Still deciding whether to add some colours but then it will spoil the theme. Edited February 23, 2008 by crazycar Share this post Link to post Share on other sites
skywolf 0 Report post Posted February 23, 2008 Chop chop. 2nd one. Oh wow! The 3D drawings really Makes you feel excited to see the finished product hor? Share this post Link to post Share on other sites
Yang Guo 7 Report post Posted February 23, 2008 woooo nice 3D drawings Share this post Link to post Share on other sites
crazycar 0 Report post Posted February 23, 2008 Thanks for all the praises. Our only worry is whether the place will be too dark or not. Anyway more pictures coming up....... Share this post Link to post Share on other sites
Simpleboi 0 Report post Posted February 23, 2008 Hi neighbour!!Spamming here too Greattttttt pics btw Share this post Link to post Share on other sites
crazycar 0 Report post Posted February 23, 2008 (edited) Week 1Our reno finally started officially on the 19 Feb. The work that will be done will be hacking of the wall between the bedrooms, hacking of kitchen flooring, removing of sanitary wares n some electrical works.Wall between the bedrooms gone. Does the room looks bigger?WC and wash basin at both toilets gone.Kitchen floor hack! Edited February 23, 2008 by crazycar Share this post Link to post Share on other sites
jaCKY777 0 Report post Posted February 23, 2008 Hey crazycar,pardon mi kpo.- so u frm SERS? - existing Havelock flat 3-rm? Owned by u & partner?- new Jln Membina Flat 3-rm? Floor area? Additional ppl gona live 2gether?- hdb buy bak existing flat, e amount u transfer 2 new JM flat.Wats e addition amount of $$$ u need 2 pay? i gues it wld b very minimal.Can PM mi, if u find its inconvenient 2 post here. Jus curious. Share this post Link to post Share on other sites
crazycar 0 Report post Posted February 23, 2008 (edited) Hey crazycar,pardon mi kpo.- so u frm SERS? - existing Havelock flat 3-rm? Owned by u & partner?- new Jln Membina Flat 3-rm? Floor area? Additional ppl gona live 2gether?- hdb buy bak existing flat, e amount u transfer 2 new JM flat.Wats e addition amount of $$$ u need 2 pay? i gues it wld b very minimal.Can PM mi, if u find its inconvenient 2 post here. Jus curious. hhmm.... lots of qns hor. let me try to answer them. - so u frm SERS? > Yes.- existing Havelock flat 3-rm? Owned by u & partner?> Owned by me currently. Actually it was passed down from my late father. Will be adding my wife-to-be as co-owner later though.- new Jln Membina Flat 3-rm? Floor area? Additional ppl gona live 2gether?New. 60 sqm only. Projected only me and my wife-to-be will be living together.- hdb buy bak existing flat, e amount u transfer 2 new JM flat.Wats e addition amount of $$$ u need 2 pay? i gues it wld b very minimal.> Bcos I chose for a like to like replacement i.e. a 3-room flat, there is in fact some surplus from the compensation from HDB. Yeah! My tiles are delivered! Some electrical wiring done. Edited February 23, 2008 by crazycar Share this post Link to post Share on other sites
skywolf 0 Report post Posted February 24, 2008 SERS is always a good thing. You can choose the new unit from the existing pool of other new units and you may/may not need to even top up if it's at the lower floors. My in-laws unit also got SERS, so we have another batch of reno after ours in abt 2-3 yrs time. New flat at no cost. Whoot! Share this post Link to post Share on other sites
jasch 0 Report post Posted February 24, 2008 Hi Crazycar nice pics!! your hosue look cosy from the pics.. all the best for your reno ya!! Share this post Link to post Share on other sites
Keropi 0 Report post Posted February 24, 2008 Hi crazycar, Nice & modern 3D designs you have . Can tell you also go for the black, grey & white theme Btw, may I noe if your aircon trucking comes after/before wetworks? My reno is scheduled to start on 3Mar. Ist on the schedule is electrical works follow by aircon. On the other hand, was told by the aircon vendor that wet works must be done first b4 aircon trucking. We are kinda confused and who's right .ThanksKeropi Share this post Link to post Share on other sites