alexter 0 Report post Posted March 5, 2008 (edited) bro, i was recommended Joven. mine is placed in the common toilet thou.regards Got photo to see? you got the 15L or 25L.just a note, you can use the bot and nut to hold the tank.i will get the 15L Joven one, and will cut a 30cm by 40 cm hole and ceiling mount it.then will do a small L-box to cover it.Hope the result is look good.I got the Ariston 30L one coz i got 2 rainshowers. All my sanitary fixtures to be up this thurs. Will get the photos up. =)don't mind me saying...Both your common bath area looks small, would be interesting to see how & where the 30L tank and the rainshower be. Edited March 5, 2008 by alexter Share this post Link to post Share on other sites
alexter 0 Report post Posted March 5, 2008 (edited) Here are my 2 Ventilating Fan.My 2 top windows panel are removed. Edited March 5, 2008 by alexter Share this post Link to post Share on other sites
popeye gal 0 Report post Posted March 5, 2008 hi alexter,where & how much you buy the two Ventilating Fan? Share this post Link to post Share on other sites
alexter 0 Report post Posted March 5, 2008 (edited) hi alexter,where & how much you buy the two Ventilating Fan? My contractor buy for me.i ask him to mount it on a piece of acrylic then mount on the window.he charge me $200 each with installation. Edited March 5, 2008 by alexter Share this post Link to post Share on other sites
alexter 0 Report post Posted March 5, 2008 Here i took some photo of the piping above the false ceiling in the toilet.As you all can see behind the tiles are only the same metal plate as the fales ceiling.The height clearance inside is about 25cm, cannot hide the heater there. Share this post Link to post Share on other sites
haroldism 0 Report post Posted March 5, 2008 hi, alex, our Joven heater as below, Share this post Link to post Share on other sites
rav3n 0 Report post Posted March 5, 2008 Hi alexter, hmm..my storage tank will be at the top corner in the common toilet...as for the rainshowers, will see after the installations..hurhur Share this post Link to post Share on other sites
alexter 0 Report post Posted March 6, 2008 ok i will have the lights up on SAT.the heater will be up on SAT.my sofa, dinning set, fridge and Alter table coming on SAT.will have a busy SAT, those who want to come see see are welcome.Sunday the painters will come to paint and touch up. Share this post Link to post Share on other sites
alexter 0 Report post Posted March 6, 2008 The Citigas guy took 10min to install the gas pipe in the morning.My kitchen carpentery was up yesterday.the right side is for my washer cum dryer and oven.here is my drawers and hob area.And the solid surface top guys were here last night to do the measurement.No light yet, hence touch light is the way to go.they were fast... 20 min by staple the frame to get the layout for the top. Share this post Link to post Share on other sites
alexter 0 Report post Posted March 8, 2008 OK i'm going over to wait for the delivery of all the stuffs.photo will be up very soon.ok i will have the lights up on SAT.the heater will be up on SAT.my sofa, dinning set, fridge and Alter table coming on SAT.will have a busy SAT, those who want to come see see are welcome.Sunday the painters will come to paint and touch up. Share this post Link to post Share on other sites
alexter 0 Report post Posted March 8, 2008 (edited) Today some of my purchase delivered.Dining table set from Zen Tradition LivingCoin Rx Dining Table & Palazzo Dining Chair Sofa set from MONDI LifestyleUzzanoRefrigerator from MitsubishiMR-CU46TAll of those still in wrap.As the photos in my laptop and i yet to upload them, hence will be up tomorrow.My lights are done today.and a major work....finally the heater is up.a few hiccup here and there.not easy to cut the hole, and took about 30min by my contractor.the heater installer was 1hr late, and they made some boo boo.Ask him to measure properly to drill the holes.young guys wanted to do a fast job, end up drill to far apart.spend 40min trying to solve this problem.lucky i got creative solution for them.then still want to a fast job, when mounting it up in the ceiling... only manage to bot up 3 nuts.they spend another 20min trying to solve the problem, hammer at the bracket trying to make it fit in.they so happy when i tell them just leave it... with 3 nuts, as it strong enough to hold the small 15L tank.problem 3... ask they to test which is the cold and hot pipes.they say standard one left is for hot water and right one is for cold.then after they install the cold water pipe into the heater, they on the tap to test... well you guess it....wrong pipe. hence have to redo the piping into the heater.next problem 4.after installed and tested all the piping correctly, its time to wire it up.Simple right? 3 colour wires in the connector.i have to teach them how to hide the wires. (fair enough as they are not electrician hence don't know how and where the wires are above the fales ceiling)but then they took 20min just to figure how the wires join the connector and screw them in.i took 20sec look and tell them how and where to put the wires.then 10 min still not done, because they separate the 3 wires too short. i have to tell them to make the 3 wires longer which will be easier to put in. and its done in 3mins. On the heater to test.... perfect, it works.well is that the end? what else can go wrong?after the test, he has to close back the wiring case.... he break one of the case screw thread.now only can screw in one screw.one simple mounting only took them 3hr 30min. more story with photo tomorrow. !! Edited March 8, 2008 by alexter Share this post Link to post Share on other sites
applefreak 1 Report post Posted March 8, 2008 hasty people tend to cause more delayhope they learnt their lessons this timeif not next time you gotta charge tuition fees liao !! Share this post Link to post Share on other sites
rinarobert 0 Report post Posted March 8, 2008 hi alexter,may i know how much they quote you for the two instant heater that you have canceled?thanks Share this post Link to post Share on other sites
alexter 0 Report post Posted March 8, 2008 (edited) hi alexter,may i know how much they quote you for the two instant heater that you have canceled?thankswell their price not that good for the 707.the compact $230 and protek $278 (with installation)you can try Hong Liang or maximum credit. but i think Cheaper at the IMM 3rd floor at the corner, between the carpark entrance and the lift. Edited March 9, 2008 by alexter Share this post Link to post Share on other sites
alexter 0 Report post Posted March 9, 2008 (edited) camera, lights, action!the unboxing of the lights.kitchen light. the entrance foyer light.lights on, for the dinning area, entrance area and shoe rack area.Mid living room lighting. with 3 tube of lights and I/C unit to control either 1,2 or 3 tube on. Edited March 9, 2008 by alexter Share this post Link to post Share on other sites