nautilus

Total Makeover Quotation For 5-room

Recommended Posts

Hi,

I've just received a quotation from one of the ID firms for my resale 5-rm flat (120 sqm). I will be doing a total makeover including windows, electrical works and piping (cold water). Is this quotation okay for all that i'm doing? Thanks.

Demolition works

1 Hacking for living hall/ dining hall existing floor tiles

2 Hacking for all bedrooms existing skirting

3 Hacking for kitchen wall and floor tiles

4 Hacking for both bathroom wall and floor tiles

5 Dismantle and dispose off of existing kitchen cabinet/sink support

6 Dismantle and dispose of existing both bathroom pedestal pans

7 Dismantle and dispose of existing both bathroom wash basin

8 Dismantle and dispose of both bathroom door / door frames

Masonry works

9 Supply of Grade A 2ftx2ft homogenous flooring for living/dining

10 Supply labour and cement to lay 2ftx2ft homogenous flooring for

living hall/dining includes skirting

11 Supply and lay laminated flooring for all bedroom c/w wooden skirting

12 Supply and lay heavy-duty homogenous/ceramic flooring for

kitchen ( $2.50 psf ) ( c/w 5 years warranty )

13 Supply and lay non-slip homogenous/ceramic flooring for both

bathrooms ( $2.50 psf ) ( c/w 5 years warranty )

14 Supply and lay full height designers' ceramic wall tiles for kitchen

expose wall only ( $2.00 psf ) ( < 330 sqft ) ( c/w 5 years warranty )

15 Supply and lay full height designers' ceramic wall tiles for both

bathrooms ( $2.00 psf ) ( < 380 sqft ) ( c/w 5 years warranty )

16 Application of water proofing membrane for kitchen and both

bathrooms ( c/w 5 years warranty )

Plumbing works

17 Supply labour and materials to change copper piping for kitchen

and both bathrooms (cold)

18 Supply labour & materials to run washing machine inlet/outlet pipe

19 Supply labour and material to run sink inlet/outlet pipe

20 Supply labour to install 2 sets pedestal pans and wash basins

21 Supply labour to install 2 sets instant heater

22 Supply labour to install 2 sets toilet accessories

Miscellaneous

23 Supply and install white powdered-coated Aluminium bi-fold door

for both bathrooms

24 Application of HDB permits

25 Lay protection sheet for flooring

26 Chemical washing for whole unit flooring

Package " $15,888.00 "

Additional Items

Masonry Works

27 Hacking & create new door opening for kitchen entrance. 1 lot Ls $100.00

28 Supply & erect new hollow block wall to seal existing kitchen entrance. 1 lot Ls $180.00

29 Supply & construct concrete kitchen cabinet base with side tiles. 1 lot Ls $220.00

30 Supply & construct concrete fridge base with tiling. 1 no Ls $80.00

31 Supply & construct shower kerbs for 2 bedrooms. 2 nos $70.00 $140.00

32 Supply & construct concrete washing machine base with tiling. 1 no Ls $80.00

33 Supply & construct concrete base for side cabinet near rubbish chute 1 no Ls $80.00

& downpipe area.

34 Additional top-up charges from laminated flooring upgrade to homogenous 1 lot Ls " $1,380.00 "

flooring with skirting for 3 bedrooms.

Carpentry Works

35 "Supply & construct ""Alumix"" full height aluminium sliding door with" 1 set Ls " $1,300.00 "

laminated & glass finish for store room area.

36 Supply & construct laminated top & bottom kitchen cabinet c/w solid 20 ft " $2,000.00 " F.O.C.

plywood in ABS trimming & designer handles.

37 Supply & construct additional kitchen cabinet Length. (Total 21 ft) 1 ft $100.00 $100.00

38 Supply & construct side panelling between washing machine area. 1 unit Ls $180.00

39 Supply & construct full height kitchen cabinet for built-in oven/microwave 2 ft $200.00 $400.00

compartment.

40 Supply & install stainless steel backing at cooker area. 1 piece Ls $230.00

41 Supply & install frosted glass panel with aluminium framing for kitchen cabinet. 1 piece $120.00 F.O.C.

42 Supply & install stainless steel disk rack. 1 no $80.00 F.O.C.

43 Supply & install cutlery tray. 1 no $40.00 F.O.C.

44 "Supply & construct ""Bellus"" L-shape solid surface for kitchen cabinet top." 10.5 ft $68.00 $714.00

45 Supply labour to cut opening for sink & cooker hood on solid surface top. 2 nos $70.00 F.O.C.

46 Supply & construct 6ft L full height laminated wardrobe c/w casement doors 1 no " $1,180.00 " " $1,180.00 "

for 2 bedrooms.

47 Supply & construct L-shape full height laminated wardrobe with casement 1 unit Ls " $2,100.00 "

door for MDR.

48 Supply & construct downpipe cabinet with low height laminated swing door 1 unit $500.00 F.O.C.

for rubbish chute at kitchen area.

Additional Items

Aluminium & Glass Works

49 Supply & install 10mm thk tempered shower screen for 2 toilets. 2 nos $380.00 $760.00

50 Supply & install Natural/bronze aluminium sliding grilles. For whole house 240 ft $5.00 " $1,200.00 "

except toilet areas.

51 Supply & install Natural/Bronze casement/sliding aluminium window with 130 ft $20.00 " $2,600.00 "

double glaze glass panel for 3 bedrooms.

52 Supply & install Natural/Bronze casement/sliding aluminium window with 120 ft $12.50 " $1,500.00 "

"single glaze glass panel for kitchen, living & dining areas."

53 Supply & install louvers aluminium nacro window with wired glass for 2 toilets. 2 sets $230.00 $460.00

54 Supply & install 10mm thk tempered frosted swing glass door for kitchen 1 no Ls $520.00

entrance c/w wall hinges & handle.

Others

55 Supply & construct fibrous L-board plaster ceiling **** & MBR area. 1 lot Ls $380.00

56 "Supply & construct fibrous false ceiling ****/dining, entrance entrance & MBR." 500 ft $2.50 " $1,250.00 "

57 Supply & construct partition act as bulkhead for store room sliding door. 1 lot Ls $180.00

58 Supply labour to replaces new main door lockset. 1 no Ls $22.00

59 "Painting for whole house using ICI/Nippon paint c/w 4+1 colours, including" 1 lot Ls " $1,500.00 "

"all doors/frame, main gate & all pipings."

60 Supply & replaces existing cast-iron sewage piping to new Pvc downpipe. 1 lot Ls $780.00

61 Haulage fees. 1 lot Ls " $1,000.00 "

Sub-Total For Renovation Works. : " $36,504.00 "

Electrical Works (based on MK normal switches)

62 Wiring points for lighting c/w switches. 36 nos $30.00 " $1,080.00 "

63 2-ways design switches. 2 nos $50.00 $100.00

64 2x13A power points. 25 nos $55.00 " $1,375.00 "

65 15A power point for aircon. 1 no $100.00 $100.00

66 20A heater switch & wiring point. 2 nos $100.00 $200.00

67 Cooker hood & hood point. 1 no $95.00 $95.00

68 SCV socket point. 4 nos $90.00 $360.00

69 SCV splitter. 1 no $35.00 $35.00

70 Telephone point. 2 nos $40.00 $80.00

71 Installation of light fittings & fixtures. 36 nos $8.00 $288.00

72 New Distribution Board. 1 unit Ls $360.00

73 Earth wiring point to piping. 1 unit Ls $120.00

74 Power Supply Testing & commissioning. 1 lot Ls $180.00

Sub-Total For Electrical Works. " $4,373.00 "

Total Amount : " $40,877.00 "

Remarks :

1 Window at MBR behind L-shape wardrobe not included.

2 "Kitchen & toilet accessories by owner, except otherwise stated."

3 All custom-made & built-in furniture c/w external: selected laminated with internal carcass

in white PVC finished.

4 All kitchen cabinet complete with doors in selected laminated finish with ABS trimming

& internal carcass in white PVC finished.

Terms Of Payment :

10% Upon confirmation as deposit;

40% Upon before delivery of materials/goods to site;

40% Upon commencement of carpentry works;

10% Upon completion & hand-over.

Edited by nautilus
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Hihi...

Your electrical works costs $4k+? Oh wow! Mine's a 5 rm resale unit - 126sqm but the contractors (i had not finalised which to go to) quoted me $1k+ to $2.4k (highest). ;)

Perhaps you can get other contractors quotations? Perhaps bcoz yrs is id... so they factor the id costs inside... :D

 

Share this post


Link to post
Share on other sites
Hihi...

Your electrical works costs $4k+? Oh wow! Mine's a 5 rm resale unit - 126sqm but the contractors (i had not finalised which to go to) quoted me $1k+ to $2.4k (highest). ;)

Perhaps you can get other contractors quotations? Perhaps bcoz yrs is id... so they factor the id costs inside... :D

I feel that the electrical works is a bit on the high side too. Do you think it will be too troublesome to engage an external contractor to do just the electrical works considering that I will be making false ceiling/L-box for living/dining/MBR? Thanks.

 

Share this post


Link to post
Share on other sites

Hihi..

Personally whd prefer 1 main con to do all. But then again, you may have to find one tt can be trusted. Of course hubby n I will do spot chks @ odd timings still (1/2 day leave on an ad-hoc basis), but not tt freq like daily lor. Unless you have the time to supervise each part of the work. ;)

Perhaps you can chk out other forummers t-blogs in here. Some had outsourced the electrical part to other ppl. :D

Edited by skywolf
 

Share this post


Link to post
Share on other sites

hi,

That was the part that i'm afraid of also. If i let another contractor do the electricals, i may end up being very bo-eng, but the $$$$ saved is very tempting indeed. ;)

 

Share this post


Link to post
Share on other sites

Hi nautilud

I find the electrical price quite reasonable considering the number of lighting & power point you have. My advice is to let once company or ID handle the electrical work as well. This is so that should there be any issues you just have to go back to one party and let them coordinate & arrange everything saving you time and less headache as to who's responsible should any dispute arises. What's more you can quote together with your other renovation cost and hold off the final 10% until you are satisfied and according to the contract.

Speaking from experiences :sport-smiley-003: .

 

Share this post


Link to post
Share on other sites
Hi nautilud

I find the electrical price quite reasonable considering the number of lighting & power point you have. My advice is to let once company or ID handle the electrical work as well. This is so that should there be any issues you just have to go back to one party and let them coordinate & arrange everything saving you time and less headache as to who's responsible should any dispute arises. What's more you can quote together with your other renovation cost and hold off the final 10% until you are satisfied and according to the contract.

Speaking from experiences :sport-smiley-003: .

Hi lifestyle,

Thanks for the advice. Besides the electricals, what is your opinion on the rest of the quote? Thanks.

 

Share this post


Link to post
Share on other sites

I've this ID company that having renovation package for a 5 room resale flat for only S$21988 and it include quite a number of stuff other than you have listed. If you need info you can PM me.

 

Share this post


Link to post
Share on other sites
Hi,

I've just received a quotation from one of the ID firms for my resale 5-rm flat (120 sqm). I will be doing a total makeover including windows, electrical works and piping (cold water). Is this quotation okay for all that i'm doing? Thanks.

Demolition works

1 Hacking for living hall/ dining hall existing floor tiles

2 Hacking for all bedrooms existing skirting

3 Hacking for kitchen wall and floor tiles

4 Hacking for both bathroom wall and floor tiles

5 Dismantle and dispose off of existing kitchen cabinet/sink support

6 Dismantle and dispose of existing both bathroom pedestal pans

7 Dismantle and dispose of existing both bathroom wash basin

8 Dismantle and dispose of both bathroom door / door frames

Masonry works

9 Supply of Grade A 2ftx2ft homogenous flooring for living/dining

10 Supply labour and cement to lay 2ftx2ft homogenous flooring for

living hall/dining includes skirting

11 Supply and lay laminated flooring for all bedroom c/w wooden skirting

12 Supply and lay heavy-duty homogenous/ceramic flooring for

kitchen ( $2.50 psf ) ( c/w 5 years warranty )

13 Supply and lay non-slip homogenous/ceramic flooring for both

bathrooms ( $2.50 psf ) ( c/w 5 years warranty )

14 Supply and lay full height designers' ceramic wall tiles for kitchen

expose wall only ( $2.00 psf ) ( < 330 sqft ) ( c/w 5 years warranty )

15 Supply and lay full height designers' ceramic wall tiles for both

bathrooms ( $2.00 psf ) ( < 380 sqft ) ( c/w 5 years warranty )

16 Application of water proofing membrane for kitchen and both

bathrooms ( c/w 5 years warranty )

Plumbing works

17 Supply labour and materials to change copper piping for kitchen

and both bathrooms (cold)

18 Supply labour & materials to run washing machine inlet/outlet pipe

19 Supply labour and material to run sink inlet/outlet pipe

20 Supply labour to install 2 sets pedestal pans and wash basins

21 Supply labour to install 2 sets instant heater

22 Supply labour to install 2 sets toilet accessories

Miscellaneous

23 Supply and install white powdered-coated Aluminium bi-fold door

for both bathrooms

24 Application of HDB permits

25 Lay protection sheet for flooring

26 Chemical washing for whole unit flooring

Package " $15,888.00 "

Additional Items

Masonry Works

27 Hacking & create new door opening for kitchen entrance. 1 lot Ls $100.00

28 Supply & erect new hollow block wall to seal existing kitchen entrance. 1 lot Ls $180.00

29 Supply & construct concrete kitchen cabinet base with side tiles. 1 lot Ls $220.00

30 Supply & construct concrete fridge base with tiling. 1 no Ls $80.00

31 Supply & construct shower kerbs for 2 bedrooms. 2 nos $70.00 $140.00

32 Supply & construct concrete washing machine base with tiling. 1 no Ls $80.00

33 Supply & construct concrete base for side cabinet near rubbish chute 1 no Ls $80.00

& downpipe area.

34 Additional top-up charges from laminated flooring upgrade to homogenous 1 lot Ls " $1,380.00 "

flooring with skirting for 3 bedrooms.

Carpentry Works

35 "Supply & construct ""Alumix"" full height aluminium sliding door with" 1 set Ls " $1,300.00 "

laminated & glass finish for store room area.

36 Supply & construct laminated top & bottom kitchen cabinet c/w solid 20 ft " $2,000.00 " F.O.C.

plywood in ABS trimming & designer handles.

37 Supply & construct additional kitchen cabinet Length. (Total 21 ft) 1 ft $100.00 $100.00

38 Supply & construct side panelling between washing machine area. 1 unit Ls $180.00

39 Supply & construct full height kitchen cabinet for built-in oven/microwave 2 ft $200.00 $400.00

compartment.

40 Supply & install stainless steel backing at cooker area. 1 piece Ls $230.00

41 Supply & install frosted glass panel with aluminium framing for kitchen cabinet. 1 piece $120.00 F.O.C.

42 Supply & install stainless steel disk rack. 1 no $80.00 F.O.C.

43 Supply & install cutlery tray. 1 no $40.00 F.O.C.

44 "Supply & construct ""Bellus"" L-shape solid surface for kitchen cabinet top." 10.5 ft $68.00 $714.00

45 Supply labour to cut opening for sink & cooker hood on solid surface top. 2 nos $70.00 F.O.C.

46 Supply & construct 6ft L full height laminated wardrobe c/w casement doors 1 no " $1,180.00 " " $1,180.00 "

for 2 bedrooms.

47 Supply & construct L-shape full height laminated wardrobe with casement 1 unit Ls " $2,100.00 "

door for MDR.

48 Supply & construct downpipe cabinet with low height laminated swing door 1 unit $500.00 F.O.C.

for rubbish chute at kitchen area.

Additional Items

Aluminium & Glass Works

49 Supply & install 10mm thk tempered shower screen for 2 toilets. 2 nos $380.00 $760.00

50 Supply & install Natural/bronze aluminium sliding grilles. For whole house 240 ft $5.00 " $1,200.00 "

except toilet areas.

51 Supply & install Natural/Bronze casement/sliding aluminium window with 130 ft $20.00 " $2,600.00 "

double glaze glass panel for 3 bedrooms.

52 Supply & install Natural/Bronze casement/sliding aluminium window with 120 ft $12.50 " $1,500.00 "

"single glaze glass panel for kitchen, living & dining areas."

53 Supply & install louvers aluminium nacro window with wired glass for 2 toilets. 2 sets $230.00 $460.00

54 Supply & install 10mm thk tempered frosted swing glass door for kitchen 1 no Ls $520.00

entrance c/w wall hinges & handle.

Others

55 Supply & construct fibrous L-board plaster ceiling **** & MBR area. 1 lot Ls $380.00

56 "Supply & construct fibrous false ceiling ****/dining, entrance entrance & MBR." 500 ft $2.50 " $1,250.00 "

57 Supply & construct partition act as bulkhead for store room sliding door. 1 lot Ls $180.00

58 Supply labour to replaces new main door lockset. 1 no Ls $22.00

59 "Painting for whole house using ICI/Nippon paint c/w 4+1 colours, including" 1 lot Ls " $1,500.00 "

"all doors/frame, main gate & all pipings."

60 Supply & replaces existing cast-iron sewage piping to new Pvc downpipe. 1 lot Ls $780.00

61 Haulage fees. 1 lot Ls " $1,000.00 "

Sub-Total For Renovation Works. : " $36,504.00 "

Electrical Works (based on MK normal switches)

62 Wiring points for lighting c/w switches. 36 nos $30.00 " $1,080.00 "

63 2-ways design switches. 2 nos $50.00 $100.00

64 2x13A power points. 25 nos $55.00 " $1,375.00 "

65 15A power point for aircon. 1 no $100.00 $100.00

66 20A heater switch & wiring point. 2 nos $100.00 $200.00

67 Cooker hood & hood point. 1 no $95.00 $95.00

68 SCV socket point. 4 nos $90.00 $360.00

69 SCV splitter. 1 no $35.00 $35.00

70 Telephone point. 2 nos $40.00 $80.00

71 Installation of light fittings & fixtures. 36 nos $8.00 $288.00

72 New Distribution Board. 1 unit Ls $360.00

73 Earth wiring point to piping. 1 unit Ls $120.00

74 Power Supply Testing & commissioning. 1 lot Ls $180.00

Sub-Total For Electrical Works. " $4,373.00 "

Total Amount : " $40,877.00 "

Remarks :

1 Window at MBR behind L-shape wardrobe not included.

2 "Kitchen & toilet accessories by owner, except otherwise stated."

3 All custom-made & built-in furniture c/w external: selected laminated with internal carcass

in white PVC finished.

4 All kitchen cabinet complete with doors in selected laminated finish with ABS trimming

& internal carcass in white PVC finished.

Terms Of Payment :

10% Upon confirmation as deposit;

40% Upon before delivery of materials/goods to site;

40% Upon commencement of carpentry works;

10% Upon completion & hand-over.

Hey nautilus,

Resale flat reno is like dat 1. Demolition works by itself, already add up 2 thousands of $$$. Then gota add in e new works' cost, it wil b a hefty sum. :rolleyes:

Aniway, personally i find

- e quotation pricing is quite reasonable.

- e items r very clearly listed out. (No hidden cost) .

- e elect quote is not high, considering e nos. & types of pts & works.

- frm e way e quotation is itemized, i believe they r quite organize & detail in their work. :notti:

If u were 2 get another quotation frm another ID co, mayb u wld b able 2 judge e pricing. But i gues dis quotation is a very gd benchmark. :dribble:

:yamseng:

Can PM mi e ID co? Would like 2 find out more abt them. :wacko:

:dunno:

 

Share this post


Link to post
Share on other sites
Hey nautilus,

Resale flat reno is like dat 1. Demolition works by itself, already add up 2 thousands of $$$. Then gota add in e new works' cost, it wil b a hefty sum. !!

Aniway, personally i find

- e quotation pricing is quite reasonable.

- e items r very clearly listed out. (No hidden cost) .

- e elect quote is not high, considering e nos. & types of pts & works.

- frm e way e quotation is itemized, i believe they r quite organize & detail in their work. :P

If u were 2 get another quotation frm another ID co, mayb u wld b able 2 judge e pricing. But i gues dis quotation is a very gd benchmark. :D

:bow:

Can PM mi e ID co? Would like 2 find out more abt them. :angry:

!!

Hi,

Thanks for your comments on this. After going through some quotes from differents ID's, it seems that the price given is reasonable. Please check your PM. :angry:

Nautilus

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×