h4happy 1 Report post Posted February 18, 2008 Hello WUDont mind tell you where is your place?I bet your reno cost you at least $500K++??HAPPY Share this post Link to post Share on other sites
yoongf 11 Report post Posted February 19, 2008 Hmm.. 800K - 850K all in? Including authority fees, consultancy, carpentry, exclude loose furniture? Share this post Link to post Share on other sites
wuga98 0 Report post Posted February 19, 2008 (edited) The place is in serangoon gardens, it will cost >$500k. Hello WUDont mind tell you where is your place?I bet your reno cost you at least $500K++??HAPPY!! !! at this pt, no telling where this will lead us. !! Hmm.. 800K - 850K all in? Including authority fees, consultancy, carpentry, exclude loose furniture? Edited February 19, 2008 by wuga98 Share this post Link to post Share on other sites
wuga98 0 Report post Posted February 22, 2008 Here is the pic i took at about 4pm today, the first storey is done, they will cast the 2nd storey next week. Share this post Link to post Share on other sites
applefreak 1 Report post Posted February 22, 2008 wah that's fast Share this post Link to post Share on other sites
wuga98 0 Report post Posted February 28, 2008 (edited) Took this today at the site after lunch. Hopefully we can see more of the 2nd floor next week. Edited February 28, 2008 by wuga98 Share this post Link to post Share on other sites
wuga98 0 Report post Posted March 16, 2008 sorry, was really busy running around trying to agreed on the dry laying of the marbles and also getting the final design of the koi pond done. Casting for both floor almost done, hope to see the third by end of next week. Share this post Link to post Share on other sites
wuga98 0 Report post Posted June 17, 2008 (edited) It has been some time since i have posted anything as an update, i have quite a bit of pics and it's difficult to do it one by one but i will try. This is what it looks like after about 3 mths of hiatus from posting. First floor Main entrance, different angle of it. I have actually forgotten how to post pics, will post the rest tonight. Edited June 17, 2008 by wuga98 Share this post Link to post Share on other sites
BunBun 5 Report post Posted June 17, 2008 How long would it take to be completed? It looks like 60% is completed now Share this post Link to post Share on other sites
junxian 0 Report post Posted June 17, 2008 eyes opener Share this post Link to post Share on other sites
wuga98 0 Report post Posted June 17, 2008 (edited) The roof covered and most of the false ceiling except for master bedroom bathroom and 1 bedroom on the first floor not done yet. I cannot gage if it is 60% but i suspect fairly. As all the plumbing conceal parts and cassette aircon have been installed and plastered. I am anticipating TOP in end August. How long would it take to be completed? It looks like 60% is completed now Edited June 17, 2008 by wuga98 Share this post Link to post Share on other sites
BunBun 5 Report post Posted June 17, 2008 I see! Think you will have high ceiling which would not make the place look small & cramped either. More pix of your completed place when its done. The roof covered and most of the false ceiling except for master bedroom bathroom and 1 bedroom on the first floor not done yet. I cannot gage if it is 60% but i suspect fairly. As all the plumbing conceal parts and cassette aircon have been installed and plastered. I am anticipating TOP in end August. Share this post Link to post Share on other sites
wuga98 0 Report post Posted June 17, 2008 2 more pics on the frontal Share this post Link to post Share on other sites
wuga98 0 Report post Posted June 17, 2008 A few shots of the airwell within the house and also the feature wall which stretched from airwell to the back of the house. The whole wall will be cladded wiith craft stones. Share this post Link to post Share on other sites