Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
wuga98

Dream House - We Did It Our Way!

Recommended Posts


Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

The place is in serangoon gardens, it will cost >$500k. :sport-smiley-004:

Hello WU

Dont mind tell you where is your place?

I bet your reno cost you at least $500K++??

HAPPY

!! !! at this pt, no telling where this will lead us. !!

Hmm.. 800K - 850K all in? Including authority fees, consultancy, carpentry, exclude loose furniture?
Edited by wuga98
 

Share this post


Link to post
Share on other sites

Took this today at the site after lunch. Hopefully we can see more of the 2nd floor next week.

:yamseng:

cowdray6resizeqg6.jpg

Edited by wuga98
 

Share this post


Link to post
Share on other sites

sorry, was really busy running around trying to agreed on the dry laying of the marbles and also getting the final design of the koi pond done.

Casting for both floor almost done, hope to see the third by end of next week.

cowdray8resizesg6.jpg

cowdray9resizeca5.jpg

 

Share this post


Link to post
Share on other sites

It has been some time since i have posted anything as an update, i have quite a bit of pics and it's difficult to do it one by one but i will try. This is what it looks like after about 3 mths of hiatus from posting.

First floor :dancingqueen:

Main entrance, different angle of it.

img0102ph8.jpg

img01021kq4.jpg

img01022gt0.jpg

img01023yz6.jpg

img01024sr0.jpg

I have actually forgotten how to post pics, will post the rest tonight. :dunno:

Edited by wuga98
 

Share this post


Link to post
Share on other sites

The roof covered and most of the false ceiling except for master bedroom bathroom and 1 bedroom on the first floor not done yet. I cannot gage if it is 60% but i suspect fairly. As all the plumbing conceal parts and cassette aircon have been installed and plastered.

I am anticipating TOP in end August. :dancingqueen:

How long would it take to be completed? It looks like 60% is completed now
Edited by wuga98
 

Share this post


Link to post
Share on other sites

I see! Think you will have high ceiling which would not make the place look small & cramped either. :)

More pix of your completed place when its done. :dribble:

The roof covered and most of the false ceiling except for master bedroom bathroom and 1 bedroom on the first floor not done yet. I cannot gage if it is 60% but i suspect fairly. As all the plumbing conceal parts and cassette aircon have been installed and plastered.

I am anticipating TOP in end August. :dancingqueen:

 

Share this post


Link to post
Share on other sites

A few shots of the airwell within the house and also the feature wall which stretched from airwell to the back of the house. The whole wall will be cladded wiith craft stones. :dancingqueen:

img0105pw2.jpg

img0106dq7.jpg

img01061lg1.jpg

img01062qa9.jpg

img01063zn0.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×